The following table refers to NRC-approved power uprate applications. The table shows the ADAMS accession number for (1) each plant's power uprate application, (2) any supplement to the application, and (3) the license amendment approving the application and allowing the licensee to increase power. These documents illustrate the information that the NRC staff requires in order to complete a power uprate review.

NRC encourages licensees to review the documents listed in the table before preparing a power uprate application. Addressing the information contained in these documents below may improve the quality of the application, thereby reducing the number of RAIs, and expedite the staff's review.

On this page:

Nine Mile Point 2
Docket Nos. 50-410

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Applcation Information

Date Description Adams
Accession No.
05/27/2009 License Amendment Request, Extended Power Uprate ML091610103

To top of page

Supplement Information

Date Description Adams
Accession No.
08/28/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Alternating Stress Ratios  Original Licensed Thermal Power ML092460550
08/28/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Stress Assessment – CLTP – Attachment 1 ML092460595
08/28/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Stress Assessment – CLTP – Attachment 2 ML092460596
08/28/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Stress Assessment – CLTP – Attachment 3 ML092460553
12/23/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Mechanical & Civil Engineering – Steam Dryer Evaluation ML100190072
12/23/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Limit Curve Analysis ML100190073
12/23/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  CDI Report No. 08-08NP – CLTP Power Level ML100190074
12/23/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  CDI Report No. 09-26NP - Stress Assessment, Pg 62 ML100190075
12/23/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  CDI Report No. 09-26NP – Stress Assessment, Pg 63-130 ML100190076
12/23/2009 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  SAFER/GESTR Loss-of-Coolant Accident Analysis ML100190077
02/19/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  High Pressure Turbine Rotor ML100550599
04/16/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Plant Parameters for CLTP (current licensed thermal power) ML101120658
05/07/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Strain Gage Arrays ML101380307
06/03/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Boraflex Racks ML101610168
06/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Steam Dryer and Probabilistic Risk Assessment ML101900447
06/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  CDI Report No. 10-09NP – Steam Dryer Loads ML101900448
06/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  CDI Report NO. 10-10NP – Acoustic and Low Frequency Hydrodynamic Loads at CLTP ML101900449
06/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Main Steam Line Strain Gage Data Reduction ML101900450
06/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Low Enriched UO2 Pin Lattice in Water ML102170185
07/09/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Non-Proprietary Version of Continuum Dynamics, Inc. Report 10-11. ML101950495
07/09/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Stress Assessment – Using Acoustic Circuit Model Rev 4.1, Rev. 0, Cover through Chapter 5 ML101950497
07/09/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Stress Assessment – Using Acoustic Circuit Model Rev 4.1, Rev. 0, Chapter 6 through End. ML101950498
07/28/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Steam Dryer Vertical Support Plates ML102170186
07/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Steam Dryer Hood Support ML102170184
07/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Stress Evaluation of Steam Dryer Modifications ML102170295
10/08/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Revised Peak Containment Pressure Analysis ML102920333
10/28/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Licensing Basis Peak Clad Temperature ML103080202
11/05/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Licensing Basis Peak Clad Temperature ML103130512
11/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Steam Dryer Loads from In-Plant Measurements ML103500528
11/30/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  CDI Report No.10-10NP – Acoustic and Low Frequency Hydrodynamic Loads at CLTP ML103500529
12/10/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Steam Dryer Analysis Methodology ML103500525
12/13/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Spent Fuel Pool Criticality Analysis ML103500364
12/13/2010 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Holtec Spent Fuel Storage Racks ML103500365
01/19/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Loss of Coolant Accident Analysis ML110250719
01/31/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Low Power Coherence Data ML110400369
01/31/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Steam Dryer Loads from In-Plant Measurements ML110460160
02/04/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  CDI Acoustic Circuit Model ML110460159
05/09/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Containment Accident Pressure ML11137A175
05/31/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Stress Evaluation of Steam Dryer Modifications ML11171A060
06/13/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Steam Dryer and BORAL Monitoring Program ML11171A059
07/15/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  BORAL Monitoring ML11207A069
08/19/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Main Steam Isolation Valve ML112412A044
09/23/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Draft Safety Evaluation for EPU ML11270A073
10/27/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Modification to Reactor Recirculation System Jet Pump Inlet Mixers ML11305A109
11/01/2011 Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re:  Standpipe Valves ML11312A177

To top of page

Amendment Information

Date Description Adams
Accession No.
12/22/2011 Nine Mile Point Nuclear Station, Unit 2 – Issuance of License Amendments Regarding Extended Power Uprate (TAC NO. ME1476) ML113300040

To top of page