Date |
Description |
Adams
Accession No. |
08/28/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Alternating Stress Ratios Original Licensed Thermal Power |
ML092460550 |
08/28/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Stress Assessment – CLTP – Attachment 1 |
ML092460595 |
08/28/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Stress Assessment – CLTP – Attachment 2 |
ML092460596 |
08/28/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Stress Assessment – CLTP – Attachment 3 |
ML092460553 |
12/23/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Mechanical & Civil Engineering – Steam Dryer Evaluation |
ML100190072 |
12/23/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Limit Curve Analysis |
ML100190073 |
12/23/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: CDI Report No. 08-08NP – CLTP Power Level |
ML100190074 |
12/23/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: CDI Report No. 09-26NP - Stress Assessment, Pg 62 |
ML100190075 |
12/23/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: CDI Report No. 09-26NP – Stress Assessment, Pg 63-130 |
ML100190076 |
12/23/2009 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: SAFER/GESTR Loss-of-Coolant Accident Analysis |
ML100190077 |
02/19/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: High Pressure Turbine Rotor |
ML100550599 |
04/16/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Plant Parameters for CLTP (current licensed thermal power) |
ML101120658 |
05/07/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Strain Gage Arrays |
ML101380307 |
06/03/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Boraflex Racks |
ML101610168 |
06/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Steam Dryer and Probabilistic Risk Assessment |
ML101900447 |
06/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: CDI Report No. 10-09NP – Steam Dryer Loads |
ML101900448 |
06/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: CDI Report NO. 10-10NP – Acoustic and Low Frequency Hydrodynamic Loads at CLTP |
ML101900449 |
06/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Main Steam Line Strain Gage Data Reduction |
ML101900450 |
06/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Low Enriched UO2 Pin Lattice in Water |
ML102170185 |
07/09/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Non-Proprietary Version of Continuum Dynamics, Inc. Report 10-11. |
ML101950495 |
07/09/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Stress Assessment – Using Acoustic Circuit Model Rev 4.1, Rev. 0, Cover through Chapter 5 |
ML101950497 |
07/09/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Stress Assessment – Using Acoustic Circuit Model Rev 4.1, Rev. 0, Chapter 6 through End. |
ML101950498 |
07/28/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Steam Dryer Vertical Support Plates |
ML102170186 |
07/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Steam Dryer Hood Support |
ML102170184 |
07/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Stress Evaluation of Steam Dryer Modifications |
ML102170295 |
10/08/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Revised Peak Containment Pressure Analysis |
ML102920333 |
10/28/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Licensing Basis Peak Clad Temperature |
ML103080202 |
11/05/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Licensing Basis Peak Clad Temperature |
ML103130512 |
11/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Steam Dryer Loads from In-Plant Measurements |
ML103500528 |
11/30/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: CDI Report No.10-10NP – Acoustic and Low Frequency Hydrodynamic Loads at CLTP |
ML103500529 |
12/10/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Steam Dryer Analysis Methodology |
ML103500525 |
12/13/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Spent Fuel Pool Criticality Analysis |
ML103500364 |
12/13/2010 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Holtec Spent Fuel Storage Racks |
ML103500365 |
01/19/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Loss of Coolant Accident Analysis |
ML110250719 |
01/31/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Low Power Coherence Data |
ML110400369 |
01/31/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Steam Dryer Loads from In-Plant Measurements |
ML110460160 |
02/04/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: CDI Acoustic Circuit Model |
ML110460159 |
05/09/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Containment Accident Pressure |
ML11137A175 |
05/31/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Stress Evaluation of Steam Dryer Modifications |
ML11171A060 |
06/13/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Steam Dryer and BORAL Monitoring Program |
ML11171A059 |
07/15/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: BORAL Monitoring |
ML11207A069 |
08/19/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Main Steam Isolation Valve |
ML112412A044 |
09/23/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Draft Safety Evaluation for EPU |
ML11270A073 |
10/27/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Modification to Reactor Recirculation System Jet Pump Inlet Mixers |
ML11305A109 |
11/01/2011 |
Nine Mile Point Nuclear Station, Unit 2, Supplemental Response to NRC RAI, Re: Standpipe Valves |
ML11312A177 |