Publication of Regulatory Guide 1.233
As an outcome of the Licensing Modernization Project (LMP), the NRC published Regulatory Guide 1.233, "Guidance for a Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light Water Reactors," in the Federal Register on June 9, 2020. This regulatory guide endorsed the methodology described in NEI 18-04, Revision 1, "Risk-Informed Performance-Based Guidance for Non‑Light Water Reactor Licensing Basis Development," as an acceptable approach for informing the licensing basis and determining the appropriate scope and level of detail for parts of applications for licenses, certifications, and approvals for non-LWRs. See SECY-19-0117, "Technology-Inclusive, Risk-Informed, and Performance-Based Methodology to Inform the Licensing Basis and Content of Applications for Licenses, Certifications, and Approvals for Non-Light-Water Reactors," and associated Staff Requirements Memorandum for information on associated policy issues.
Pilot Project Reports
The following reports are related to LMP pilot activities.
Date |
Design |
September 2019 |
Fluoride-Cooled High Temperature Reactor Licensing Modernization Project Demonstration |
September 2019 |
Molten Salt Reactor Experiment (MSRE) Case Study Using Risk‐Informed, Performance‐Based Technical Guidance to Inform Future Licensing for Advanced Non‐Light Water Reactors |
August 2019 |
Westinghouse eVinci Micro Reactor
Licensing Modernization Project Demonstration |
December 2018 |
PRISM Sodium Fast Reactor
Licensing Modernization Project Demonstration |
September 2018 |
OKLO's DG-1353 Pilot |
August 2018 |
High Temperature, Gas-Cooled Pebble Bed Reactor
licensing Modernization Project Demonstration |