TOPIC |
ACTION |
DATE |
ENDORSING DOCUMENT |
RESULT |
U.S. Nuclear Regulatory Commission Regulation (NUREG) 1022, Revision 3, "Event Reporting Guidelines 10 CFR Part 50.72 and Part 50.73" |
Informal Review |
01/14/2013 |
N/A |
Waived |
Regulatory Issue Summary (RIS) 2005-01, "Revision 1: Changes to Notice of Enforcement Discretion Process and Staff Guidance" |
Informal Review |
02/22/2013 |
N/A |
Waived |
Regulatory Issue Summary (RIS) 2013-04, "Content Specifications and Shielding Evaluations for Type B Transportation Packages" to clarify the NRC's use of staff guidance in NUREG-1609, "Standard Review Plan for Transport Packages for Radioactive Material" |
Informal Review |
04/16/2013 |
N/A |
Endorsed |
Regulatory Issue Summary (RIS) 2013-XX, "Embedded Digital Devices in Safety-Related Systems, Systems Important to Safety, and Items Relied on For Safety" |
Informal Review |
04/25/2013 |
N/A |
Endorsed |
Regulatory Issue Summary (RIS) 2012-05, "NRC Position on the Relationship Between General Design Criteria and Technical Specification Operability" |
Informal Review |
05/01/2013 |
N/A |
Endorsed |
Regulatory Issue Summary (RIS) 2013-07, "NRC Staff Position on the Use of ASME Certification Mark" |
Informal Review |
05/09/2013 |
N/A |
Endorsed |
Regulatory Issue Summary (RIS) 2012-08, "Developing Inservice Testing and Inservice Inspection Programs Under 10 CFR Part 52" |
Informal Review |
06/11/2013 |
N/A |
(Elevated to formal review, CRGR Meeting No. 434 on June 8) |
Regulatory Issue Summary (RIS) 2012-08, "Developing Inservice Testing and Inservice Inspection Programs Under 10 CFR Part 52" |
Formal Review |
07/08/2013 |
CRGR # 434 ML13190A400 |
The staff briefed the CRGR on the purpose of the RIS. The CRGR endorsed the RIS. |
Regulatory Issue Summary (RIS) 2013-09, "NRC Endorsement of NEI 09-10, Revision 1a-A, 'Guidelines for Effective Prevention and Management of System Gas Accumulation'" |
Informal Review |
07/18/2013 |
N/A |
Endorsed |
Regulatory Issue Summary (RIS) 2013-XX, "Resolution of Licensing Process Expectations for PWR Fuel Assemblies Susceptible to Top Nozzle SCC." |
Informal Review |
08/16/2013 |
N/A |
Endorsed |
Proposed Draft Nuclear Regulatory Commission Report (NUREG)-1021, Rev. 10, "Operator Licensing Examination Standards for Power Reactors" |
Informal Review |
09/24/2013 |
N/A |
Endorsed |
Regulatory Issue Summary (RIS) 2013-19, "Removal of Safeguards Information Designation From Attachment 2 to Order EA-02-261, 'Order For Compensatory Measures Related To Access Authorization'" |
Informal Review |
12/02/2013 |
N/A |
Endorsed |