TOPIC |
ACTION |
DATE |
ENDORSING DOCUMENT |
RESULT |
Guidance Documents for Subsequent License Renewal (SRP NUREG 2192, GALL SLR, Volume 1, GALL SLR Vol 2) |
Informal Review |
04/10/2017 |
Internal Summary Email |
Endorsed |
Proposed Rule and Draft
Regulatory Guide for Cyber Security at Fuel-Cycle Facilities |
Formal Review |
06/27/2017, 07/12/2017 |
CRGR #442, #444
ML17200A101
(one meeting minute) |
Endorsed, adequate protection backfitting |
Draft Regulatory Guidance 5.77, "Insider Mitigation
Program" |
Formal Review |
7/11/2017 |
CRGR #443 ML17228A119 |
Endorsed, no backfitting |
Regulatory Issue Summary 2017-XX, "Clarification on the Implementation of Compensatory Measures for Protective Strategy Deficiencies or Degraded or Inoperable Security Systems, Equipment or Components" |
Informal Review |
08/01/2017 |
Internal Summary Email |
Endorsed |
Draft Management Directive 8.4, "Management of Backfitting, Issue Finality, and Information Collection," |
Formal Review |
09/05/2017 |
CRGR #445 ML17276B137 |
Endorsed, no backfitting |
Draft Regulatory Issue Summary entitled
"Disposition of Information Related to the Time Period that Safety-Related SSCs [Structures,
Systems, and Components] are Installed" |
Formal Review |
09/12/2017, 09/14/2017 |
CRGR #446, #447 ML17276B156
(one meeting minute) |
Returned to staff |
Task Interface Agreement (TIA) entitled, "Oconee Nuclear Station, Units 1, 2,
and 3 – Final Response to Task Interface Agreement 2014-05, Design Analysis for Single
Failure and the Integration of Class 1E Direct Current Control Cabling in Raceways with High
Energy Cabling" |
Formal Review |
10/24/2017, 11/7/2017, 09/26/2017 |
CRGR #448, #449, #451
ML17289A542
(one meeting minute) |
Endorsed, no backfitting |
Draft Regulatory Analysis for Enhanced Weapons, Firearms
Background Checks, and Security Event Notifications Final Rule 10 CFR Parts 20, 21, 50, 70,
73, 74, and 76 (Enhanced Weapons Rulemaking). |
Formal Review |
10/25/2017 |
CRGR #450 ML17313A041 |
Endorsed
|
Draft NRC Regulatory Issue Summary 2017-XX, "Clarification on Endorsement of Nuclear Energy Institute Guidance in Designing Digital Upgrades in Instrumentation and Control Systems" |
Informal Review |
11/22/2017 |
Internal Summary Email |
Endorsed |