Location: Two Rivers, WI (13 miles NNW of Manitowoc, WI); Region III; Type: Westinghouse Two-Loop; Licensed MWt: 1800
Location: Two Rivers, WI (13 miles NNW of Manitowoc, WI); Region III; Type: Westinghouse Two-Loop; Licensed MWt: 1677
June 13, 2002Mr. Robert J. Barrett
Vice President, Operations
Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Unit 3
295 Broadway, Suite 3
Post Office Box 308
Buchanan, NY 10511-0308SUBJECT: NOTICE OF ENFORCEMENT DISCRETION FOR ENTERGY NU...
On this page:NRC DocumentsThis page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.NRC DocumentsThe following table provides access to documents and correspondence that the NRC has issued in 2010 in connection with its re...
The following table lists, in chronological order, the public meetings that staff of the U.S. Nuclear Regulatory Commission (NRC) conducted with representatives of Nine Mile Point Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC in 2009, in connection with the ...
On this page:Applicant DocumentsThis page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.Applicant DocumentsThe following table provides access to the COL Application and other documents that FPL submitted in 2007 for Tur...
This page lists, in chronological order, the years in which the staff of the U.S. Nuclear Regulatory Commission (NRC) conducted public meetings with representatives of Florida Power and Light Company (FPL), in connection with the review of the combined license (COL) applicatio...
Renewed License Issued 10/31/06On this page:Application InformationLicense Renewal Review ScheduleEnvironmental Impact StatementsSafety Evaluation ReportPublic InvolvementProject Managers for Nine Mile Point Nuclear PlantApplication Information:This page includes links to file...
NRC NEWSU. S. NUCLEAR REGULATORY COMMISSIONOFFICE OF PUBLIC AFFAIRS, REGION I475 Allendale Road, King of Prussia, Pa. 19406 No. I-99-81FOR IMMEDIATE RELEASE September 16, 1999CONTACT:Diane Screnci (610)337-5330/ e-mail: dps@nrc.gov Neil A. Sheehan (610)337-5331/e-mail: na...
The following table provides access to documents that the NRC has issued in connection with its review of the COL application that FPL submitted for Turkey Point, Unit 7.This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more inform...
On this page:NRC DocumentsThis page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.NRC DocumentsThe following table provides access to documents and correspondence that the NRC has issued in 2011 in connection with its re...
The "Groundwater Questionnaire" describes the state of the groundwater protection program, as of the time the questionnaire was submitted (generally 2007, unless otherwise stated).The "Effluent Report" lists the quantities of radionuclides released from the...
On this page:NRC DocumentsThis page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.NRC DocumentsThe following table provides access to documents and correspondence that the NRC has issued in 2016 in connection with its re...
On this page:NRC DocumentsThis page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.NRC DocumentsThe following table provides access to documents and correspondence that the NRC has issued in 2014 in connection with its re...
On this page:Is there a leak in a spent fuel pool at Indian Point? How was it discovered? When did Entergy inform the NRC? What has the NRC done to inspect this issue?What are the levels of radioactive contamination seen from the monitoring wells?What dose could the public rec...
The "Groundwater Questionnaire" describes the state of the groundwater protection program, as of the time the questionnaire was submitted (generally 2007, unless otherwise stated).The "Effluent Report" lists the quantities of radionuclides released from the...
The following table refers to NRC-approved power uprate applications. The table shows the ADAMS accession number for (1) each plant's power uprate application, (2) any supplement to the application, and (3) the license amendment approving the application and allowing the l...
HPPOS-023 PDR-9111210130See the memorandum from J. H. Sniezek to J. G. Keppler dated September 11, 1980. Technical Specifications (TS) require that an individual qualified in radiation protection procedures be onsite when fuel is in the reactor. HPPOS-021 contains a related to...
August 19, 1998EA 98-336
EA 98-344Mr. Robert J. Barrett
Site Executive Officer
New York Power Authority
Indian Point 3 Nuclear Power Plant
Post Office Box 215
Buchanan, NY 10511SUBJECT:NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY - $55,000
(NRC Inspec...
The following table refers to NRC-approved power uprate applications. The table shows the ADAMS accession number for (1) each plant's power uprate application, (2) any supplement to the application, and (3) the license amendment approving the application and allowing the l...
The following table provides access to documents that the NRC has issued in connection with its review of the COL application that FPL submitted for Turkey Point, Unit 6.This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more inform...
On this page:Applicant DocumentsNRC DocumentsThis page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.Applicant DocumentsThe following table provides access to the COL Application and other documents that FPL submitted in...
HPPOS-014 PDR-9111210110See the memorandum from L. B. Higginbotham to J. T. Sutherland dated March 8, 1979. A licensee may establish controls at locations beyond the immediate boundaries of a High Radiation Area to take advantage of natural or existing boundaries. The health p...
EA-05-102 August 1, 2005Mr. Fred Dacimo Site Vice President Entergy Nuclear Operations, Inc. Indian Point Nuclear Generating Station 295 Broadway, Suite 1 Post Office Box 249 Buchanan, NY 10511-0249SUBJECT:FINAL SIGNIFICANCE DETERMINATION FOR A WHITE FINDING(NRC Engineering Te...
February 25, 2000EA 99-319Mr. A. Alan Blind Vice President - Nuclear Power Consolidated Edison Company of New York, Inc. Indian Point 2 Station Broadway and Bleakley Avenue Buchanan, New York 10511SUBJECT:NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY...
June 5, 2003EA-00-230Florida Power & Light Company ATTN: Mr. J. A. Stall Senior Vice President of Nuclear Operations PO Box 14000 Juno Beach, FL 33408-0420SUBJECT: NOTICE OF VIOLATION (U.S. DEPARTMENT OF LABOR ALJ CASENO. 2000-ERA-5, ARB CASE NO. 00-070)Dear Mr. Stall:This...
EA 96-051Florida Power and Light Company ATTN: Mr. T. F. Plunkett President - Nuclear Division P. O. Box 14000 Juno Beach, FL 33408-0420 SUBJECT: NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL
PENALTY - $100,000 (Department of Labor Case No. 92-ERA-010)
Dear ...