^NewYork Power 4 Authority August 24, 1988 IPN-88-039 U. S. Nuclear Regulatory Commission Mail Station P1-137 Attn: Document Control Desk Washington, D.C. 20555 Subject: Indian Point 3 Nuclear Power Plant Docket No. 50-286 Proposed Changes to Technical Specifications Regarding...
ATTACHMENT A Technical Specification Page RevisionsConsolidated Edison Company of New York, Inc. Indian Point Unit No. 2 Docket No. 50-247 April, 1985 .65o418O3oB 85o41o PDR ADOCK 05000247 P PDR_-50-247APPLICATION FOR AMENDMENT. TO LIC. REVISING TECHNICAL SPECIFICATIONSRECORD...
1ArevaEPRDCPEm ResourceFrom: Tesfaye, GetachewSent: Friday, January 08, 2010 4:52 PMTo: 'usepr@areva.com'Cc: Xu, Jim; Hawkins, Kimberly; Ng, Ching; Dixon-Herrity, Jennifer; Miernicki, Michael; Patel, Jay; Colaccino, Joseph; ArevaEPRDCPEm ResourceSubject: Draft - U.S. EPR Desig...
Exelon Generation 4300 Winfield Road Warrenville, IL 60555 RS-10-043 March 31, 2010 ATTN : Document Control Desk U . S . Nuclear Regulatory Commission Washington, DC 20555-0001 Clinton Power Station, Unit 1 Facility Operating License No. NPF-62 NRC Docket No. 50-461 Subject: ...
May 5, 2005
Mr. Christopher M. Crane
President and CNO
Exelon Nuclear
Exelon Generation Company, LLC
200 Exelon Way KSA 3-E
Kennett Square, PA 19348
SUBJECT: PEACH BOTTOM ATOMIC POWER STATION - NRC INTEGRATED
INSPECTION REPORT 05000277/2005002 AND 05000278/2005002
Dear Mr....
May 26, 2005
Southern Nuclear Operating Company, Inc.
ATTN: Mr. L. M. Stinson
Vice President
P. O. Box 1295
Birmingham, AL 35201
SUBJECT: JOSEPH M. FARLEY NUCLEAR PLANT - NRC TRIENNIAL FIRE
PROTECTION INSPECTION REPORT 05000348/2005006 AND
05000364/2005006
Dear Mr. Stins...
LINER R. INSIDE CONTAINMENT rD1E· 1. tHIS ~fEU) HILL ~KJT EXIST eJ 1t iTEGRAL FOfml P6 ~ETP.AT lDr·B SOUTH TEXAS PROJECT UNITS 1 & 2 SINGLE PIPE PENETRATION FOR HIGH ENERGY LINES Figure 3.6-3 Revision 0
U.S. EPR FINAL SAFETY ANALYSIS REPORTTier 1 Revision 2 Page 3-iiiCHAPTER 3—NON-SYSTEM BASED DESIGN DESCRIPTIONS AND ITAACLIST OF FIGURES Figure 3.5-1—Representative Containment Isolation Valve Arrangement ............ 3.5-23Next File
RS-02-061
5928-02-20091
April 1, 2002
United States Nuclear Regulatory Commission
ATTN: Document Control Desk
Washington, D.C. 20555-0001
Three Mile Island, Unit 1 (TMI Unit 1)
Facility Operating License No. DPR-50
NRC Docket No. 50-289
...
April 27, 2006
Duke Energy Corporation (DEC)
ATTN.:Mr. B. H. Hamilton
Site Vice President
Oconee Nuclear Station
7800 Rochester Highway
Seneca, SC 29672
SUBJECT: OCONEE NUCLEAR STATION - NRC COMPONENT DESIGN BASES
INSPECTION REPORT 05000269/2006006, 05000270/2006006,
0500...
May 30, 2002
Mr. L. W. Pearce
Vice President - FENOC Oversight
& Beaver Valley Plant General Manager
Post Office Box 4
FirstEnergy Nuclear Operating Company
Shippingport, Pennsylvania 15077
SUBJECT: BEAVER VALLEY POWER STATION - NRC INSPECTION REPORT
50-334/02-04, 50-4...
November 26, 2001
EA-01-230
Mr. Oliver D. Kingsley, President
Exelon Nuclear
Exelon Generation Company, LLC
Quad Cities Nuclear Power Station
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: QUAD CITIES NUCLEAR POWER STATION
NRC INTEGRATED INSPECTION REPORT 50-254/01-12;...
July 23, 2002
Mr. William O’Connor, Jr.
Vice President
Nuclear Generation
Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT: FERMI 2 NUCLEAR POWER STATION
NRC INTEGRATED INSPECTION REPORT 50-341/02-05
Dear Mr. O’Connor:
On June 30, 2002, the NRC c...
March 14, 2003
Virginia Electric and Power Company
ATTN: Mr. David A. Christian
Sr. Vice President and
Chief Nuclear Officer
Innsbrook Technical Center - 2SW
5000 Dominion Boulevard
Glen Allen, VA 23060-6711
SUBJECT: NORTH ANNA POWER STATION - NRC PROBLEM IDENTIFICATION
...
July 22, 1997 SECY-97-158
FOR: The Commissioners
FROM: L. Joseph Callan /s/
Executive Director for Operations
SUBJECT: QUARTERLY STATUS FOR THE PROBABILISTIC RISK ASSESSMENT
IMPLEMENTATION PLAN
PURPOSE:
This...
July 22, 2005
Florida Power and Light Company
ATTN: Mr. J. A. Stall, Senior Vice President
Nuclear and Chief Nuclear Officer
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT: ST. LUCIE NUCLEAR PLANT - NRC SAFETY SYSTEM DESIGN AND
PERFORMANCE CAPABILITY INSPECTION REPORT ...
Exelon. Exelon Generation Company, LLC www.exeloncorp.com Nuclear 1400 Opus Place Downers Grove, IL 60515-5701 RS-01-056 March 26, 2001 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Quad Cities Nuclear Power Station, Units 1 and 2...
TABLE 3.3.7.5-1 ACCIDENT MONITORING INSTRUMENTATIONINSTRUMENT I. Reactor Vessel Pressure 2. Reactor Vessel Water Level 3. Suppression Chamber Water Level 4. Suppression Chamber Water TemperatureREQUIRED NUMBER OF CHANNELSMINIMUM CHANNELS2 21 12 8, 6 locations1 6, i/locationAPP...
NMCCommitted to Nuclear ExcellenNuclear Management Company, LLCPoint Beach Nuclear Plant6610 Nuclear RoadTwo Rivers, WI 54241NPL 2000-0478November 1, 2000Document Control DeskU.S. NUCLEAR REGULATORY COMMISSIONMail Station P1-137Washington, DC 2055510 CFR 50.73Ladies/Gentlemen:...
Issue Date: 02/21/03 B-1 0612, Appendix BAPPENDIX B Issue Dispositioning ScreeningUse Figure 1 and the below listed questions to determine if a finding has sufficientsignificance to warrant further analysis or documentation. The decision points in theprocess outlined in Figu...
Entergy Nuclear Northeast Entergy Nuclear Operations, Inc JamesA Fitzpatrick NPP PO Box 110 En tff,,ý,Lycoming, NY 13093 Tel 315 349 6024 Fax 315 349 6480 T.A. Sullivan Vice President, Operations-JAF February 27, 2003 JAFP-03-0034 U. S. Nuclear Regulatory Commission Attn: Docu...
July 27, 2004Mr. D. L. KoehlSite Vice PresidentNuclear Management Company, LLC6610 Nuclear RoadPoint Beach Nuclear PlantTwo Rivers, WI 54241SUBJECT: REQUEST FOR ADDITIONAL INFORMATION FOR THE REVIEW OF THEPOINT BEACH NUCLEAR PLANT, UNITS 1 AND 2, LICENSE RENEWALAPPLICATION (T...
December 28, 2007 Mr. Bruce H. Hamilton Vice President, Oconee Site Duke Power Company LLC 7800 Rochester Highway Seneca, SC 29672 SUBJECT: GENERIC LETTER 2004-02, “POTENTIAL IMPACT OF DEBRIS BLOCKAGE ON EMERGENCY RECIRCULATION DURING DESIGN BASIS ACCIDENTS AT PRESSURIZE...
Benjamin C. WaidrepProgress Energy Vice PresidentBrunswick Nuclear PlantProgress Energy Carolinas, Inc.February 27, 2008SERIAL: BSEP 07-0139U. S. Nuclear Regulatory CommissionATTN: Document Control DeskWashington, DC 20555-0001Subject: Brunswick Steam Electric Plant, Unit Nos....
September 22, 2008Victoria County Station, Units 1 and 2ESBWR FSAR Standardization AssessmentNumber of Percent ofFSAR, FSARSections Sections Section Type96 48 Match DCD41 21 Standard (identical)9 5 Standard with a limited amount of site-specific informationStandard with a mode...