Peach Bottom 2
1Q/2015 Performance Indicators
The solid trend line represents the current reporting period.
Licensee's General Comments: none
Licensee Comments: none
Unplanned Scrams per 7000 Critical Hrs 2Q/13 3Q/13 4Q/13 1Q/14 2Q/14 3Q/14 4Q/14 1Q/15
Unplanned scrams 0...
Palisades
3Q/2005 Plant Inspection Findings
Initiating Events
Significance: Jun 30, 2005
Identified By: NRC
Item Type: FIN Finding
Failure to Provide Adequate Oversight of Maintenance Activities in the Switchyard
A finding of very low safety significance was self-re...
Arkansas Nuclear 1
1Q/2007 Plant Inspection Findings
Initiating Events
Significance: Dec 31, 2006
Identified By: Self-Revealing
Item Type: FIN Finding
TRIP OF MAIN FEEDWATER PUMP DUE TO INADEQUATE DESIGN CONTROL
A self-revealing finding was identified when the Unit ...
Limerick 1
3Q/2010 Plant Inspection Findings
Initiating Events
Significance: Sep 30, 2010
Identified By: NRC
Item Type: FIN Finding
Failure to Identify Incorrectly Adjusted Control Power Relay Resulting in Unit 1 Manual Scram
A self-revealing Green finding was ident...
Catawba 2
Initiating Events
Significance: Sep 23, 2000
Identified By: Licensee
Item Type: FIN Finding
Reactor Trip Caused by Moisture Intrusion into Main Feedwater Pump 2B Speed Control Circuitry
Poor workmanship and inadequate oversight of turbine building roof repa...
Arkansas Nuclear 1
2Q/2006 Plant Inspection Findings
Initiating Events
Significance: Jun 23, 2006
Identified By: Self-Revealing
Item Type: FIN Finding
REACTOR TRIP DUE TO AUTOMATIC ACTUATION OF THE REACTOR PROTECTION SYSTEM ON MAIN TURBINE TRIP
AND INVALID ACTUATION...
Oconee 1
1Q/2005 Plant Inspection Findings
Initiating Events
Significance: Sep 25, 2004
Identified By: Self Disclosing
Item Type: NCV NonCited Violation
Failure to Correct the Degraded Condition of the 525 kV Switchyard Load Center Cabinets
A self-revealing non-cite...
Oconee 2
1Q/2005 Plant Inspection Findings
Initiating Events
Significance: Dec 31, 2004
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to Maintain Design Clearances on Feedwater Piping Whip Restraints
The inspectors identified a non-cited violation of ...
Calvert Cliffs 1
1Q/2005 Plant Inspection Findings
Initiating Events
Significance: Jun 30, 2004
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to assess and manage risk associated with Unit 1 RPS power supply replacement activities during reduced invent...
Sequoyah 2
Initiating Events
Significance: Sep 28, 2002
Identified By: Licensee
Item Type: NCV NonCited Violation
Failure to demonstrate the remaining offsite A.C. circuit as operable when one offsite A.C. Circuit of the required electrical power
sources became inope...
Harris 1
1Q/2003 Performance Indicators
Licensee's General Comments: Includes changes to Q1/2002, Q2/2002, Q3/2002, Q4/2002 and Q1/2003 data.
None of these changes affect the color of the performance indicator.
Licensee Comments: none
Unplanned Sc...
Susquehanna 1
1Q/2005 Plant Inspection Findings
Initiating Events
Mitigating Systems
Significance: Sep 30, 2004
Identified By: NRC
Item Type: FIN Finding
Diesel Driven Fire Pump Lack of Engine Cooling
A finding of low safety significance was identified because PPL...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
R EGI ON IV
612 E. LAMAR BLVD., SUITE 400
ARLINGTON, TEXAS 76011-4125
May 28, 2009
Gary W. Butner, Branch Chief
Radiological Health Branch
Division of Food, Drug & Radiation Safety
California Department of Health Serv...
December 1, 2000 EA-00-232Pechiney Rolled Products, LLC ATTN: Rod Mott, CEO and President P.O. Box 68 Ravenswood, West Virginia 26164SUBJECT: NOTICE OF VIOLATION (INSPECTION REPORT NO. 47-14123-01/00-01)Dear Mr. Mott:This refers to the Nuclear Regulatory Commission (NRC)...
May 31, 2001EA 01-123Humberto Macia President and Radiation Safety Officer Macia Consulting Enterprises, Inc. 287 New Hackensack Road Poughkeepsie, NY 12603SUBJECT: NOTICE OF VIOLATION (NRC Inspection Report 150-00031/01-02 and NRC Office of Investigation Case No 1-...
U.S. Nuclear Regulatory CommissionOperations Center Event Reports For06/01/2006 - 06/02/2006 ** EVENT NUMBERS ** 42479425124261042613 !!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!! Power ReactorEvent Number: 42479 Facility: DUANE ARNOLD Region: 3&n...
U.S. Nuclear Regulatory CommissionOperations Center Event Reports For06/25/2009 - 06/26/2009 ** EVENT NUMBERS ** 45025451504516245163 !!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!! Power ReactorEvent Number: 45025 Facility: PERRY Region: 3 Sta...
U.S. Nuclear Regulatory CommissionOperations Center Event Reports For09/02/2014 - 09/03/2014 ** EVENT NUMBERS ** 502965033550399504015040250403 !!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!! Power ReactorEvent Number: 50296 Facility: NINE MILE POIN...
U.S. Nuclear Regulatory CommissionOperations Center Event Reports For04/14/2004 - 04/15/2004 ** EVENT NUMBERS ** 406004066340668406694067340674 !!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!! Power ReactorEvent Number: 40600 Facility: LIMERICK Regio...
U.S. Nuclear Regulatory Commission
Operations Center
Event Reports For
11/18/1999 - 11/19/1999
** EVENT NUMBERS **
36446 36447 36448 3...
U.S. Nuclear Regulatory Commission
Operations Center
Event Reports For
03/31/1999 - 04/01/1999
** EVENT NUMBERS **
35534 35535 35536 3...
U.S. Nuclear Regulatory CommissionOperations Center Event Reports For02/26/2008 - 02/27/2008 ** EVENT NUMBERS ** 4399944000440014400344009HospitalEvent Number: 43999 Rep Org: VIRGINIA COMMONWEALTH UNIVERSITY Licensee: VCU MEDICAL CENTER Region: 1 City: RICHMOND State: ...
U.S. Nuclear Regulatory Commission
Operations CenterEvent Reports For
4/5/2019 - 4/8/2019** EVENT NUMBERS **
5396353964539655398253983Agreement StateEvent Number: 53963Rep Org: NC DIV OF RADIATION PROTECTION
Licensee: NOVANT HEALTH PRESBYTERIAN MEDICAL C...
U.S. Nuclear Regulatory Commission
Operations Center
Event Reports For
06/29/2001 - 07/02/2001
** EVENT NUMBERS **
38104 38105 38106 3...