Committed to Nuclear E IC 7) JG1E1 DPoint Beach Nuclear PlantU1R28OCC Interactive TurnoverMeeting AgendaThursday, May 20, 2004Start Time: 1800 NSB Cafeteria BRIEFING NOTESATTENDEESShift Outage DirectorsShift Outage Managers (SOM)Operations Coordinators (SOC)Maintenance Coordin...
Britt T. McKinney Vice President Operations-WLF CREEK 'NUCLEAR OPERATING CORPORATION OCT-v1 2002 "WO 02-0055U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555Subject: Docket No. 50-482: -Changes to Wolf Creek Gefierating Station (WCGS) Radi...
Tennessee Valley Authority, 1101 Market Street, Chattanooga, Tennessee 37402-2801 November 17, 200010 CFR 50, Appendix E Section VU.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D.C. 20555-0001 Gentlemen:In the Matter of Tennessee Valley Authority) )...
Official Transcript of Proceedings NUCLEAR REGULATORY COMMISSION Title: Mock Adversary Force Options/Alternatives Public Meeting Docket Number: N/A Location: Rockville, Maryland Date: August 22, 2018 Work Order No.: NRC-3853 Pages 1-27 NEAL...
20NMMSS Technical Progress ReportNovember 2004Under Contract Number DE-AC03-98SF21544, Tasks 1, 2, & 3This report summarizes the NMMSS program’s technical progress for the month ofNovember 2004. The report was submitted to DOE SO-20.3 and a copy was provided tothe NRC as its M...
Susquehanna 2
4Q/2016 Plant Inspection Findings
Initiating Events
Significance: Jul 22, 2016
Identified By: NRC
Item Type: FIN Finding
Failure to Implement or Develop Timely Interim or Final Corrective Actions for a Degraded Condition
(4OA2.1.c(3))
The inspectors document...
POLICY ISSUE
INFORMATION
September 24, 2002 SECY-02-0171
FOR: The Commissioners
THROUGH: G. Paul Bollwerk, III
Chief Administrative Judge
FROM: Daniel J. Graser
Licensing Support Network Administrator
SUBJECT: LICENSING SUPPORT NETWORK PROGRAM ADMINISTRATION -
SEMIANNUAL...
Fort Calhoun
3Q/2007 Plant Inspection Findings
Initiating Events
Significance: Sep 30, 2007
Identified By: NRC
Item Type: FIN Finding
Ineffective Corrective Actions for Hydrazine Spills
A Green self-revealing finding was identified for inadequate corrective actions,...
Davis-Besse
1Q/2004 Plant Inspection Findings
Initiating Events
Significance: Jan 07, 2004
Identified By: NRC
Item Type: NCV NonCited Violation
Process Monitoring Function for Alternative Shutdown Capability
The team identified a Non-Cited Violation of 10 CFR Part 5...
Committed to Nuclear Excellcnce 1,JOJJRFlPoint Beach Nuclear PlantUI1R28OCC Interactive TurnoverMeeting AgendaSaturday, May 22, 2004Start Time: 1800 NSB Cafeteria BRIEFING NOTESATTENDEESShift Outage DirectorsShift Outage Managers (SOM)Operations Coordinators (SOC)Maintenance C...
Davis-Besse
3Q/2004 Plant Inspection Findings
Initiating Events
Significance: Sep 30, 2004
Identified By: NRC
Item Type: NCV NonCited Violation
REACTOR OPERATOR ATTEMPTED TO ADD WATER TO THE MAKE UP TANK UTILIZING EQUIPMENT THAT WAS
OUT OF SERVICE
A finding of very...
May 14, 2002
Mr. Fred Dacimo
Vice President - Operations
Entergy Nuclear Operations, Inc.
Indian Point Nuclear Generating Units 1 & 2
295 Broadway, Suite 1
Post Office Box 249
Buchanan, NY 10511-0249
SUBJECT: INDIAN POINT 2 - NRC INSPECTION REPORT 50-247/02-02
Dear Mr. Dac...
January 18, 2002
Tennessee Valley Authority
ATTN: Mr. J. A. Scalice
Chief Nuclear Officer and
Executive Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT: BROWNS FERRY NUCLEAR PLANT - NRC INTEGRATED INSPECTION
REPORT NOS. 50-259/01-0...
January 19, 2005
Mr. Mark E. Warner
Site Vice President
c/o Mr. James M. Peschel
FPL Energy Seabrook, LLC
Seabrook Station
P.O. Box 300
Seabrook, NH 03874
SUBJECT: SEABROOK STATION - NRC PROBLEM IDENTIFICATION AND RESOLUTION
INSPECTION REPORT NO. 05000443/2004008
Dear Mr. ...
Susquehanna 1
2Q/2016 Plant Inspection Findings
Initiating Events
Significance: Mar 31, 2016
Identified By: NRC
Item Type: NCV Non-Cited Violation
Failure to Correct Fatigue Related Cracking of the ‘B’ RRP Lower Seal Cavity Vent Line
A self-revealing finding of very low sa...
U.S. NUCLEAR REGULATORY COMMISSION January 2010
REGULATORY GUIDE
OFFICE OF NUCLEAR REGULATORY RESEARCH
REGULATORY GUIDE 5.71
(New Regulatory Guide...
March 14, 2003
Duke Energy Corporation
ATTN: Mr. G. R. Peterson
Site Vice President
Catawba Site
4800 Concord Road
York, SC 29745-9635
SUBJECT: CATAWBA NUCLEAR STATION - NRC INSPECTION REPORT
50-413/02-08 AND 50-414/02-08
Dear Mr. Peterson:
On January 31, 2003, the NRC ...
STATEMENT SUBMITTED
BY THE
UNITED STATES NUCLEAR REGULATORY COMMISSION
TO THE
SUBCOMMITTEE ON NATIONAL SECURITY, EMERGING THREATS,
AND INTERNATIONAL RELATIONS
COMMITTEE ON GOVERNMENT REFORM
UNITED STATES HOUSE OF REPRESENTATIVES
CONCERNING
HOMELAND SECURITY: MONITORIN...
Susquehanna 2
3Q/2016 Plant Inspection Findings
Initiating Events
Significance: Jul 22, 2016
Identified By: NRC
Item Type: FIN Finding
Failure to Implement or Develop Timely Interim or Final Corrective Actions for a Degraded Condition
(4OA2.1.c(3))
The inspectors document...
October 16, 2003
Mr. Joseph Solymossy
Site Vice-President
Prairie Island Nuclear Generating Plant
Nuclear Management Company, LLC
1717 Wakonade Drive East
Welch, MN 55089
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
NRC PROBLEM IDENTIFICATION AND RESOLUT...
December 22, 2005
Mr. M. Nazar
Senior Vice President and
Chief Nuclear Officer
Indiana Michigan Power Company
Nuclear Generation Group
One Cook Place
Bridgman, MI 49106
SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNIT 2
NRC SPECIAL INSPECTION REPORT 05000316/2005013
Dear Mr....
Kewaunee
Initiating Events
Mitigating Systems
Significance: Jun 30, 2001
Identified By: NRC
Item Type: NCV NonCited Violation
FAILURE TO IDENTIFY DEFICIENT CONDITION OF VALVE AFW-1B
The inspectors identified that the licensee failed to promptly identify and correct...
July 25, 2001
South Carolina Electric & Gas Company
ATTN: Mr. Stephen A. Byrne
Senior Vice President
Nuclear Operations
Virgil C. Summer Nuclear Station
P. O. Box 88
Jenkinsville, SC 29065
SUBJECT: VIRGIL C. SUMMER NUCLEAR STATION - NRC INTEGRATED INSPECTION
REPORT NO...
Kewaunee
Initiating Events
Mitigating Systems
Significance: Jun 22, 2000
Identified By: NRC
Item Type: FIN Finding
FAILURE TO MEET SINGLE FAILURE CRITERIA FOR RESIDUAL HEAT REMOVAL VALVE CIRCUITRY.