The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Materials and Plant Protection (Division 5): Regulatory Guides 5.81 – 5.100

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Public Comment.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
Title Revision No. Issue
Date
Additional Information
5.81 Target Set Identification and Development for Nuclear Power Reactors (OUO-SRI) DG 07/2024
OUO-SRI
DG-5071
1 12/2019
OUO-SRI
 
0 11/2010
OUO-SRI
 
5.83 Cyber Security Event Notifications 1 07/2023  
0 07/2015  
5.84 Fitness-For-Duty Programs at New Reactor Construction Sites 0 07/2015  
5.85 Security Performance (Adversary) Characteristics for Physical Security Programs for 10 CFR Part 72 Licensees (OUO-SGI) DG   Discontinued
5.86 Preemption Authority, Enhanced Weapons Authority, and Firearms Background Checks 1 04/2024  
0 03/2023  
5.87 Suspicious Activity Reports Under 10 CFR Part 73 1 05/2024  
0 03/2023  
5.88 Physical Inventories and Material Balances at Fuel Cycle Facilities 0 09/2017  
5.89 Fitness-for-Duty Programs for Commercial Power Reactor and Category I Special Nuclear Material Licensees 0 11/2022  
5.90 Guidance for Alternative Physical Security Requirements for Small Modular Reactors and Non-Light-Water Reactors DG 07/2024 DG-5072
5.91 Cyber Security Programs for Nuclear Fuel Cycle Facilities DG    
5.92 Guidance On Controlling Changes to The Security Plan for Nuclear Power Reactors DG    
5.93 Technology-Inclusive Determination of Source Terms DG    
5.94 Fitness-For-Duty Programs for Commercial Nuclear Plants and Manufacturing Facilities Licensed Under 10 CFR Part 53 DG 10/2024 DG-5073
5.95 Access Authorization Program for Commercial Nuclear Plants DG 10/2024 DG-5074 
5.96 Establishing Cybersecurity Programs for Commercial Nuclear Plants Licensed Under 10 CFR Part 53 DG 10/2024 DG-5075
5.97
 
Guidance for Technology Inclusive Requirements for Physical Protection of Licensed Activities at Commercial Nuclear Plants DG 10/2024 DG-5076
5.98
 
SAT-based Training Program Review Guidance DG    
5.99
 
Fatigue Management for Nuclear Power Plant Personnel at Commercial Nuclear Plants Licensed Under 10 CFR Part 53 DG 10/2024  DG-5078
5.100 Security Plan Changes that Utilize Modeling and Simulation Tools DG    

To top of page

Page Last Reviewed/Updated Tuesday, November 5, 2024