Materials and Plant Protection (Division 5): Regulatory Guides 5.41 - 5.60

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Public Comment.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
Title Revision No. Issue
Date
Additional Information
5.41 Shipping, Receiving, and Internal Transfer of Special Nuclear Material At Fuel Cycle Facilities 0 05/2017  
5.42 Design Considerations for Minimizing Residual Holdup of Special Nuclear Material in Equipment for Dry Process Operations 0 01/1975 Reviewed in 2016 – Issues identified for future consideration
5.43 Plant Security Force Duties
(Withdrawn -- See 85 FR 23870)
W 04/2020  
0 01/1975  
5.44 Perimeter Intrusion Alarm Systems DG   Periodic Review – June 2020 – Revise
 
Periodic Review – September 2015 – Considerations
 
Periodic Review – June 2010 – No Action
3 10/1997  
2 05/1980  
1 06/1976  
0 01/1975  
5.45 Standard Form and Content for the Special Nuclear Material Control and Accounting Section of a Special Nuclear Material License Application (including That for a Uranium Enrichment Facility)
(Withdrawn -- See 63 FR 2426, 01/15/1998)
W 01/1998  
0 12/1974  
5.47 Control and Accountability of Plutonium in Waste Material
(Withdrawn -- See 50 FR 25364, 06/18/1985)
W 06/1985  
0 02/1975  
5.48 Design Considerations--Systems for Measuring the Mass of Liquids 0 02/1975 Reviewed in 2016 – Issues identified for future consideration
5.49 Internal Transfers of Special Nuclear Material
(Withdrawn -- See 82 FR 25016)
W 05/2017  
0 03/1975  
5.51 Management Review of Nuclear Material Control and Accounting Systems 1 10/2016  
0 06/1975  
5.52 Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material at Fixed Sites (Other than Nuclear Power Plants) 3 12/1994 Reviewed in 2020 – No issues identified
2 07/1980  
1 06/1976  
0 05/1975  
5.53 Qualification, Calibration, and Error Estimation Methods for Nondestructive Assay 1 02/1984 Reviewed in 2016 – Issues identified for future consideration
0 08/1975  
5.54 Standard Format and Content of Safeguards Contingency Plans for Nuclear Power Plants (SGI) 1 06/2009
SGI
Periodic Review – April 2024
- No Action

 
Reviewed in 2014 – N/A
SGI
5.55 Standard Format and Content of Safeguards Contingency Plans for Fuel Cycle Facilities 0 03/1978 Reviewed in 2020 – No issues identified
5.56 Standard Format and Content of Safeguards Contingency Plans for Transportation
(Withdrawn -- See 85 FR 21476)
W 04/2020  
0 03/1978  
5.57 Shipping and Receiving Control of Strategic Special Nuclear Material
(Withdrawn -- See 82 FR 25016)
W 05/2017  
1 06/1980  
0 06/1976  
5.58 Considerations for Establishing Traceability of Special Nuclear Material Accounting Measurements 1 02/1980 Reviewed in 2016 – Issues identified for future consideration
0 11/1978  
5.59 Standard Format and Content for a Licensee Physical Security Plan for the Protection of Special Nuclear Material of Moderate or Low Strategic Significance 1 02/1983 Reviewed in 2020 – Issues identified for future consideration
0 01/1980  
5.60 Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material in Transit 0 04/1980 Reviewed in 2020 – Issues identified for future consideration

To top of page

Page Last Reviewed/Updated Monday, June 3, 2024