Guide
Number |
Title |
Revision No. |
Issue
Date |
Additional Information |
5.41 |
Shipping, Receiving, and Internal Transfer of Special Nuclear Material At Fuel Cycle Facilities
|
0 |
05/2017 |
|
5.42 |
Design Considerations for Minimizing Residual Holdup of Special Nuclear Material in Equipment for Dry Process Operations
|
0 |
01/1975 |
Reviewed in 2016 – Issues identified for future consideration |
5.43 |
Plant Security Force Duties
(Withdrawn -- See 85 FR 23870)
|
W |
04/2020 |
|
0 |
01/1975 |
|
5.44 |
Perimeter Intrusion Alarm Systems
|
DG |
|
Periodic Review – June 2020 – Revise
Periodic Review – September 2015 – Considerations
Periodic Review – June 2010 – No Action |
3 |
10/1997 |
|
2 |
05/1980 |
|
1 |
06/1976 |
|
0 |
01/1975 |
|
5.45 |
Standard Form and Content for the Special Nuclear Material Control and Accounting Section of a Special Nuclear Material License Application (including That for a Uranium Enrichment Facility)
(Withdrawn -- See 63 FR 2426, 01/15/1998) |
W |
01/1998 |
|
0 |
12/1974 |
|
5.47 |
Control and Accountability of Plutonium in Waste Material
(Withdrawn -- See 50 FR 25364, 06/18/1985) |
W |
06/1985 |
|
0 |
02/1975 |
|
5.48 |
Design Considerations--Systems for Measuring the Mass of Liquids
|
0 |
02/1975 |
Reviewed in 2016 – Issues identified for future consideration |
5.49 |
Internal Transfers of Special Nuclear Material
(Withdrawn -- See 82 FR 25016) |
W |
05/2017 |
|
0 |
03/1975 |
|
5.51 |
Management Review of Nuclear Material Control and Accounting Systems
- HISTORY
- 09/2015 – DG-5049, Proposed Revision 1
- Prior to the issuance of DG-5049, RG 5.51 was entitled, "Management Review of Nuclear Material Control and Accounting Systems"
|
1 |
10/2016 |
|
0 |
06/1975 |
|
5.52 |
Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material at Fixed Sites (Other than Nuclear Power Plants)
|
3 |
12/1994 |
Reviewed in 2020 – No issues identified |
2 |
07/1980 |
|
1 |
06/1976 |
|
0 |
05/1975 |
|
5.53 |
Qualification, Calibration, and Error Estimation Methods for Nondestructive Assay
|
1 |
02/1984 |
Reviewed in 2016 – Issues identified for future consideration |
0 |
08/1975 |
|
5.54 |
Standard Format and Content of Safeguards Contingency Plans for Nuclear Power Plants (SGI)
|
1 |
06/2009
SGI |
Periodic Review – April 2024
- No Action
Reviewed in 2014 – N/A
SGI |
5.55 |
Standard Format and Content of Safeguards Contingency Plans for Fuel Cycle Facilities
|
0 |
03/1978 |
Reviewed in 2020 – No issues identified |
5.56 |
Standard Format and Content of Safeguards Contingency Plans for Transportation
(Withdrawn -- See 85 FR 21476)
|
W |
04/2020 |
|
0 |
03/1978 |
|
5.57 |
Shipping and Receiving Control of Strategic Special Nuclear Material
(Withdrawn -- See 82 FR 25016)
- HISTORY
- 05/1979 – Draft SG 908-4, Proposed Revision 1
|
W |
05/2017 |
|
1 |
06/1980 |
|
0 |
06/1976 |
|
5.58 |
Considerations for Establishing Traceability of Special Nuclear Material Accounting Measurements
|
1 |
02/1980 |
Reviewed in 2016 – Issues identified for future consideration |
0 |
11/1978 |
|
5.59 |
Standard Format and Content for a Licensee Physical Security Plan for the Protection of Special Nuclear Material of Moderate or Low Strategic Significance
|
1 |
02/1983 |
Reviewed in 2020 – Issues identified for future consideration |
0 |
01/1980 |
|
5.60 |
Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material in Transit
|
0 |
04/1980 |
Reviewed in 2020 – Issues identified for future consideration |