Skip to main content

Materials and Plant Protection (Division 5): Regulatory Guides 5.41 - 5.60

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Public Comment.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
TitleRevision No.Issue
Date
Additional Information
5.41

Shipping, Receiving, and Internal Transfer of Special Nuclear Material At Fuel Cycle Facilities

HISTORY
  • 09/2016 – DG-5051, Proposed Revision 0
005/2017 
5.42

Design Considerations for Minimizing Residual Holdup of Special Nuclear Material in Equipment for Dry Process Operations

HISTORY
001/1975Reviewed in 2016 – Issues identified for future consideration
5.43

Plant Security Force Duties
(Withdrawn -- See 85 FR 23870)

HISTORY
  • 10/2016 – Periodic Review of Revision 0 – Issues identified for future consideration
  • 09/2011 – Periodic Review of Revision 0 – No issues identified
W04/2020 
001/1975 
5.44

Perimeter Intrusion Alarm Systems

HISTORY
DG Periodic Review – June 2020 – Revise
 
Periodic Review – September 2015 – Considerations
 
Periodic Review – June 2010 – No Action
310/1997 
205/1980 
106/1976 
001/1975 
5.45Standard Form and Content for the Special Nuclear Material Control and Accounting Section of a Special Nuclear Material License Application (including That for a Uranium Enrichment Facility)
(Withdrawn -- See 63 FR 2426, 01/15/1998)
W01/1998 
012/1974 
5.47Control and Accountability of Plutonium in Waste Material
(Withdrawn -- See 50 FR 25364, 06/18/1985)
W06/1985 
002/1975 
5.48

Design Considerations--Systems for Measuring the Mass of Liquids

HISTORY
002/1975Reviewed in 2016 – Issues identified for future consideration
5.49Internal Transfers of Special Nuclear Material
(Withdrawn -- See 82 FR 25016)
W05/2017 
003/1975 
5.51

Management Review of Nuclear Material Control and Accounting Systems

HISTORY
  • 09/2015 – DG-5049, Proposed Revision 1
  • Prior to the issuance of DG-5049, RG 5.51 was entitled, "Management Review of Nuclear Material Control and Accounting Systems"
110/2016 
006/1975 
5.52

Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material at Fixed Sites (Other than Nuclear Power Plants)

HISTORY
312/1994Reviewed in 2020 – No issues identified
207/1980 
106/1976 
005/1975 
5.53

Qualification, Calibration, and Error Estimation Methods for Nondestructive Assay

HISTORY
102/1984Reviewed in 2016 – Issues identified for future consideration
008/1975 
5.54

Standard Format and Content of Safeguards Contingency Plans for Nuclear Power Plants (SGI)

HISTORY
  • 05/2018 – DG-5048, Proposed Revision 2
DG06/2026
SGI
DG-5087 (SGI) 
106/2009
SGI
Periodic Review – April 2024
- No Action
 
Reviewed in 2014 – N/A
SGI
5.55

Standard Format and Content of Safeguards Contingency Plans for Fuel Cycle Facilities

HISTORY
003/1978Reviewed in 2020 – No issues identified
5.56

Standard Format and Content of Safeguards Contingency Plans for Transportation
(Withdrawn -- See 85 FR 21476)

HISTORY
  • 10/2016 – Periodic Review of Revision 1 – Issues identified for future consideration
  • 09/2011 – Periodic Review of Revision 0 – No issues identified
W04/2020 
003/1978 
5.57

Shipping and Receiving Control of Strategic Special Nuclear Material
(Withdrawn -- See 82 FR 25016)

HISTORY
  • 05/1979 – Draft SG 908-4, Proposed Revision 1
W05/2017 
106/1980 
006/1976 
5.58

Considerations for Establishing Traceability of Special Nuclear Material Accounting Measurements

HISTORY
102/1980Reviewed in 2016 – Issues identified for future consideration
011/1978 
5.59

Standard Format and Content for a Licensee Physical Security Plan for the Protection of Special Nuclear Material of Moderate or Low Strategic Significance

HISTORY
  • 08/2020 – Periodic Review of Revision 1 – Issues identified for future consideration
  • 10/2016 – Periodic Review of Revision 1 – Issues identified for future consideration
  • 09/2011 – Periodic Review of Revision 1 – No issues identified
  • 09/1982 – Draft SG 229-4, Proposed Revision 1
  • 07/1979 – Draft MP 711-4, Proposed Revision 0
102/1983 
001/1980 
5.60

Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material in Transit

HISTORY
004/1980Reviewed in 2020 – Issues identified for future consideration

To top of page

Page Last Reviewed/Updated Tuesday, August 11, 2026

Page Last Reviewed/Updated Tuesday, August 11, 2026