Materials and Plant Protection (Division 5): Regulatory Guides 5.41 - 5.60
This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).
See also Draft Regulatory Guides for Division 5.
See NRC Regulatory Guides for more general information.
Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Guide
Number |
Title |
Revision No. |
Issue
Date |
Additional Information |
5.41 |
Shipping, Receiving, and Internal Transfer of Special Nuclear Material At Fuel Cycle Facilities
|
0 |
05/2017 |
|
5.42 |
Design Considerations for Minimizing Residual Holdup of Special Nuclear Material in Equipment for Dry Process Operations
|
0 |
01/1975 |
Reviewed in 2016 – Issues identified for future consideration |
5.43 |
Plant Security Force Duties
(Withdrawn -- See 85 FR 23870)
|
W |
04/2020 |
|
0 |
01/1975 |
|
5.44 |
Perimeter Intrusion Alarm Systems
|
DG |
|
Periodic Review – June 2020 – Revise
Periodic Review – September 2015 – Considerations
Periodic Review – June 2010 – No Action |
3 |
10/1997 |
|
2 |
05/1980 |
|
1 |
06/1976 |
|
0 |
01/1975 |
|
5.45 |
Standard Form and Content for the Special Nuclear Material Control and Accounting Section of a Special Nuclear Material License Application (including That for a Uranium Enrichment Facility)
(Withdrawn -- See 63 FR 2426, 01/15/1998) |
W |
01/1998 |
|
0 |
12/1974 |
|
5.47 |
Control and Accountability of Plutonium in Waste Material
(Withdrawn -- See 50 FR 25364, 06/18/1985) |
W |
06/1985 |
|
0 |
02/1975 |
|
5.48 |
Design Considerations--Systems for Measuring the Mass of Liquids
|
0 |
02/1975 |
Reviewed in 2016 – Issues identified for future consideration |
5.49 |
Internal Transfers of Special Nuclear Material
(Withdrawn -- See 82 FR 25016) |
W |
05/2017 |
|
0 |
03/1975 |
|
5.51 |
Management Review of Nuclear Material Control and Accounting Systems
- HISTORY
- 09/2015 – DG-5049, Proposed Revision 1
- Prior to the issuance of DG-5049, RG 5.51 was entitled, "Management Review of Nuclear Material Control and Accounting Systems"
|
1 |
10/2016 |
|
0 |
06/1975 |
|
5.52 |
Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material at Fixed Sites (Other than Nuclear Power Plants)
|
3 |
12/1994 |
Reviewed in 2020 – No issues identified |
2 |
07/1980 |
|
1 |
06/1976 |
|
0 |
05/1975 |
|
5.53 |
Qualification, Calibration, and Error Estimation Methods for Nondestructive Assay
|
1 |
02/1984 |
Reviewed in 2016 – Issues identified for future consideration |
0 |
08/1975 |
|
5.54 |
Standard Format and Content of Safeguards Contingency Plans for Nuclear Power Plants (SGI)
|
1 |
06/2009
SGI |
Reviewed in 2014 – N/A
SGI |
5.55 |
Standard Format and Content of Safeguards Contingency Plans for Fuel Cycle Facilities
|
0 |
03/1978 |
Reviewed in 2020 – No issues identified |
5.56 |
Standard Format and Content of Safeguards Contingency Plans for Transportation
(Withdrawn -- See 85 FR 21476)
|
W |
04/2020 |
|
0 |
03/1978 |
|
5.57 |
Shipping and Receiving Control of Strategic Special Nuclear Material
(Withdrawn -- See 82 FR 25016)
- HISTORY
- 05/1979 – Draft SG 908-4, Proposed Revision 1
|
W |
05/2017 |
|
1 |
06/1980 |
|
0 |
06/1976 |
|
5.58 |
Considerations for Establishing Traceability of Special Nuclear Material Accounting Measurements
|
1 |
02/1980 |
Reviewed in 2016 – Issues identified for future consideration |
0 |
11/1978 |
|
5.59 |
Standard Format and Content for a Licensee Physical Security Plan for the Protection of Special Nuclear Material of Moderate or Low Strategic Significance
|
1 |
02/1983 |
Reviewed in 2020 – Issues identified for future consideration |
0 |
01/1980 |
|
5.60 |
Standard Format and Content of a Licensee Physical Protection Plan for Strategic Special Nuclear Material in Transit
|
0 |
04/1980 |
Reviewed in 2020 – Issues identified for future consideration |

Page Last Reviewed/Updated Monday, May 22, 2023