Skip to main content

Materials and Plant Protection (Division 5): Regulatory Guides 5.81 – 5.100

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Public Comment.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
TitleRevision No.Issue
Date
Additional Information
5.81

Target Set Identification and Development for Nuclear Power Reactors (OUO-SRI)

203/2026
OUO-SRI
 
112/2019
OUO-SRI
 
011/2010
OUO-SRI
 
5.83

Cyber Security Event Notifications

107/2023 
007/2015 
5.84

Fitness-For-Duty Programs at New Reactor Construction Sites

007/2015 
5.85

Security Performance (Adversary) Characteristics for Physical Security Programs for 10 CFR Part 72 Licensees (OUO-SGI)

DG Discontinued
5.86

Preemption Authority, Enhanced Weapons Authority, and Firearms Background Checks

104/2024 
003/2023 
5.87

Suspicious Activity Reports Under 10 CFR Part 73

105/2024 
003/2023 
5.88

Physical Inventories and Material Balances at Fuel Cycle Facilities

009/2017 
5.89

Fitness-for-Duty Programs for Commercial Power Reactor and Category I Special Nuclear Material Licensees

011/2022 
5.90

Guidance for Alternative Physical Security Requirements for Small Modular Reactors and Non-Light-Water Reactors

DG07/2024DG-5072
5.91

Cyber Security Programs for Nuclear Fuel Cycle Facilities

DG  
5.92

Guidance On Controlling Changes to The Security Plan for Nuclear Power Reactors

DG  
5.93

Technology-Inclusive Determination of Source Terms

Cancelled Work performed under RG 1.242
5.94

Fitness-For-Duty Programs for Commercial Nuclear Plants and Manufacturing Facilities Licensed Under 10 CFR Part 53

DG10/2024DG-5073
5.95

Access Authorization Program for Commercial Nuclear Plants

003/2026 
5.96

Establishing Cybersecurity Programs for Commercial Nuclear Plants Licensed Under 10 CFR Part 53

003/2026 
5.97
 

Guidance for Technology Inclusive Requirements for Physical Protection of Licensed Activities at Commercial Nuclear Plants

003/2026 
5.98
 

SAT-based Training Program Review Guidance

DG  
5.99
 

Fatigue Management for Nuclear Power Plant Personnel at Commercial Nuclear Plants Licensed Under 10 CFR Part 53

003/2026 
5.100

Security Plan Changes that Utilize Modeling and Simulation Tools

DG  

To top of page

Page Last Reviewed/Updated Friday, May 01, 2026

Page Last Reviewed/Updated Friday, May 01, 2026