Skip to main content

Materials and Plant Protection (Division 5): Regulatory Guides 5.61 – 5.80

This page lists the number, title, publication date, and revisions for each regulatory guide in Division 5, "Materials and Plant Protection," with references to draft guides and related documents (where applicable).

See also Draft Regulatory Guides for Public Comment.

See NRC Regulatory Guides for more general information.

Regulatory Guides are reviewed about every 10 years, although a guide may be reviewed more frequently if the staff believes an emerging issue affects the guide. The NRC began these reviews in 2010, and began posting the results of its reviews on this site in 2013. The review dates are hyperlinked to the review memorandum, which provide useful information about the status and any known issues with the associated regulatory guide.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Guide
Number
TitleRevision No.Issue
Date
Additional Information
5.61

Intent and Scope of the Physical Protection Upgrade Rule Requirements for Fixed Sites
(WithdrawnSee 85 FR 56281)

W09/2020 
006/1980 
5.62

Physical Security Event Notifications, Reports, and Records

DG06/2026Issued DG-5089
309/2024 
203/2023 
111/1987 
002/1981 
5.63

Physical Protection for Transient Shipments

007/1982Reviewed in 2020 – Issues identified for future consideration
5.65

Vital Area Access Controls, Protection of Physical Security Equipment, and Key and Lock Controls
(WithdrawnSee 82 FR 52337 11/13/2017)

W11/2017 
009/1986 
5.66

Access Authorization Program for Nuclear Power Plants

DG06/2026Issued DG-5090
210/2011Periodic Review July 2017 – No Action
104/2009
OUO-SRI
 
5.67

Material Control and Accounting for Uranium Enrichment Facilities Authorized To Produce Special Nuclear Material of Low Strategic Significance
(Withdrawn -- See 83 FR 47648, 9/20/2018)

W10/2012 
012/1993 
5.68

Protection Against Malevolent Use of Vehicles at Nuclear Power Plants
(Withdrawn -- See 77 FR 60482, 10/3/2012)

W09/2018 
008/1994Reviewed in 2013 – No issues identified
5.69

Guidance for the Application of Radiological Sabotage Design-Basis Threat in the Design, Development and Implementation of a Physical Security Program that Meets 10 CFR 73.55 Requirements (SGI)

103/2022
SGI
 
009/2007
SGI
Reviewed in 2014 – issues identified
5.70

Guidance for the Application of the Theft and Diversion Design-Basis Treat in the Design Development, and Implementation of a Physical Security Program that Meets CFR 73.45 and 73.46 (Classified)

102/2017
Classified
 
009/2007
Classified
 

5.71

 

 

Cyber Security Programs for Nuclear Power Reactors

DG06/2026Issue DG-5085
102/2023 
001/2010Reviewed in 2015 – Revise
5.73

Fatigue Management for Nuclear Power Plant Personnel

DG06/2026Issued DG-5099
003/200910/2019 – Reviewed with issues identified for future consideration
5.74

Managing the Safety/Security Interface

104/2015Reviewed in 2025 – Reviewed with no issues identified
006/2009 
5.75

Training and Qualification of Security Personnel at Nuclear Power Reactor Facilities

DG06/2026Issued DG-5093
103/2021 
007/2009 
5.76

Physical Protection Programs at Nuclear Power Reactors (SGI)

DG06/2026
SGI
DG-5094 (SGI)
111/2020
SGI
 
007/2009
SGI
 
5.77

Insider Mitigation Program

DG06/2026Issued DG-5095
109/2022 
003/2009
OUO-SRI
 
5.78

Physical Protection of Mixed Oxide Fuels in Nuclear Power Plants (SGI)

007/2010
SGI
Reviewed in 2025 – No issues identified
5.79

Protection of Safeguards Information

DG06/2026Issued DG-5102
004/2011Reviewed in 2020 – No Issues
5.80

Pressure-Sensitive And Tamper-Indicating Device Seals For Material Control And Accounting Of Special Nuclear Material

012/2010Reviewed in 2015 – No issues identified

Page Last Reviewed/Updated Thursday, July 09, 2026

Page Last Reviewed/Updated Thursday, July 09, 2026