Documents added in 2025 |
V = Volume | N = Number | R = Revision | P = Part | S = Supplement | Ch = Chapter | Add = Addendum | Sec = Section | DFC = Draft For Comment |
PUBLICATION
NUMBER |
TITLE |
DATE OF
PUBLICATION |
ADAMS
ACCESSION
NUMBER |
NUREG-1437, S15, Second Renewal |
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Virgil C. Summer Nuclear Station - Final Report |
May 2025 |
ML25128A160 |
NUREG-0980, V1, N12 |
Nuclear Regulatory Legislation: 117th Congress; 2nd Session |
April 2025 |
ML25120A424 |
NUREG-1437, S61 |
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal of Perry Nuclear Power Plant, Final Report |
April 2025 |
ML25113A032 |
NUREG/CR-7311 |
Determination of Bias and Bias Uncertainty for Criticality Safety Computational Methods |
April 2025 |
ML25120A337 |
NUREG-0711, R2 |
Human Factors Engineering Program Review Model |
February 2004 |
ML040770540 |
NUREG-0711, R1 |
Human Factors Engineering Program Review Model |
May 2002 |
ML021560629 |
NUREG-0711, R0 |
Human Factors Engineering Program Review Model |
June 1996 |
ML20072D914 |
NUREG-0700, R1, V3 |
Human-System Interface Design Review Guideline: Review Software and User's Guide |
June 1996 |
ML20134N403 |
NUREG-0700, R1, V2 |
Human-System Interface Design Review Guideline: Reviewer’s Checklist |
June 1996 |
ML20134N356 |
NUREG-0700, R1, V1 |
Human-System Interface Design Review Guideline: Process and Guidelines |
June 1996 |
ML20134N366 |
NUREG-0700, R0 |
Guidelines for Control Room Design Reviews |
September 1981 |
ML20010H660 |
NUREG-0750, V100 |
Nuclear Regulatory Commission Issuances, July 1, 2024 - December 31, 2024 |
April 2025 |
ML25111A263 |
NUREG-1437, S23, Second Renewal, DFC |
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Point Beach Nuclear Plant, Units 1 and 2 - Draft Report for Comment |
April 2025 |
ML25069A710 |
NUREG-1437 S63, DFC |
Generic Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding License Renewal for Clinton Power Station, Unit 1 – Draft Report for Comment |
April 2025 |
ML25072A105 |
NUREG/CR-7308 |
Sensitivity/Uncertainty Methods for Nuclear Criticality Safety Validation |
April 2025 |
ML25099A002 |
NUREG-1379, R4 |
NRC Editorial Style Guide |
April 2025 |
ML25098A236 |
NUREG/CR-7309 |
Validation Studies for High Burnup and Extended Enrichment Fuels in Burnup Credit Criticality Safety Analyses |
April 2025 |
ML25093A004 |
NUREG/BR-0254, R14 |
Payment Methods |
March 2025 |
ML25072A290 |
NUREG-1482, DFC, R4 |
Guidelines for Inservice Testing at Nuclear Power Plants: Inservice Testing of Pumps and Valves and Inservice Examination and Testing of Dynamic Restraints (Snubbers) at Nuclear Power Plants - Draft Report for Comment |
February 2025 |
ML24277A142 |
NUREG-1350, V35 |
Information Digest, 2024–2025 |
February 2025 |
ML25051A094 |
NUREG-0750,
83 – 92, Indexes |
Nuclear Regulatory Commission Issuances, NRCI Indexes, January 2016 through December 2020 |
February 2025 |
ML25052A232 |
NUREG/BR-0533 |
Atomic Fission: The Breakup of the Atomic Energy Commission and the Energy Reorganization Act of 1974 |
February 2025 |
ML25044A364 |
NUREG/IA-0555 |
Kuosheng BWR Decommissioning SBO Analysis with RELAP5/MOD 3.3 |
February 2025 |
ML25043A358 |
NUREG/IA-0554 |
TRACE simulations of LOCAs Together with the Complete Loss of One Emergency Core Cooling Function in Two-Loop PWR |
February 2025 |
ML25042A074 |
NUREG-1830, V21 |
Office of Investigations Annual Report Fiscal Year 2024 |
February 2025 |
ML25041A010 |
NUREG/BR-0531, R1 |
NRC Safeguards Information Program: Helpful Resources for Applicants and Preapplicants |
February 2025 |
ML25038A063 |
NUREG-1307, R20 |
Report on Waste Burial Charges: Changes in Decommissioning Waste Disposal Costs at Low-Level Waste Burial Facilities — Final Report |
February 2025 |
ML25037A226 |
NUREG-1437, S2, Second Renewal |
Site-Specific Environmental Impact Statement for License Renewal of Nuclear Plants: Regarding Subsequent License Renewal for Oconee Nuclear Station Units 1, 2, and 3 - Final Report |
January 2025 |
ML25031A307 |
NUREG-1028 |
Ruptured Cesium-137 Well-Logging Source at Shelwell Services, Inc., Hebron, Ohio |
April 1984 |
ML20090J115 |
NUREG/IA-0553 |
Study on the Effect of Dissolved Air During Hydroaccumulator Injection |
January 2025 |
ML25015A134 |
NUREG/BR-0532 |
NRC Facility Security Clearance Program: Helpful Resources For Licensees, Applicants, And Other Entities |
January 2025 |
ML25010A266 |