Skip to main content

Part 21 Reports: 2026

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Log No.NotifierDescriptionReport DateEvent No. / Accession No.
2026-06-00Emerson – Fisher Controls International LLC Interim Written Notification per 10 CFR 21.21(a)(2) Potential Deviation - ASTM A276 Type 316 B Cold Finished Material 04/21/2026ML26112A070
2026-05-01D.C. Cook Nuclear Plant Part 21 30-day Notification of ABB Inc. Refurbishment Kit used for K-Line series 600V Breakers 03/03/2026 ML26062A250
2026-05-00D.C. Cook Nuclear PlantInitial Report Notification Pursuant to 10 CFR Part 21.21 - Incorrect Tension Spring within Refurbishment Kit Used for K-Line Series 600V Breakers Supplied by ABB, Inc02/04/2026ML26048A185
2026-04-00Engine Systems Inc10 CFR Part 21 Report No. 10CFR21-0140, Rev. 0 – EMD Cylinder Head P/N 4012148501/30/2026ML26033A212
2026-03-01Paragon Energy Solutions, LLC10 CFR Part 21 Final Notification: P21-01282026-FN, Rev. 0, Defect with Schneider Electric Actuator Part Number MA-418-0-0-402/25/2026ML26056A135
2026-03-00Paragon Energy Solutions, LLC 10 CFR Part 21 Initial Notification: P21-01282026, Rev. 0, Defect with Schneider Electric Actuator Part Number MA-418-0-0-4 01/28/2026ML26029A103
2026-02-00James A. FitzPatrick Nuclear Power Plant (JAF)Interim 10 CFR Part 21 Report of a Deviation or Failure to Comply Associated with General Electric HMA Type Auxiliary Relay, Model 12HMA124A2, Part Number DA137C6164P001 01/22/2026ML26022A344
2026-01-01Sequoyah Nuclear Plant10 CFR 21.21 Report Regarding Limitorque Actuator/Motor Assemblies SMB-2 and SB-102/18/2026ML26049A224
2026-01-00Sequoyah Nuclear Plant10 CFR Part 21 Notification for FlowServe Limitorque Actuator/Motor Assemblies Model Numbers SMB-2 and SB-101/21/2026ML26048A182

Page Last Reviewed/Updated Wednesday, April 29, 2026

Page Last Reviewed/Updated Wednesday, April 29, 2026