Part 21 Reports: 2020
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Log No. | Notifier | Description | Report Date | Event No. / Accession No. |
---|---|---|---|---|
2020-33-00 | Cameron Energy Services | Nuclear Product Advisory: Barton 752, 752A, 752B, 764 Transmitter Hydrostatic Test | 11/09/2020 | ML20315A535 |
2020-32-01 | Curtiss-Wright Nuclear Division | 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 (Update) | 12/15/2020 | ML20366A045 |
2020-32-00 | Curtiss-Wright Nuclear Division | 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch 17BLVS293 | 11/18/2020 | ML20366A047 |
2020-31-00 | Engine Systems, Inc. | 10 CFR Part 21 Reportable Notification on a Camshaft Key, Part Number KSV-16-6E#1 | 12/10/2020 | ML20350B551 |
2020-30-00 | QualTech NP | 10 CFR Part 21 Notification for a Curtiss-Wright supplied Royce Compressor | 11/16/2020 | ML20321A238 |
2020-29-00 | Nutherm International, Inc. | Part 21 Notification – Continuously Energized Eaton D26 Relays | 09/25/2020 | ML20274A084 |
2020-28-00 | Nine Mile Point Unit 2 | Failure to Meet Technical Specification MSIV Stroke Times (a 50.73 LER Supplement and Part 21 Report) | 08/31/2020 | ML20255A078 |
2020-27-01 | Waterford 3 | Defect of Masoneilan 8012N-3C Electropneumatic Positioner | 09/01/2020 | ML20245E499 |
2020-27-00 | Waterford 3 | Defect of Masoneilan 8012N-3C Electropneumatic Positioner | 08/10/2020 | EN 54827 |
2020-26-01 | Southern Nuclear – Vogtle | 30-Day 10 CFR Part 21 Notification – Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material | 07/22/2020 | ML20204A970 |
2020-26-00 | Southern Nuclear – Vogtle | Initial 10 CFR Part 21 Notification – Continuously Energized Eaton D26 Relays Could Fail to Deenergize Because of an Organic C3 Insulating Material | 06/24/2020 | ML20176A321 |
2020-25-00 | Curtiss-Wright Nuclear Division | 10 CFR Part 21 Notification for SF-1154 Hydraulic Fluid Batch Number 16DLVS852 | 04/21/2020 | ML20206K891 |
2020-24-00 | Piezotech LLC | Parts Manufactured Using Source Material Without a Specific License | 07/09/2020 | EN 54767 |
2020-23-01 | Paragon Energy Solutions | Failures of Size 1 and 2 Freedom Series Auxiliary Contacts | 07/21/2020 | ML20255A200 |
2020-23-00 | Paragon Energy Solutions | Failures of Size 1 and 2 Freedom Series Auxiliary Contacts | 06/30/2020 | EN 54760 |
2020-22-00 | United Controls International | 10CFR21 Notification for ABB/Thomas & Betts/Cyberex P/N: 93-41-119385 Time Delay Oscillator Printed Circuit Boards | 06/29/2020 | EN 54758 |
2020-21-06 | Lake Engineering Co. | Final Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | 08/04/2021 | ML21225A081 |
2020-21-05 | Lake Engineering Co. | Sixth Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | 05/07/2021 | ML21146A246 |
2020-21-04 | Lake Engineering Co. | Fifth Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | 02/17/2021 | ML21063A153 |
2020-21-03 | Lake Engineering Co. | Fourth Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | 12/07/2020 | ML21014A234 |
2020-21-02 | Lake Engineering Co. | Third Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | 10/06/2020 | ML20296A276 |
2020-21-01 | Lake Engineering Co. | Second Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | 08/07/2020 | ML20241A081 |
2020-21-00 | Lake Engineering Co. | Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 17BLVS293 | 06/08/2020 | ML20178A308 |
2020-20-00 | GE-Hitachi Nuclear Energy Americas, LLC | Non-Conservative BWR/6 Side Entry Orifice (SEO) Loss Coefficients | 06/24/2020 | ML20176A432 |
2020-19-00 | Point Beach Nuclear Plant | Interim Report for Reactor Protection System Channel Failure Results in Operation Prohibited by Technical Specification | 06/11/2020 | ML20163A561 |
2020-18-00 | Dresser LLC | 10 CFR Part 21 Report for Dresser LLC (Masoneilan) Valves with Screwed Baffle Design | 06/03/2020 | ML20164A085 |
2020-17-00 | Paragon Energy Solutions | Part 21 Initial Report- Failures of Size 1 and 2 Freedom Series Auxiliary Contacts | 06/03/2020 | EN 54734 |
2020-16-01 | Diablo Canyon | Inadequate Commercial Grade Dedication of Replacement Marsh Bellofram Engine Thermocouples (Written Notification) | 06/16/2020 | ML20168A888 |
2020-16-00 | Diablo Canyon | Inadequate Commercial Grade Dedication of Replacement Marsh Bellofram Engine Thermocouples | 05/20/2020 | EN 54721 |
2020-15-00 | Curtiss-Wright Nuclear Division | 10 CFR Part 21 Report Notification for certain Curtiss-Wright Scientech RTL500 and RTL851 Modules | 04/21/2020 | ML20136A255 |
2020-14-00 | Schulz Electric | Degraded Vertical Motor Bearing Oil Reservoir Recoating | 04/14/2020 | EN 54664 |
2020-13-00 | Engine Systems, Inc. | Test Stand Deficiency May Damage P/N H40084720 EMD Fuel Injectors | 03/19/2020 | EN 54588 |
2020-12-00 | Holtec International | 10 CFR 21 Reportable Issue with Stainless Steel Tubes Supplied by Sandvik Materials Technology | 03/16/2020 | ML20078J459 |
2020-11-01 | Flowserve US, Inc. | Bench Test Failure of Model 38878-x, 3-Way, 2-Position Solenoid Valves at Seabrook Station for use on FWIV Actuator | 06/11/2020 | ML20255A199 |
2020-11-00 | Flowserve U S, Inc. | Interim Report of Bench Test Failure of Model 38878-x, 3-Way, 2-Position Solenoid Valves at Seabrook Station for use on FWIV Actuator | 03/12/2020 | ML20076C858 |
2020-10-01 | AMETEK Solidstate Controls | Revised Notification of Potential Defect regarding AMETEK Power Supply, series 85-RPXXX | 12/09/2020 | ML20344A280 |
2020-10-00 | Ametek Solidstate Controls | Notification of Potential Defect Regarding AMETEK Power Supply, Series 85-RPXXX | 02/11/2020 | ML20049A076 |
2020-09-00 | C&D Technologies, Inc. | 10 CFR Part 21 Evaluation Regarding Container Failure in KCR-07 Batteries | 02/11/2020 | ML20049A075 |
2020-08-03 | Cameron | Nuclear Product Advisory 210316064.4, "BARTON 763/763A/764 Transmitter Heat Rise and Qualified Life." (Note: This Nuclear Product Advisory is not a Part 21 report. However the Product Advisory does contain additional information related to the condition described in Part 21 Report 2020-0008-00). | 11/23/2021 | ML21328A005 |
2020-08-02 | Cameron | Nuclear Product Advisory 210316064.3, "BARTON 763/763A/764 Transmitter Heat Rise and Qualified Life." (Note: This Nuclear Product Advisory is not a Part 21 report. However the Product Advisory does contain additional information related to the condition described in Part 21 Report 2020-0008-00). | 06/17/2021 | ML21172A304 |
2020-08-01 | Cameron | Nuclear Product Advisory 210316064.2, "BARTON 763/763A/764 Transmitter Heat Rise and Qualified Life." (Note: This Nuclear Product Advisory is not a Part 21 report. However the Product Advisory does contain additional information related to the condition described in Part 21 Report 2020-0008-00). | 01/09/2020 | ML20044F577 |
2020-08-00 | Cameron | Notification Regarding Barton Model 763 or 763A or 764 Electronic Transmitter Qualified Life Update | 01/30/2020 | ML20038A272 |
2020-07-00 | Fairbanks Morse | 10 CFR 21.21(d)(3)(ii) Notification, Unknown Tightness of Opposed Piston Diesel Engine Cam Thrust Lock Nut Assembly | 01/31/2020 | ML20049A074 |
2020-06-01 | Fluke Health Solutions | Final Part 21 Report re: Nickel Seal Ring Heat Treatment Dedication. | 04/02/2021 | ML21098A155 |
2020-06-00 | Fluke Health Solutions | 10 CFR Part 21 Interim Report re: Nickel Seal Rings | 01/20/2020 | ML20024E245 |
2020-05-00 | United Controls International | 10 CFR Part 21 Notification for Ashcroft Industrial and Weksler Regal Gauges | 01/13/2020 | ML20028D380 |
2020-04-01 | Curtiss-Wright Flow Control | 10 CFR Part 21 Report - Notification of a Defect - Modification of a Valve Component and Main Disc Lift Misadjustment (Update) | 01/31/2020 | ML20042E252 |
2020-04-00 | Curtiss-Wright Flow Control | 10 CFR Part 21 Report, Notification of a Defect Modification of a Valve Component and Main Disc Lift Misadjustment | 01/21/2020 | ML20029D161 |
2020-03-04 | Lake Engineering Co. | Final Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 | 10/14/2020 | ML20304A161 |
2020-03-03 | Lake Engineering Co. | Fourth Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 | 08/03/2020 | ML20234A353 |
2020-03-02 | Lake Engineering Co. | Third Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 | 06/04/2020 | ML20171A401 |
2020-03-01 | Lake Engineering Co. | Second Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 | 03/20/2020 | ML20097B691 |
2020-03-00 | Lake Engineering Co. | Interim Notification per 10 CFR Part 21, Degraded Snubber SF1154 Hydraulic Fluid Batch No. 16DLVS852 | 01/03/2020 | ML20021A045 |
2020-02-01 | Carrier Corporation | Final Report / Notification of Defect Pursuant to 10 CFR Part 21 for 17FA999-1200-107 Oil Pump | 03/09/2020 | ML20073G457 |
2020-02-00 | Carrier Corporation | Interim Report of Defect Pursuant to 10 CFR Part 21 – Failure of Improperly Assembled Oil Pump | 01/10/2020 | ML20016A220 |
2020-01-00 | Engine Systems, Inc. | Inadequate Thread Modification on Selenium Surge Suppressors (EMD P/N 8403049) | 01/08/2020 | ML20024E255 |
Page Last Reviewed/Updated Tuesday, November 30, 2021
Page Last Reviewed/Updated Tuesday, November 30, 2021