The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Part 21 Reports - 2014

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Log No Notifier Description Report Date Event No. / Accession No.
2014-91-01 Baldor Electric Co. Written and Final Report - Baldor AC Motors with Potential Bearing End Cap Alignment Issues (Revised) 01/23/2015 ML15034A566
2014-91-00 Baldor Electric Co. Baldor AC Motors with Potential Bearing End Cap Alignment Issues 12/23/2014 ML14365A059
2014-90-02 ABB Inc. Second Update to Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating 11/17/2016 ML16328A313
2014-90-01 ABB Amendment to Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating 03/05/2015 ML15070A543
2014-90-00 ABB Part 21 Notification of Potential Defect Regarding KF Relay ZPA Rating 12/17/2014 ML14357A334
2014-89-01 ASCO Valve, Inc. Final Report - Potential Part 21 Notification (Steris Isomedix) 08/19/2015 ML15243A173
2014-89-00 ASCO Valve, Inc. Interim Report - Potential Part 21 Notification (Steris Isomedix) 12/16/2014 ML14357A335
2014-88-01 WECTEC LLC (formerly CB&I Power) Closure of Interim Report Regarding Deviations of Procurement Documents and Materials for AP1000 Projects 01/15/2016 ML16034A222
2014-88-00 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Procurement Documents and Materials for AP1000 Projects 12/04/2014 ML14349A376
2014-87-01 CB&I Nuclear Closure of Interim Report Regarding Rebar Deviations For Vogtle Units 3 & 4 AP1000 Project 01/08/2015 ML15022A201
2014-87-00 CB&I Nuclear Interim Report Regarding Rebar Deviations For Vogtle Units 3 & 4 AP1000 Project 11/13/2014 ML14337A115
2014-86-03 CB&I Nuclear

Closure of Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000)

06/09/2015 ML15173A096
2014-86-02 CB&I Nuclear

Updated Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000)

03/20/2015 ML15180A134
2014-86-01 CB&I Nuclear Updated Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000) 01/21/2015 ML14337A114
2014-86-00 CB&I Nuclear Interim Report Regarding Threaded Rebar Terminator Deviations for V.C. Summer Units 2 & 3 (AP1000) 11/20/2014 ML14337A114
2014-85-01 CB&I Nuclear Closure of Interim Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2 (AP1000) 06/09/2015 ML15173A096
2014-85-00 CB&I Nuclear Interim Report Regarding Submodules CA20-03 and CA20-07A Nonconformances for V. C. Summer Unit 2 (AP1000) 11/13/2014 ML14335A295
2014-84-01 AREVA Inc. Defect in LOCA Analysis for B&W Plants (Written Report) 12/16/2014 ML14351A308
2014-84-00 AREVA Inc. Defect in LOCA Analysis for B&W Plants 11/25/2014 ML14337A095
2014-83-01 National Technical Systems Potential Part 21 Issue on Irradiations performed by Steris Isomedix Services (Updated Interim Report) 05/21/2015 ML15152A125
2014-83-00 National Technical Systems Potential Part 21 Issue on Irradiations performed by Steris Isomedix Services (Interim Report) 11/12/2014 ML14325A687
2014-82-00 Emerson Process Management Improper Dedication of Fisher Controls Type 67 AFR Regulator Diaphragm Assembly Parts 11/19/2014 ML14337A093
2014-81-02 Technology for Energy Corporation Final Notification of Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems 12/18/2014 EN 50623
2014-81-01 Technology for Energy Corporation Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems (Corrected Report) 11/24/2014 ML14337A094
2014-81-00 Technology for Energy Corporation Possible Defect in TEC Model 1414-6 and 1414-8 Valve Flow Monitoring Systems 11/18/2014 ML14329A063
2014-80-00 Flowserve Miller Air Cylinder Seal Dedication Issue 11/13/2014 ML14321A011
2014-79-02 CB&I Nuclear Closure of Interim Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project 02/23/2015 ML15055A525
2014-79-01 CB&I Nuclear Updated Interim 10 CFR Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project 12/09/2014 ML15029A057
2014-79-00 CB&I Nuclear Interim 10 CFR Part 21 Report Regarding CA03 Structural Module Fabrication for Vogtle Unit 3 AP1000 Project 10/23/2014 ML14310A577
2014-78-01 TVA - Browns Ferry Units 1, 2, 3 Closure of Interim Report - Engine Systems, Inc. - Emergency Diesel Generator Heat Exchanger CEY564L-HEX 10/31/2014 ML14309A529
2014-78-00 TVA - Browns Ferry Units 1, 2, 3 Interim Report - Engine Systems, Inc. - Emergency Diesel Generator Heat Exchanger CEY564L-HEX 09/05/2014 ML14318A196
2014-77-01 CB&I Nuclear Closure of Interim 10 CFR Part 21 Report Regarding Rebar and Embedment Deviations for V. C. Summer Unit 2 AP1000 10/16/2014 ML14297A152
2014-77-00 CB&I Nuclear Interim 10 CFR Part 21 Report Regarding Rebar and Embedment Deviations for V. C. Summer Unit 2 AP1000 Project 08/14/2014 ML14234A021
2014-76-02 CB&I Nuclear Part 21 Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects 01/13/2015 ML15027A425
2014-76-01 CB&I Nuclear Updated Interim Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects 12/11/2014 ML15014A214
2014-76-00 CB&I Nuclear

Interim Report Regarding Deviations of Coatings for Pipe Supports for AP1000 Projects

10/15/2014 ML14296A427
2014-75-00 Ametek Solidstate Controls Insufficient Spot Weld on Wire Wound Resistor 10/17/2014 ML14294A684
2014-74-01 Waterford 3 Written Notification of Defective Allen Bradley Type 700RTC Relay 11/12/2014 ML14316A441
2014-74-00 Waterford 3 Defective Allen Bradley Type 700RTC Relay 10/26/2014 ML14294A685
2014-73-01 AREVA Inc. Notification of an Error in POWERPLEX MCPR and LHGR Limit Input for Browns Ferry Unit 2 10/27/2014 ML14303A258
2014-73-00 AREVA Inc. Defect in the Input to Calculate Thermal Limits 10/03/2014 ML14281A061
2014-72-00 Electroswitch Orientation of Series 20 Internal Wire may Allow the Side Cover Screw to Touch the Wire Insulation 10/03/2014 ML14281A062
2014-71-01 CB&I Nuclear Closure of Interim Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 (AP1000 Project) 01/08/2015 ML15022A201
2014-71-00 CB&I Nuclear Interim Part 21 Report Regarding Submodule and Embedment Deviations for V. C. Summer Unit 2 (AP1000 Project) 08/27/2014 ML14255A017
2014-70-01 Oyster Creek Electromatic Relief Valve Excessive Wear 10/08/2014 ML14302A071
2014-70-00 Oyster Creek Electromatic Relief Valve Excessive Wear 09/25/2014 EN 50495
2014-69-00 Carboline Company Carboline SG Base Not Curing Properly 09/23/2014 EN 50486
2014-68-01 QualTech NP Close Out of Discrepancy Between Generation 3 Quick Disconnect Connector Qualification Reports and Installation Instructions 12/30/2014 ML15014A107
2014-68-00 QualTech NP Discrepancy Between Generation 3 Quick Disconnect Connector Qualification Reports and Installation Instructions 09/22/2014 ML14268A234
2014-67-00 Nuclear Innovation North America, LLC Response to General Electric-Hitachi Final Part 21 Report from STP Units 3 & 4 (See Part 21 No. 2014-18-00/-01/-02) 09/15/2014 ML14261A148
2014-66-02 CB&I Nuclear Closure of Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) 10/16/2014 ML14297A152
2014-66-01 CB&I Nuclear Updated Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) 09/16/2014 ML14274A040
2014-66-00 CB&I Nuclear Interim Part 21 Report Regarding Embedment and REBAR Deviations for Vogtle, Units 3 & 4 (AP1000 Project) 09/04/2014 ML14259A350
2014-65-01 The Okonite Company Final Notice Concerning Irradiations of Class 1E Cables Performed by Steris Isomedix 07/30/2015 ML15232A523
2014-65-00 The Okonite Company Notice Concerning Irradiations of Class 1E Cables Performed by Steris Isomedix 08/27/2014 ML14254A428
2014-64-01 Summer Units 2 & 3 Root Cause Analysis for Deviations Associated with the Submodule Welding Program (a 10CFR50.55(e) report) 09/29/2014 ML14272A353
2014-64-00 Summer Units 2 & 3 Welding Program Deviations During Construction (a 10CFR50.55(e) report) 09/10/2014 EN 50442
2014-63-00 Vogtle Units 3 & 4 Welding Program Deviations During Construction (a 10CFR50.55(e) report) 09/10/2014 EN 50441
2014-62-00 Cameron Measurement Systems Defective Barton Differential Pressure Switches 09/09/2014 ML14259A390
2014-61-00 Underwater Construction Corporation Failure to Meet Specified Irradiation During Testing of Coated Test Panels 09/08/2014 ML14259A389
2014-60-01 Schulz Electric Potential Part 21 Issue on Motor Dedications Performed Prior to June 2002 (Final Evaluation) 09/30/2014 ML14275A161
2014-60-00 Schulz Electric Potential Part 21 Issue on Motor Dedications Performed Prior to June 2002 09/05/2014 EN 50428
2014-59-01 CB&I Nuclear Closure of Interim Report Regarding Threaded Ends Of Rebar For Overlay Plates For Vogtle Units 3 & 4 (AP1000 Project) 09/04/2014 ML14259A351
2014-59-00 CB&I Nuclear Interim Report Regarding Threaded Ends Of Rebar For Overlay Plates For Vogtle Units 3 & 4 (AP1000 Project) 07/30/2014 ML14237A119
2014-58-01 ABB Inc. Amended Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch 09/12/2014 ML14265A049
2014-58-00 ABB Inc. Notice of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch 08/15/2014 ML14237A121
2014-57-01 CB&I Nuclear Closure of Interim Report Regarding Submodule CA20-29 Deviations for V.C.Summer Unit 2 AP1000 Project 10/16/2014 ML14297A152
2014-57-00 CB&I Nuclear Interim Report Regarding Submodule CA20-29 Deviations for V.C.Summer Unit 2 AP1000 Project 08/01/2014 ML14220A025
2014-56-02 Nutherm International, Inc. Final Update on Part 21 Issue Regarding Incorrect Industrial Irradiation Dose 02/03/2016 ML16039A269
2014-56-01 Nutherm International Updated Potential Part 21 Issue Regarding Incorrect Industrial Irradiation Dose 08/31/2015 ML15251A213
2014-56-00 Nutherm International Potential Part 21 Issue Regarding Incorrect Industrial Irradiation Dose 08/01/2014 ML14226A995
2014-55-00 Crane Nuclear, Inc. Safety - Related Valves Assembled with Non-Safety Related Levers 08/01/2014 ML14218A510
2014-54-00 United Controls International Interim Report - Temperature Switch Set Points out of Calibration 07/31/2014 ML14217A347
2014-53-01 SOR, Inc. Potentially Defective Pressure and Temperature Switches 04/02/2015 ML15099A043
2014-53-00 SOR, Inc. Potentially Defective Pressure and Temperature Switches 07/23/2014 ML14213A099
2014-52-00 Fisher Controls International Non-Conforming Solenoid Valves Sent to Progress Energy - Brunswick 07/21/2014 ML14210A009
2014-51-03 ITT Engineered Valves, LLC Second Interim Report - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) 04/07/2015 ML15103A485
2014-51-02 ITT Engineered Valves, LLC Interim Report - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) 09/17/2014 ML14261A150
2014-51-01 ITT Engineered Valves, LLC Written Notification - Improper Irradiation of Samples for Ball Valve Seats and Diaphragms (Steris Isomedix Services) 08/14/2014 ML14226A641
2014-51-00 ITT Engineered Valves, LLC Improper Irradiation of Samples for Ball Valve Seats and Diaphagms (Steris Isomedix Services) 07/18/2014 ML14210A053
2014-50-01 Velan Inc. Revised Notification of Defects on 2 -inch Bonnets (Corrected Part Number) 07/28/2014 ML14213A010
2014-50-00 Velan Inc. Notification of Defects on 2-inch Bonnets 07/18/2014 ML14210A008
2014-49-00 Westinghouse Electric Co. Potential Failure of Reactor Coolant Pump Turning Vane Bolts 07/14/2014 ML14197A281
2014-48-00 Nuclear Logistics, Inc. Assembly Errors During Breaker Refurbishment 07/11/2014 ML14197A380
2014-47-01 CB&I Nuclear Closure of Interim Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (inadequate control of measuring and test equipment) 09/04/2014 ML14259A351
2014-47-00 CB&I Nuclear Interim Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (inadequate control of measuring and test equipment) 07/03/2014 ML14192A041
2014-46-02 CB&I Nuclear Closure of Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) 10/16/2014 ML14297A152
2014-46-01 CB&I Nuclear Updated Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) 08/19/2014 ML14253A142
2014-46-00 CB&I Nuclear Interim Report Regarding Deviations of Modules and Submodules Supplied for AP1000 Projects (blasting abrasive contamination) 07/03/2014 ML14192A039
2014-45-01 Preferred Metal Technologies, Inc. Final Report - Incorrect Industrial Irradiator Dose (Steris Isomedix Services) 07/30/2014 ML14216A377
2014-45-00 Preferred Metal Technologies, Inc. Incorrect Industrial Irradiator Dose (Steris Isomedix Services) 07/03/2014 ML14192A040
2014-44-00 Kinectrics Inc. Potential Part 21 Issue on Irradiations Performed by Steris Isomedix Services (Steris) 06/27/2014 ML14184B303
2014-43-01 CB&I Nuclear Closure of Interim Report Regarding Submodule CA01-37 Nonconformances for V.C. Summer Unit 2 AP1000 Project 09/04/2014 ML14259A351
2014-43-00 CB&I Nuclear Interim Report Regarding Submodule CA01-37 Nonconformances for V.C. Summer Unit 2 AP1000 Project 06/10/2014 ML14178A113
2014-42-01 Waterford 3 Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open Configuration 07/09/2014 ML14190B371
2014-42-00 Waterford 3 Masoneilan Actuators Discovered to Fail-Closed Instead of the Required Fail-Open Configuration 06/12/2014 ML14171A356
2014-41-01 CB&I Nuclear Closure of Interim Report Regarding Threaded Ends of Rebar for Overlay Plates for Vogtle Units 3 and 4 AP1000 Project 07/30/2014 ML14237A119
2014-41-00 CB&I Nuclear Interim Report Regarding Threaded Ends of Rebar for Overlay Plates for Vogtle Units 3 and 4 AP1000 Project 05/23/2014 ML14160A721
2014-40-02 CB&I Nuclear Closure of Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module 10/16/2014 ML14297A152
2014-40-01 CB&I Nuclear Updated Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module Fabrication 07/21/2014 ML14212A412
2014-40-00 CB&I Nuclear Interim Report Regarding CB&I Lake Charles Welding Material Nonconformance for the AP1000 Module Fabrication 05/22/2014 ML14160A718
2014-39-00 AREVA Inc. Defect Identified in Single Loop Operation Minimum Critical Power Ratio 06/04/2014 ML14160A781
2014-38-01 Watts Bar Final Report - Watts Bar Unit 2 Potentially Defective Fuses Installed (a 10 CFR 50.55(e) Report) 06/19/2014 ML14174A042
2014-38-00 Watts Bar Watts Bar Unit 2 Potentially Defective Fuses Installed (a 10 CFR 50.55(e) Report) 06/03/2014 ML14160A783
2014-37-01 Flowserve Notification of Defect Identified in Flowserve / Vernon Pumps Supplied to Watts Bar 2 06/02/2014 ML14364A168
2014-37-00 Flowserve Notification of Defect Identified in Flowserve / Vernon Pumps Supplied to Watts Bar 2 04/02/2014 ML14154A086
2014-36-02 Shaw AREVA MOX Services Closure of Interim Report - Nelson Deformed Bars 11/13/2014 ML14317A461
2014-36-01 Shaw AREVA MOX Services Updated Interim Report - Nelson Deformed Bars 08/26/2014 ML14238A581
2014-36-00 Shaw AREVA MOX Services Interim Report - Nelson Deformed Bars 05/28/2014 ML14148A271
2014-35-01 Pentair Valves and Controls Closure of Interim Report - Potential Deficiencies in Ensuring that Customer Valve Wall Thickness Requirements were Met 08/27/2014 ML14241A238
2014-35-00 Pentair Valves and Controls Interim Report - Potential Deficiencies in Ensuring that Customer Valve Wall Thickness Requirements were Met 05/23/2014 ML14147A370
2014-34-01 Browns Ferry Nuclear Plant Closure of Interim Report - Degraded Limitorque SMB-0 Valve Actuator Motor Operator Bearing 07/07/2014 ML14189A417
2014-34-00 Browns Ferry Nuclear Plant Interim Report - Degraded Limitorque SMB-0 Valve Actuator Motor Operator Bearing 05/09/2014 ML14135A035
2014-33-00 Pentair Interim Report - Evaluation Regarding Potential Deficiencies in ASME Code Required Valve and Component Testing 05/08/2014 ML14129A436
2014-32-00 Scientech NUS-710DU Trip Units Could Fail to Produce a Valid Trip Signal in Certain Operating Configurations 05/08/2014 ML14134A079
2014-31-00 Flowserve Size 4 Pressure Class 600 Normally Open In-Line Check Valves Missing Jam Nuts 05/02/2014 ML14125A270
2014-30-01 CB&I Nuclear Closure of Interim 10 CFR Part 21 Report Regarding Submodule CA20-14 Nonconformance for Vogtle Unit 3 AP1000 05/20/2014 ML14160A719
2014-30-00 CB&I Nuclear Interim 10 CFR Part 21 Report Regarding Submodule CA20-14 Nonconformance for Vogtle Unit 3 AP1000 Project 04/23/2014 ML14121A058
2014-29-01 North Anna 1 & 2 Retraction of Interim Report - Basler Motor Operated Control (Potentiometer) Not Functioning Properly 06/16/2014 ML14174A936
2014-29-00 North Anna 1 & 2 Basler Motor Operated Control (Potentiometer) Not Functioning Properly 04/21/2014 ML14113A588
2014-28-06 CB&I Nuclear Closure of Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects (See related 50.55(e) reports at 2014-63-00 and 2014-64-00) 06/09/2015 ML15173A096
2014-28-05 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects 11/05/2014 ML14325A688
2014-28-04 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects 05/02/2014 ML14129A471
2014-28-03 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Modules and Sub-Modules Supplied for AP1000 Projects 04/30/2014 ML14136A039
2014-28-02 CB&I Nuclear Interim Part 21 Report Regarding Sub-Module Coupler Welding Qualification. Nonconformance for AP1000. 04/28/2014 ML14127A098
2014-28-01 CB&I Nuclear Updated Interim Report Regarding CB&I Lake Charles Welding Procedure Specification Nonconformance for AP1000 04/22/2014 ML14121A057
2014-28-00 CB&I Nuclear Interim Report Regarding CB&I Lake Charles Welding Procedure Specification Nonconformance for AP1000 02/21/2014 ML14112A085
2014-27-00 QualTech NP QualTech NP Response to 10CFR Part 21 Notification on Allen Bradley Timing Relays, Event # 49911 (See Part 21 Reports 2014-12-00 and 2014-12-01) 04/09/2014 ML14107A161
2014-26-01 Cameron Measurement Systems Barton Model 288A and 289A Differential Pressure Switch Defect (Supplementary Information and Closure) 06/09/2014 ML14170A013
2014-26-00 Cameron Measurement Systems Barton Model 288A and 289A Differential Pressure Switch Defect 04/10/2014 ML14105A039
2014-25-00 Rosemount Nuclear Instruments Certain Model 1154HP Transmitters Shipped to Point Beach May Exhibit Degraded Functional Reliability 04/10/2014 ML14105A018
2014-24-01 Baldor Electric Co. Potential Defect in Motors Shipped to DTE Electric Company 04/15/2014 ML14112A481
2014-24-00 Baldor Electric Co. Potential Defect in Motors Shipped to DTE Electric Company 04/09/2014 ML14101A344
2014-23-02 QualTech NP Revision to Final Notification Related to Potential Defect in General Electric Type CR120AD Control Relays 02/05/2015 ML15040A083
2014-23-01 QualTech NP Potential Defect in General Electric Type CR120AD Control Relays (Update / Closure) 05/09/2014 ML14134A121
2014-23-00 QualTech NP Potential Defect in General Electric Type CR120AD Control Relays 04/09/2014 ML14101A343
2014-22-00 United Controls International Interim Letter, UCI Not Capable of Determining if a Defect Exists in General Electric SB1 Switches and HEA Relays 04/09/2014 ML14101A342
2014-21-00 Pentair Valves and Controls Interim Report – Evaluation regarding potential deficiencies in justification of use of prorate spring in PV-62 (CAR 674) 03/27/2014 ML14090A433
2014-20-00 Pentair Valves and Controls Interim Report - Evaluation regarding potential deficiencies in testing of PV-62 (CAR 675) 03/27/2014 ML14090A431
2014-19-02 Pentair Valves and Controls Closure of Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) 08/27/2014 ML14241A038
2014-19-01 Pentair Valves and Controls Updated Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) 06/15/2014 ML14169A030
2014-19-00 Pentair Valves and Controls Interim Report - Evaluation Regarding Potential Deficiencies in Seismic Qualifications (CAR 673) 03/27/2014 ML14090A430
2014-18-02 GE Hitachi Nuclear Energy Closure of Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design 08/29/2014 ML14241A306
2014-18-01 GE Hitachi Nuclear Energy Updated Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design 06/26/2014 ML14177A498
2014-18-00 GE Hitachi Nuclear Energy Interim Report: Containment Loads Potentially Exceed Limits with High Suppression Pool Water Level in the ABWR Design 03/31/2014 ML14090A068
2014-17-03 C&D Technologies, Inc. Revision 1 to Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries 10/27/2014 ML14310A186
2014-17-02 C&D Technologies, Inc. Updated Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries - Includes List of Affected Utilities 09/22/2014 ML14274A052
2014-17-01 C&D Technologies, Inc. Final Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries 09/16/2014 ML14266A509
2014-17-00 C&D Technologies, Inc. Interim Report - Inability to Complete Evaluation Regarding Misaligned Separators in LCR-25 Standby Batteries 03/28/2014 ML14094A012
2014-16-00 United Controls International Interim Letter, UCI Not Capable of Determining if a Defect Exists in General Electric SBM Switches 03/19/2014 ML14085A012
2014-15-01 ASCO Valve Incorporated Final Report - Scram Solenoid Valve Not Exhausting Properly 06/16/2014 ML14169A258
2014-15-00 ASCO Valve Incorporated Scram Solenoid Pilot Valve Not Exhausting Properly 03/11/2014 ML14079A026
2014-14-01 United Controls International Faulty Thomas and Betts Logic Power Supply Assembly Printed Circuit Boards (Final Report) 04/17/2014 ML14113A370
2014-14-00 United Controls International Faulty Thomas and Betts Logic Power Supply Assembly Printed Circuit Boards 03/19/2014 ML14085A013
2014-13-01 Dresser-Rand Company PG Type Turbine Mechanical Governor Bearing Missing Aluminum Bronze Insert (Final Report) 04/17/2014 ML14113A398
2014-13-00 Dresser-Rand Company PG Type Turbine Mechanical Governor Bearing Missing Aluminum Bronze Insert 03/17/2014 ML14079A353
2014-12-01 Waterford 3

Allen Bradley Type 700RTC Relay Spurious De-Energizing

04/11/2014 ML14101A467
2014-12-00 Waterford 3

Allen Bradley Type 700RTC Relay Spurious De-Energizing

03/13/2014 ML14079A028
2014-11-01 GE Hitachi Nuclear Energy Closure of Interim Report Related to the Unseating of a Valve Spring on a Scram Solenoid Pilot Valve 07/23/2014 ML14204A706
2014-11-00 GE Hitachi Nuclear Energy Interim Report Related to the Unseating of a Valve Spring on a Scram Solenoid Pilot Valve 03/13/2014 ML14072A324
2014-10-01 Valcor Engineering Corporation Cracked Seat Discovered on Solenoid Operated Process Valve During AP1000 Qualification Testing (Update) 08/15/2014 ML14237A120
2014-10-00 Valcor Engineering Corporation Cracked Seat Discovered on Solenoid Operated Process Valve During AP1000 Qualification Testing 03/12/2014 ML14079A551
2014-09-00 Nuclear Logistics, Inc. Potential Manufacturing Defect in Replacement Masterpact Cradles 02/26/2014 ML14069A467
2014-08-00 Engine Systems, Inc. Emergency Diesel Generator Staring Air Pressure Regulator Supplied to Brunswick Nuclear Plant 02/14/2014 ML14057A806
2014-07-00 ABB Inc. Instruction Leaflet for CVX & CVX-1 Relays May be Deficient 02/10/2014 ML14055A352
2014-06-00 Weir Valves & Controls USA Interim Report Regarding TRICENTRIC Triple Offset Butterfly Valves 02/07/2014 ML14055A394
2014-05-00 Hilti Notification of a Potentially Safety Relevant Non-Conformance for HSL-3 M24 Carbon Steel Expansion Anchors 01/09/2014 ML14030A179
2014-04-01 Westinghouse Electric Co. Part 21/50.55(e) Closure of Interim Report - AP1000 Reactor Coolant Pump Locked Rotor Analysis Deviation 09/08/2014 ML14255A018
2014-04-00 Westinghouse Electric Co. Part 21/50.55(e) Interim Report - AP1000 Reactor Coolant Pump Locked Rotor Analysis Deviation 01/29/2014 ML14042A215
2014-03-01 CB&I Nuclear Closure of Interim Part 21 Report Regarding Deviations of Sub-Modules Supplied for AP1000 CA20 Module Assembly 04/09/2014 ML14112A086
2014-03-00 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Sub-Modules Supplied for AP1000 CA20 Module Assembly 01/21/2014 ML14029A197
2014-02-01 CCI Thermal Technologies, Inc. Closure of Nonconformance of an Electrical Tubular Water Heater 02/12/2016 ML16048A250
2014-02-00 CCI Thermal Technologies, Inc. Nonconformance of an Electrical Tubular Water Heater 01/21/2014 ML14034A188
2014-01-00 C&D Technologies, Inc. Loose Battery Vent Assemblies 01/21/2014 ML14034A189

To top of page

Page Last Reviewed/Updated Wednesday, March 10, 2021