10 CFR 50 Appendix B Notices of Nonconformance (NON) and Violation (NOV) - XI. Test Control

The following table lists, in chronological order, the Quality Assurance (QA) Inspection for New Reactor Licensing reports and Vendor QA Inspection reports with a Criterion XI NON/NOV.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Date Title
01/27/20 Rosemount Nuclear Instruments, Inc., Chanhassen, MN, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs.
06/25/15 National Technical Systems, Huntsville, AL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically as they pertain to the ASME QME-1-2007 functional and flow qualification testing of the 8-inch squib valves for the Westinghouse AP1000 design.
06/11/15 Kinectrics, Toronto, ON, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically as they pertain to safety-related components supplied to operating nuclear power plants.
12/05/14 Curtiss-Wright QualTech NP, Huntsville, Alabama, limited scope inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as it pertains to the implementation of safety-related activities for U.S. regulated facilities.
11/21/14 Southwest Research Institute, San Antonio, TX, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as they pertain to testing and analysis of nuclear safety related components.
11/10/14 Korea Hydro and Nuclear Power Co. Ltd. (KHNP), Daejeon, Korea, design certification inspection of KHNP as it pertains to testing activities conducted at KHNP Central Research Institute.
09/09/14 Curtiss Wright Qualtech NP, Huntsville, AL, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs
05/15/14 Steris Isomedix Services, Whippany, New Jersey, limited scope inspection to assess Steris Isomedixs' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as it pertains to their irradiation services associated with the qualification of nuclear safety related components
08/20/13 Pentair Valves and Controls, Mansfield, MA, limited scope inspection to assess Pentair Valves and Controls' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to activities conducted at their facility related to the design, manufacture, and qualification testing of safety-related valves.
03/21/13 Weir Valves & Controls USA Inc., Ipswich, MA, limited scope inspection to assess Weir Valves and Controls' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically related to the design, fabrication, assembly, and testing activities of components for NRC regulated facilities.
11/02/12 Enertech, Utah State University, Brea, CA, routine limited-scope inspection to assess Enertech's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.
09/07/12 Wyle Laboratories, Huntsville, Alabama, limited-scope routine inspection to assess Wyle Laboratories' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically associated with testing services to support environmental qualification of components being supplied as part of the Westinghouse AP1000 reactor design.
07/23/12 Engine Systems, Inc. (ESI) in Rocky Mount, NC, limited-scope inspection was to verify that Mitsubishi Heavy Industries, Ltd (MHI) effectively implemented quality assurance (QA) processes and procedures for testing activities performed in support of the U.S. Advanced Pressurized-Water Reactor design certification application.
05/18/12 Westinghouse Electric Company (WEC), New Stanton, PA., technically-focused, limited scope inspection was to assess WEC's compliance with selected portions of their quality assurance (QA) program and 10 CFR Part 21 program.
05/10/12 Clark Dynamics, LLC facility (hereafter referred to as Clark), Jefferson Hills, PA, technically-focused, limited scope inspection of Clark's quality assurance (QA) program and 10 CFR Part 21 program, specifically associated with the vibrational aging and seismic qualification of worm gear actuators and electrical penetrations associated with inspections, tests, analyses, and acceptance criteria (ITAAC) 2.2.01.05.ii, 2.2.02.05a.ii, 2.2.05.05a.ii, 2.3.02.05.ii, 2.3.07.05.ii, and 2.7.01.05.ii from Revision 19 of the Westinghouse AP1000 pressurized-water reactor certified design.
01/25/12 Mitsubishi Electric Corporation (MELCO), Kobe, Japan, inspection of selected portions of MELCO'S quality assurance (QA) program and 10 CFR Part 21 program
08/09/11 Mitsubushi Heavy Industries, LTD., US-APWR Design Certification Application - Inspection of the implementation of the quality assurance processes and procedures for testing activities performed in support of the US-APWR DC application in accordance with the requirements of Appendix B to 10 CFR Part 50 and 10 CFR Part 21 at the Alden Research Laboratory facilities in Holden, MA.
07/29/11 Continuum Dynamics, INC, (CDI), Ewing, NJ, inspection of selected portions of CDI's quality assurance (QA) program and 10 CFR Part 21 program
04/22/11

Flowserve Limitorque, Lynchburg, VA, inspection of selected portions of Flowserve Limitorque's quality assurance (QA) program and 10 CFR Part 21 program

07/16/10

Westinghouse Electric Company - Purdue University in West Lafayette, IN - Inspection of the WEC oversight and dedication of the testing conducted at Purdue University related to the design on the AP1000 shield building in accordance with the requirements of 10 CFR Part 21 and Appendix B to 10 CFR Part 50.

04/27/09

Dresser Industries Incorporated, Alexandria, LA, inspection of selected portions of Dresser's quality assurance (QA) program, and 10 CFR Part 21 program

10/15/08

Babcock and Wilcox (B&W) Nuclear Operations Group Mount Vernon Facility, Mount Vernon, IN, inspection of selected portions of B&W's quality assurance (QA) program, and 10 CFR Part 21 program

05/08/08

Tioga Pipe Supply Company, Inc., Philadelphia, PA, inspection of selected portions of Tioga's quality assurance (QA) program, and 10 CFR Part 21 program

12/28/07

Areva NP, Inc., Cranberry Township, PA, inspection of selected portions of Areva NP's quality assurance (QA) program, and 10 CFR Part 21 program implemented at Eaton Cutler-Hammer's facility in Greenwood, South Carolina

Page Last Reviewed/Updated Friday, September 16, 2022