Date Title
02/26/20 Westinghouse Electric Company, Hopkins, SC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at their facility related to the design, fabrication, assembly, and testing of fuel assemblies for NRC’s regulated facilities.
12/16/19 ENSA Equipos Nucleares S.A. S.M.E., Cantabria, Spain , limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs, specifically as they pertain to activities conducted at their facility related to the commercial grade dedication program associated with nuclear-related parts for NRC’s regulated facilities.
12/03/18

Westinghouse Electric Sweden AB, Vastera, Sweden, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs as they pertain to activities conducted at your facility related to the design, fabrication, assembly, and testing of fuel assemblies for NRC's regulated facilities.

08/22/17

Flowserve Corporation, Raleigh, NC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and Part 21 programs as it pertains to activities conducted at your facility related to the design, fabrication, and testing of valves and replacement valve parts for NRC's regulated facilities.

03/30/17

Chicago Bridge & Iron (CB&I), Laurens, SC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, as they pertain to CB&I Laurens' implementation of quality activities associated with the fabrication and testing of safety-related piping for the Westinghouse Electric Company AP1000 reactor design.

06/09/16

Equipos Nucleares, S.A (ENSA), Cantabria, Spain, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to the design, fabrication, assembly, and testing of components for NRC regulated facilities.

01/21/16

Canberra Industries, Meriden, CT, limited-scope inspection to assess compliance with selected portions of their quality assurance (QA) program as they pertain to design, fabrication, testing, and commercial grade dedication of radiation monitoring equipment supplied to operating nuclear power plants.

07/24/15 Specialty Maintenance and Construction, Inc. (SMCI), Lakeland, FL, limited scope reactive inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, as they pertain SMCI's implementation of quality activities associated with the fabrication of the embed plates for the CA-01 (steam generator and refueling canal modules) and CA-02 (independent wall structure connecting CA-1 and CA-03 (in-containment refueling water storage tank module)) modules for the Westinghouse Electric Company's AP1000 reactor design.
05/22/15 Chicago Bridge & Iron Power, Laurens, SC, limited scope inspection to assess compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as they pertain to activities related to the fabrication of piping spools for the Westinghouse Electric Company AP1000 reactor design.
08/26/14 Valinox Nucleaire Company, Montbard, France, multinational inspection to review implementation of their quality assurance program in accordance with the Multinational Design Evaluation Program (MDEP) Protocol Document. The team will be focused on the review of aspects of their QA program as it pertains to safety-related activities associated with the fabrication of steam generator tubes.
05/16/14 Specialty Maintenance and Construction, Inc., Lakeland, Florida, limited scope inspection to assess their compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically as it pertains to activities conducted related to the design, manufacture, and qualification testing of components for NRC regulated facilities
10/02/13 Chicago Bridge & Iron (CB&I) (formerly known as B.F. Shaw), Laurens, South Carolina., limited scope inspection to assess CB&I's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically related to the fabrication of piping for the US AP1000 plants.
08/20/13 Pentair Valves and Controls, Mansfield, MA, limited scope inspection to assess Pentair Valves and Controls' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs as they pertain to activities conducted at their facility related to the design, manufacture, and qualification testing of safety-related valves.
05/07/13 Meggitt Safety Systems, Simi Valley, CA, limited scope inspection to assess Meggitt's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically as they pertain to the design, procurement, manufacture, and test of a sample of Class 1E cables and post-accident hydrogen and oxygen containment atmosphere monitoring systems.
03/21/13 Weir Valves & Controls USA Inc., Ipswich, MA, limited scope inspection to assess Weir Valves and Controls' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs specifically related to the design, fabrication, assembly, and testing activities of components for NRC regulated facilities.
03/19/13 Cives Steel Company (Cives), Southern Division facility, Thomasville, GA, limited scope inspection to assess Cives' compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs, specifically associated with the fabrication of concrete embedments for AP1000 reactor plants at Vogtle Electric Generating Plant, Units 3 and 4, and Virgil C. Summer Nuclear Station, Units 2 and 3.
10/17/12 Flowserve Corporation, Raleigh, NC, routine limited-scope inspection to assess Flowserve Corporation's compliance with selected portions of their quality assurance (QA) and 10 CFR Part 21 programs.
06/06/12 SPX, Copes-Vulcan facility (SPX), McKean, PA., technically-focused, limited scope inspection of SPX's quality assurance (QA) program and 10 CFR Part 21 program, specifically associated with the QA activities associated with the design and manufacturing of the squib valves for the AP1000 reactor design.
01/06/12 Shaw Modular Solutions, Lake Charles, LA, follow-up inspection of selected portions of SMS's quality assurance (QA) program and 10 CFR Part 21 program