2009 - Calvert Cliffs, Unit 3 Application

On this page:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Applicant Documents

The following table provides access to the COL Application and other documents that Calvert Cliffs 3 Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC submitted in 2009 for Calvert Cliffs, Unit 3.

Date Description
12/31/09 Summary Letter of the Differences between the Phase I and Phase II Non Tidal and Stream Mitigation Plans
12/09/09 Letter transmitting Low Level Waste Disposal Options
12/04/09 Letter transmitting Construction Acreage and Timeframe
10/29/09 Response to Questions on Revision 5 of the COL application on impervious surfaces and construction acreage
09/22/09 Revised Work Description Letter to US Army Corps
09/21/09 Electronic Reference Portal Response Letter
09/10/09 TRAGIS and RADTRAN Information Need Response
08/25/09 Revision 1 of New Alternative Site Information for Calvert Cliffs
07/01/09 U.S. EPR RCOLA/SCOLA Standardization Matrix
06/30/09 Transmittal Letter Revision 5 of the COL Application for Calvert Cliffs
06/01/09 Alternate Site Evaluation Report Submittal Schedule
06/01/09 Transmittal of Supplemental Information in Support of Site Geology Audit, Calvert Cliffs Nuclear Power Plant, Unit 3
05/22/09 Biological Evaluation for Tiger Beetles
05/15/09 Transmittal of Revised Schedule for Seismic Analysis and Geotechnical Deliverables
05/13/09 Federal Fish and Wildlife Permit for Eagle Scientific Collecting
04/14/09 Restrictions of Construction/Refurbishment of the Barge Slip/Unloading Facility and Associated Dredging
03/27/09 Notification to NRC of Extension of Security Submittal
03/27/09 Notification to NRC, COLA Revision 5 Scope
03/16/09 Submittal of Post-April 2009 through FY 2011 Combined License Application Revision Schedule
03/09/09 UniStar transmittal letter for Calvert Cliffs Unit 3 COLA, Revision 4

See Application
02/13/09 Response to FEMA Request for Additional Information Regarding Offsite Emergency Planning Activities
01/14/09 Letter from UniStar on Intake Structure Relocation Changes for the Environmental Report

NRC Documents

The following table provides access to documents and correspondence that the NRC has issued in 2009 in connection with its review of the COL application that Calvert Cliffs 3 Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC submitted for Calvert Cliffs, Unit 3.

Date Description
09/16/09 Condition Letter for the Electronic Portal for the Calvert Cliffs COL Review
08/20/09 Issuance of a Revised Environmental Schedule for the Combined License Application Review for the Calvert Cliffs Nuclear Power Plant, Unit 3
08/20/09 Safety Project manager Change for the Combined License Safety Review for Calvert Cliffs Nuclear Power Plant Unit 3
07/14/09 Review Schedule for Calvert Cliffs Unit 3 Combined License Application (Safety Review)
03/23/09 Environmental Project Manager Change for the Combined License Environmental Review for Calvert Cliffs Nuclear Power Plant Unit 3
01/16/09 Change in Schedule of the Calvert Cliffs Combined License Application Environmental Review