2008 - Calvert Cliffs, Unit 3 Application

On this page:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Applicant Documents

The following table provides access to the COL Application and other documents that Calvert Cliffs 3 Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC submitted in 2008 for Calvert Cliffs, Unit 3.

Date Description
11/25/08

UniStar transmittal letter for Calvert Cliffs Unit 3 COLA, Revision 3

See Application
10/31/08 Submittal of Response to Requests for Additional Information for Hydrology Report
10/31/08 Submittal of a Listing of the Combined License Application - Intake Structure Relocation Affected Sections
10/10/08 RCOLA Schedule Issue - Core Borings
10/10/08 Submittal of Replacement Disks for Response to Request for Additional Information
09/11/08 Submittal of the Published UniStar Nuclear Topical Report "Quality Assurance Program Description," Revision 1
08/20/08 Submittal of Corrected Revision 3 to the Combined License Application for the Calvert Cliffs Nuclear Power Plant, Unit 3
08/19/08 Submittal of Supplemental Information - Design Parameters for Category I Structure Foundation Dimensions
08/18/08 Submittal of Supplemental Information - Seismic Lateral Earth Pressure Analysis
08/01/08 Submittal of Revision 3 to Combined License Application, and Application for Withholding Documents
07/31/08 Submittal of Supplemental Information, Updated Information for Ground Motion Response Spectrum
07/14/08 Letter from Unistar to Corps enclosing Figures non-tidal and tidal wetlands, and concept site plan, and work description
06/20/08 Submittal of Supplemental Information, Detailed Ground Water Dewatering Plan
05/30/08 Submittal of Supplemental Information, Seismic Catalog
05/15/08 May 15, 2008 supplement (Emergency Plan (Part 5) and State and Local Emergency Plans (Part 11H)) [This Part contains information which is withheld from public availability.]
03/14/08 March 14, 2008 supplement (Information Associated with Soil Hazard Curves at Additional Annual Exceedence Frequencies)
03/14/08

UniStar transmittal letter for Calvert Cliffs Unit 3 COLA, Part II

See Application
03/03/08 March 3, 2008 supplement (Electronic Data Associated with the Probabilistic Seismic Hazards Analysis)
01/14/08 January 14, 2008 revision to partial COL application

NRC Documents

The following table provides access to documents and correspondence that the NRC has issued in 2008 in connection with its review of the COL application that Calvert Cliffs 3 Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC submitted for Calvert Cliffs, Unit 3.

Date Description
10/21/08 Trip Report for the Thiokol and Calvert Cliffs visits on October 16, 2008
10/15/08 Environmental Scoping Summary Report
09/18/08 Calvert Cliffs 3 Nuclear Project, LLC, and UniStar Nuclear Operating Services, LLC - Notice of Hearing and Associated Opportunity to Petition for Leave to Intervene; Order Imposing Procedures for Access to Sensitive Unclassified Nonsafeguards Information (SUNSI) and Safeguards Information (SGI) for Contention Preparation
09/03/08 Army Corps Public Notice in Reply to Application for Calvert Cliffs Nuclear Project
07/10/08 Site Audit Trip Report
06/03/08 Acceptance Review for Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit 3
05/29/08 Request for Federal Emergency Management Agency Review of UniStar Nuclear Operating Services and Constellation Generation Group, Calvert Cliffs Unit 3 Combined License Application - Supplement to Application [This letter contains information which is withheld from public availability.]
02/08/08 Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping
01/25/08 Docketing of the Partial Combined Application

Page Last Reviewed/Updated Sunday, September 18, 2022