Applicant Documents
The following table provides access to the COL Application and other documents that Calvert Cliffs 3 Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC submitted in 2008 for Calvert Cliffs, Unit 3.
Date |
Description |
11/25/08 |
UniStar transmittal letter for Calvert Cliffs Unit 3 COLA, Revision 3
See Application |
10/31/08 |
Submittal of Response to Requests for Additional Information for Hydrology Report |
10/31/08 |
Submittal of a Listing of the Combined License Application - Intake Structure Relocation Affected Sections |
10/10/08 |
RCOLA Schedule Issue - Core Borings |
10/10/08 |
Submittal of Replacement Disks for Response to Request for Additional Information |
09/11/08 |
Submittal of the Published UniStar Nuclear Topical Report "Quality Assurance Program Description," Revision 1 |
08/20/08 |
Submittal of Corrected Revision 3 to the Combined License Application for the Calvert Cliffs Nuclear Power Plant, Unit 3 |
08/19/08 |
Submittal of Supplemental Information - Design Parameters for Category I Structure Foundation Dimensions |
08/18/08 |
Submittal of Supplemental Information - Seismic Lateral Earth Pressure Analysis |
08/01/08 |
Submittal of Revision 3 to Combined License Application, and Application for Withholding Documents |
07/31/08 |
Submittal of Supplemental Information, Updated Information for Ground Motion Response Spectrum |
07/14/08 |
Letter from Unistar to Corps enclosing Figures non-tidal and tidal wetlands, and concept site plan, and work description |
06/20/08 |
Submittal of Supplemental Information, Detailed Ground Water Dewatering Plan |
05/30/08 |
Submittal of Supplemental Information, Seismic Catalog |
05/15/08 |
May 15, 2008 supplement (Emergency Plan (Part 5) and State and Local Emergency Plans (Part 11H)) [This Part contains information which is withheld from public availability.] |
03/14/08 |
March 14, 2008 supplement (Information Associated with Soil Hazard Curves at Additional Annual Exceedence Frequencies) |
03/14/08 |
UniStar transmittal letter for Calvert Cliffs Unit 3 COLA, Part II
See Application |
03/03/08 |
March 3, 2008 supplement (Electronic Data Associated with the Probabilistic Seismic Hazards Analysis) |
01/14/08 |
January 14, 2008 revision to partial COL application |
NRC Documents
The following table provides access to documents and correspondence that the NRC has issued in 2008 in connection with its review of the COL application that Calvert Cliffs 3 Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC submitted for Calvert Cliffs, Unit 3.
Date |
Description |
10/21/08 |
Trip Report for the Thiokol and Calvert Cliffs visits on October 16, 2008 |
10/15/08 |
Environmental Scoping Summary Report |
09/18/08 |
Calvert Cliffs 3 Nuclear Project, LLC, and UniStar Nuclear Operating Services, LLC - Notice of Hearing and Associated Opportunity to Petition for Leave to Intervene; Order Imposing Procedures for Access to Sensitive Unclassified Nonsafeguards Information (SUNSI) and Safeguards Information (SGI) for Contention Preparation |
09/03/08 |
Army Corps Public Notice in Reply to Application for Calvert Cliffs Nuclear Project |
07/10/08 |
Site Audit Trip Report |
06/03/08 |
Acceptance Review for Combined License Application for Calvert Cliffs Nuclear Power Plant, Unit 3 |
05/29/08 |
Request for Federal Emergency Management Agency Review of UniStar Nuclear Operating Services and Constellation Generation Group, Calvert Cliffs Unit 3 Combined License Application - Supplement to Application [This letter contains information which is withheld from public availability.] |
02/08/08 |
Notice of Intent to Prepare an Environmental Impact Statement and Conduct Scoping |
01/25/08 |
Docketing of the Partial Combined Application |