Safety Evaluations with Open Items for Calvert Cliffs, Unit 3 Application
The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that Calvert Cliffs 3 Nuclear Project, LLC and UniStar Nuclear Operating Services, LLC submitted for Calvert Cliffs, Unit 3.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Chapter |
Description |
Date |
1 |
Introduction and General Description of Plant |
TBD |
2 |
Site Characteristics - Sections 2.0 through 2.3 |
10/29/10 |
Hydrologic Engineering - Section 2.4 |
10/23/13 |
Geology, Seismology & Geotechnical Engineering - Section 2.5 |
04/12/13 |
3 |
Design of Structures, Components, Equipment, and Systems (Except Section 3.7) |
01/25/13 |
4 |
Reactor |
03/24/10 |
5 |
Reactor Coolant System and Connected Systems |
03/30/10 |
6 |
Engineered Safety Features |
04/01/11 |
7 |
Instrumentation and Controls Systems |
10/17/11 |
8 |
Electric Power |
01/20/10 |
9 |
Auxiliary Systems |
10/08/13 |
10 |
Steam and Power Conversion System |
06/16/10 |
11 |
Radioactive Waste Management |
10/21/10 |
12 |
Radiation Protection |
03/18/10 |
13 |
Conduct of Operations |
05/02/13 |
14 |
Initial Test Program |
01/24/13 |
15 |
Accident and Analysis |
07/22/11 |
16 |
Technical Specifications |
11/04/10 |
17 |
Quality Assurance |
04/29/10 |
18 |
Human Factors Engineering |
10/31/11 |
19 |
Response to Severe Accident Policy Statement |
04/30/10 |