Other Links
FAQ
Agreement States
Facility Locator
What's New
Site Help
Index A-Z
Contact Us
Email Updates
Report a Safety Concern
Nuclear Reactors
Nuclear Reactors
Power Reactors
Research & Test Reactors
Operating Reactors
New Reactors
Operator Licensing
Research Activities
Nuclear Reactor Quick Links
Nuclear Materials
Nuclear Materials
Types of Nuclear Materials
Fuel Cycle Facilities
Medical, Industrial, & Academic Uses
Uranium Recovery
Materials Transportation
Materials Environmental Reviews
National Materials Program
Nuclear Materials Quick Links
Radioactive Waste
Radioactive Waste
Decommissioning of Nuclear Facilities
Low-Level Waste
Waste Incidental to Reprocessing
High-Level Waste
Uranium Mill Tailings
Low-Level Waste Disposal
High-Level Waste Disposal
Storage of Spent Nuclear Fuel
Transportation of Spent Nuclear Fuel
Research Activities
Radioactive Waste Quick Links
Nuclear Security
Nuclear Security
Domestic Safeguards
Information Security
Radioactive Material Security
Required Reporting for Clearance Holders
Insider Threat Program for Licensees
Cybersecurity
Criminal History & Firearms Checks
Contact Us
Public Meetings & Involvement
Public Meetings & Involvement
The NRC Approach to Open Government
About Meetings Open to the Public
Conferences & Symposia
Documents for Comment
NRC Information Quality Guidelines
Subscribe to E-mail Updates
Really Simple Syndication (RSS) Feeds
Commission Schedule
Public Meeting Schedule
Adjudications (Hearings)
Adjudicatory Submissions
NRC Rules and Petitions
NRC Library
NRC Library
Basic References
Document Collections
ADAMS Public Documents
Public Document Room
LSN Library
FOIA & Privacy Act
Photos & Videos
Records Management
Training Courses
FAQ Index
Get Copies of Documents
Withholding of Sensitive Information
Controlled Unclassified Information Program (CUI)
Electronic Hearing Docket
About NRC
About NRC
The Commission
Organization & Functions
Artificial Intelligence
Governing Legislation
Plans, Budget, & Performance
Locations
History
Values
Direction-Setting & Policymaking
Research Activities
Radiation Protection
Fire Protection
Safety Culture
How We Regulate
Emergency Preparedness & Response
Congressional Affairs
Enforcement
International Programs
State & Tribal Programs
Alternative Dispute Resolution Programs
Privacy Program
Civil Rights Program
Contact Us
Career Opportunities
Contracting Opportunities
Small Businesses
Grant Opportunities
Generic Schedules
Home
NRC Library
Document Collections
NUREG-Series Publications
Publications Prepared by NRC Staff
NUREG 0933
Select Documents to Export
Find
Clear
Export
☰ Table of Contents:
Please use Ctrl-F/Find to locate keywords in requested documents
Related Technical Area
Auxiliary Feedwater
Chemistry, Chemical Engineering
Containment (leakage, degradation, cooling system performance)
Cyber Security
ECCS
Electrical Power Systems
Emergency Preparedness
Fire Protection
Flood Protection & Missiles
Fuels
HVAC and Dose Assessment
Health Physics
Human Performance
Instrumentation and Controls
Other
Physical Security
Power Uprates
Primary Materials/Vessels and Piping/Welding
Pump and Valve Performance
Quality Assurance and Vendor Issues
Safety Culture
Spent Fuel Storage and Handling
Station Service Water Systems/Ultimate Heat Sink
Steam Generators
Structural
Worker Fatigue
Resolution Product Category
Generic Communications
Generic Communications, Regulatory Guidance
Indirect (Generic Communications)
Indirect (Policy and Rules)
Indirect (Regulatory Guidance)
NA
No Products
Policy and Rules
Policy and Rules, Generic Communications
Regulatory Guidance
Facilities Type
All Light Water Power Reactors
BWR - Mark 1
BWR - Mark 2
BWR - Mark 3
Fuel Facility
New Reactors
Non Light Water Power Reactors
PWR - B&W
PWR - CE
PWR - Westinghouse
Test Reactors
Search in
Abstract
Abbreviations
Introduction
Section 1 TMI Action Plan Items
Section 2 Task Action Plan Items
Section 3 New Generic Issues
Section 4 Human Factor Issues
Section 5 Chernobyl Issues
Section 6 Nuclear Material Safety and Safeguards Issues
Section 7 Fukushima Issues
Appendices
Revision History
Abstract
Abbreviations
Introduction
Section 1. TMI Action Plan Items ( )
Description
Task I.A: OPERATING PERSONNEL: Operating Personnel and Staffing: Shift Technical Advisor
Task I.A.2: OPERATING PERSONNEL: Training and Qualifications of Operating Personnel: Immediate Upgrading of Operator and Senior Operator Training and Qualifications: Qualifications - Experience
Task I.A.3: OPERATING PERSONNEL: Licensing and Requalification of Operating Personnel: Revise Scope of Criteria for Licensing Examinations
Task I.A.4: OPERATING PERSONNEL: Initial Simulator Improvement: Short-Term Study of Training Simulators
Task I.B: SUPPORT PERSONNEL: Management for Operations: Organization and Management Long-Term Improvements: Prepare Draft Criteria
Task I.B.2: SUPPORT PERSONNEL: Inspection of Operating Reactors: Revise OIE Inspection Program: Verify the Adequacy of Management and Proced
Task I.C: OPERATING PROCEDURES: Short-Term Accident Analysis and Procedures Revision: Small Break LOCAs
Task I.D: CONTROL ROOM DESIGN: Control Room Design Reviews
Task I.E: ANALYSIS AND DISSEMINATION OF OPERATING EXPERIENCE: Office for Analysis and Evaluation of Operational Data
Task I.F: QUALITY ASSURANCE: Expand QA List
Task I.G: PREOPERATIONAL AND LOW-POWER TESTING: Training Requirements
Task II.A: SITING: Siting Policy Reformulation
Task II.B: CONSIDERATION OF DEGRADED OR MELTED CORES IN SAFETY REVIEW: Plant Shielding to Provide Access to Vital Areas and Protect Safety Equipment for Post-Accident Operation
Task II.C: RELIABILITY ENGINEERING AND RISK ASSESSMENT: Interim Reliability Evaluation Program
Task II.D: REACTOR COOLANT SYSTEM RELIEF AND SAFETY VALVES: Testing Requirements
Task II.E: SYSTEM DESIGN: Auxiliary Feedwater System: Auxiliary Feedwater System Evaluation
Task II.E.2: SYSTEM DESIGN: Emergency Core Cooling System: Reliance on ECCS
Task II.E.3: SYSTEM DESIGN: Decay Heat Removal: Reliability of Power Supplies for Natural Circulation
Task II.E.4: SYSTEM DESIGN: Containment Design: Dedicated Penetrations
Task II.E.5: SYSTEM DESIGN: Design Sensitivity of B&W Reactors: Design Evaluation
Task II.E.6: SYSTEM DESIGN: In Situ Testing of Valves: Test Adequacy Study
Task II.F: INSTRUMENTATION AND CONTROLS: Additional Accident Monitoring Instrumentation
Task II.G: ELECTRICAL POWER: Power Supplies for Pressurizer Relief Valves, Block Valves, and Level Indicators
Task II.H: TMI-2 CLEANUP AND EXAMINATION: Maintain Safety of TMI-2 and Minimize Environmental Impact
Task II.J: GENERAL IMPLICATIONS OF TMI FOR DESIGN AND CONSTRUCTION ACTIVITIES: Vendor Inspection Program: Establish a Priority System for C
Task II.J.2: GENERAL IMPLICATIONS OF TMI FOR DESIGN AND CONSTRUCTION ACTIVITIES: Construction Inspection Program: Reorient Construction Inspe
Task II.J.3: GENERAL IMPLICATIONS OF TMI FOR DESIGN AND CONSTRUCTION ACTIVITIES: Construction Inspection Program: Assign Resident Inspectors to All Construction Sites
Task II.J.4: GENERAL IMPLICATIONS OF TMI FOR DESIGN AND CONSTRUCTION ACTIVITIES: Revise Deficiency Reporting Requirements: Revise Deficiency Reporting Requirements
Task II.K: MEASURES TO MITIGATE SMALL-BREAK LOSS-OF-COOLANT ACCIDENTS AND LOSS-OF-FEEDWATER ACCIDENTS: IE Bulletins: Review TMI-2 PNs and D
Task III.A: EMERGENCY PREPAREDNESS AND RADIATION EFFECTS: Improve Licensee Emergency Preparedness - Short-Term: Upgrade Emergency Preparedness: Implement Action Plan Requirements for Promptly Improving Licensee Emergency Preparedness
Task III.A.2: EMERGENCY PREPAREDNESS AND RADIATION EFFECTS: Improving Licensee Emergency Preparedness - Long-Term: Amend 10 CFR 50 and 10 CFR
Task III.A.3: EMERGENCY PREPAREDNESS AND RADIATION EFFECTS: Improving NRC Emergency Preparedness: NRC Role in Responding to Nuclear Emergencie
Task III.B: EMERGENCY PREPAREDNESS OF STATE AND LOCAL GOVERNMENTS: Transfer of Responsibilities to FEMA
Task III.C: PUBLIC INFORMATION: Have Information Available for the News Media and the Public: Review Publicly Available Documents
Task III.D: RADIATION PROTECTION: Radiation Source Control: Primary Coolant Sources Outside the Containment Structure: Review Information Su
Task III.D.2: RADIATION PROTECTION: Public Radiation Protection Improvement: Radiological Monitoring of Effluents: Evaluate the Feasibility and Perform a Value-Impact Analysis of Modifying Effluent-Monitoring Design Criteria
Task III.D.3: RADIATION PROTECTION: Worker Radiation Protection Improvement: Radiation Protection Plans
Task IV.A: STRENGTHEN ENFORCEMENT PROCESS: Seek Legislative Authority
Task IV.B: ISSUANCE OF INSTRUCTIONS AND INFORMATION TO LICENSEES: Revise Practices for Issuance of Instructions and Information to Licensees
Task IV.C: EXTEND LESSONS LEARNED TO LICENSED ACTIVITIES OTHER THAN POWER REACTORS: Extend Lessons Learned from TMI to Other NRC Programs
Task IV.D: NRC STAFF TRAINING: NRC Staff Training
Task IV.E: SAFETY DECISION-MAKING: Expand Research on Quantification of Safety Decision-Making
Task IV.F: FINANCIAL DISINCENTIVES TO SAFETY: Increased OIE Scrutiny of the Power-Ascension Test Program
Task IV.G: IMPROVE SAFETY RULEMAKING PROCEDURES: Develop a Public Agenda for Rulemaking
Task IV.H: NRC PARTICIPATION IN THE RADIATION POLICY COUNCIL: NRC Participation in the Radiation Policy Council
Task V.A: DEVELOPMENT OF SAFETY POLICY: Develop NRC Policy Statement on Safety
Task V.B: POSSIBLE ELIMINATION OF NONSAFETY RESPONSIBILITIES: Study and Recommend, as Appropriate, Elimination of Nonsafety Responsibiliti
Task V.C: ADVISORY COMMITTEES: Strengthen the Role of Advisory Committee on Reactor Safeguards
Task V.D: LICENSING PROCESS: Improve Public and Intervenor Participation in the Hearing Process
Task V.E: LEGISLATIVE NEEDS: Study the Need for TMI-Related Legislation
Task V.F: ORGANIZATION AND MANAGEMENT: Study NRC Top Management Structure and Process
Task V.G: CONSOLIDATION OF NRC LOCATIONS: Achieve Single Location, Long-Term
Section 2. Task Action Plan Items ( )
Description
Item A-1: Water Hammer (former USI)
Item A-2: Asymmetric Blowdown Loads on Reactor Primary Coolant Systems (former USI)
Item A-3: Westinghouse Steam Generator Tube Integrity (former USI)
Item A-4: CE Steam Generator Tube Integrity (former USI)
Item A-7: Mark I Long-Term Program (former USI)
Item A-6: Mark I Short-Term Program (former USI)
Item A-7: Mark I Long-Term Program (former USI)
Item A-8: Mark II Containment Pool Dynamic Loads Long-Term Program (former USI)
Item A-9: ATWS (former USI)
Item A-10: BWR Feedwater Nozzle Cracking (former USI)
Item A-11: Reactor Vessel Materials Toughness (former USI)
Item A-12: Fracture Toughness of Steam Generator and Reactor Coolant Pump Supports (former USI)
Item A-13: Snubber Operability Assurance
Item A-14: Flaw Detection
Item A-15: Primary Coolant System Decontamination and Steam Generator Chemical Cleaning
Item A-16: Steam Effects on BWR Core Spray Distribution
Item A-17: Systems Interactions in Nuclear Power Plants (former USI)
Item A-18: Pipe Rupture Design Criteria
Item A-19: Digital Computer Protection System
Item A-20: Impacts of the Coal Fuel Cycle
Item A-21: Main Steamline Break Inside Containment - Evaluation of Environmental Conditions for Equipment Qualification
Item A-22: PWR Main Steamline Break - Core, Reactor Vessel and Containment Building Response
Item A-23: Containment Leak Testing
Item A-24: Qualification of Class 1E Safety-Related Equipment (former USI)
Item A-25: Non-Safety Loads on Class 1E Power Sources
Item A-27: Reload Applications
Item A-28: Increase in Spent Fuel Pool Storage Capacity
Item A-29: Nuclear Power Plant Design for the Reduction of Vulnerability to Industrial Sabotage
Item A-30: Adequacy of Safety-Related DC Power Supplies
Item A-31: RHR Shutdown Requirements (former USI)
Item A-32: Missile Effects
Item A-33: NEPA Review of Accident Risks
Item A-34: Instruments for Monitoring Radiation and Process Variables During Accidents
Item A-35: Adequacy of Offsite Power Systems
Item A-36: Control of Heavy Loads Near Spent Fuel (former USI)
Item A-37: Turbine Missiles
Item A-38: Tornado Missiles
Item A-39: Determination of Safety Relief Valve Pool Dynamic Loads and Temperature Limits (former USI)
Item A-40: Seismic Design Criteria (former USI)
Item A-41: Long-Term Seismic Program
Item A-42: Pipe Cracks in Boiling Water Reactors (former USI)
Item A-43: Containment Emergency Sump Performance (former USI)
Item A-44: Station Blackout (former USI)
Item A-45: Shutdown Decay Heat Removal Requirements (former USI)
Item A-46: Seismic Qualification of Equipment in Operating Plants (former USI)
Item A-47: Safety Implications of Control Systems (former USI)
Item A-48: Hydrogen Control Measures and Effects of Hydrogen Burns on Safety Equipment
Item A-49: Pressurized Thermal Shock (former USI)
Item B-1: Environmental Technical Specifications
Item B-3: Event Categorization
Item B-4: ECCS Reliability
Item B-5: Ductility of Two-Way Slabs and Shells and Buckling Behavior of Steel Containments
Item B-6: Loads, Load Combinations, Stress Limits
Item B-7: Secondary Accident Consequence Modeling
Item B-8: Locking Out of ECCS Power Operated Valves
Item B-9: Electrical Cable Penetrations of Containment
Item B-10: Behavior of BWR Mark III Containments
Item B-11: Subcompartment Standard Problems
Item B-12: Containment Cooling Requirements (Non-LOCA)
Item B-13: Marviken Test Data Evaluation
Item B-14: Study of Hydrogen Mixing Capability in Containment Post-LOCA
Item B-15: CONTEMPT Computer Code Maintenance
Item B-16: Protection Against Postulated Piping Failures in Fluid Systems Outside Containment
Item B-17: Criteria for Safety-Related Operator Actions
Item B-18: Vortex Suppression Requirements for Containment Sumps
Item B-19: Thermal-Hydraulic Stability
Item B-20: Standard Problem Analysis
Item B-21: Core Physics
Item B-22: LWR Fuel
Item B-23: LMFBR Fuel
Item B-121: Seismic Qualification of Electrical and Mechanical Equipment
Item B-25: Piping Benchmark Problems
Item B-26: Structural Integrity of Containment Penetrations
Item B-27: Implementation and Use of Subsection NF
Item B-28: Radionuclide/Sediment Transport Program
Item B-29: Effectiveness of Ultimate Heat Sinks
Item B-30: Design Basis Floods and Probability
Item B-31: Dam Failure Model
Item B-32: Ice Effects on Safety-Related Water Supplies
Item B-33: Dose Assessment Methodology
Item B-34: Occupational Radiation Exposure Reduction
Item B-35: Confirmation of Appendix I Models for Calculations of Releases of Radioactive Materials in Gaseous and Liquid Effluents from Light Water Cooled Power Reactors
Item B-36: Develop Design, Testing, and Maintenance Criteria for Atmosphere Cleanup System Air Filtration and Adsorption Units for Engineer
Item B-37: Chemical Discharges to Receiving Waters
Item B-38: Reconnaissance Level Investigations
Item B-142: Transmission Lines
Item B-40: Effects of Power Plant Entrainment on Plankton
Item B-41: Impacts on Fisheries
Item B-42: Socioeconomic Environmental Impacts
Item B-43: Value of Aerial Photographs for Site Evaluation
Item B-44: Forecasts of Generating Costs of Coal and Nuclear Plants
Item B-45: Need for Power - Energy Conservation
Item B-46: Cost of Alternatives in Environmental Design
Item B-47: Inservice Inspection of Supports-Classes 1, 2, 3, and MC Components
Item B-48: BWR Control Rod Drive Mechanical Failures
Item B-49: Inservice Inspection Criteria and Corrosion Prevention Criteria for Containments
Item B-50: Post-Operating Basis Earthquake Inspection
Item B-51: Assessment of Inelastic Analysis Techniques for Equipment and Components
Item B-52: Fuel Assembly Seismic and LOCA Responses
Item B-53: Load Break Switch
Item B-54: Ice Condenser Containments
Item B-55: Improved Reliability of Target Rock Safety Relief Valves
Item B-56: Diesel Reliability
Item B-57: Station Blackout
Item B-58: Passive Mechanical Failures
Item B-59: (N-1) Loop Operation in BWRs and PWRs
Item B-60: Loose Parts Monitoring Systems
Item B-61: Allowable ECCS Equipment Outage Periods
Item B-62: Reexamination of Technical Bases for Establishing SLs, LSSSs, and Reactor Protection System Trip Functions
Item B-63: Isolation of Low Pressure Systems Connected to the Reactor Coolant Pressure Boundary
Item B-64: Decommissioning of Reactors
Item B-65: Iodine Spiking
Item B-66: Control Room Infiltration Measurements
Item B-67: Effluent and Process Monitoring Instrumentation
Item B-68: Pump Overspeed During LOCA
Item B-69: ECCS Leakage Ex-Containment
Item B-70: Power Grid Frequency Degradation and Effect on Primary Coolant Pumps
Item B-71: Incident Response
Item B-72: Health Effects and Life Shortening from Uranium and Coal Fuel Cycles
Item B-73: Monitoring for Excessive Vibration Inside the Reactor Pressure Vessel
Item C-1: Assurance of Continuous Long-Term Capability of Hermetic Seals on Instrumentation and Electrical Equipment
Item C-2: Study of Containment Depressurization by Inadvertent Spray Operation to Determine Adequacy of Containment External Design Pressu
Item C-3: Insulation Usage Within Containment
Item C-4: Statistical Methods for ECCS Analysis
Item C-5: Decay Heat Update
Item C-6: LOCA Heat Sources
Item C-7: PWR System Piping
Item C-8: Main Steam Line Leakage Control Systems
Item C-9: RHR Heat Exchanger Tube Failures
Item C-10: Effective Operation of Containment Sprays in a LOCA
Item C-11: Assessment of Failure and Reliability of Pumps and Valves
Item C-12: Primary System Vibration Assessment
Item C-13: Non-Random Failures
Item C-14: Storm Surge Model for Coastal Sites
Item C-15: NUREG Report for Liquid Tank Failure Analysis
Item C-16: Assessment of Agricultural Land in Relation to Power Plant Siting and Cooling System Selection
Item C-17: Interim Acceptance Criteria for Solidification Agents for Radioactive Solid Wastes
Item D-1: Advisability of a Seismic Scram
Item D-2: Emergency Core Cooling System Capability for Future Plants
Item D-3: Control Rod Drop Accident
Section 3. New Generic Issues ( )
Description
Issue 1: Failures in Air-Monitoring, Air-Cleaning, and Ventilating Systems
Issue 2: Failure of Protective Devices on Essential Equipment
Issue 3: Set Point Drift in Instrumentation
Issue 4: End-of-Life and Maintenance Criteria
Issue 5: Design Check and Audit of Balance-of-Plant Equipment
Issue 6: Separation of Control Rod from Its Drive and BWR High Rod Worth Events
Issue 7: Failures Due to Flow-Induced Vibrations
Issue 8: Inadvertent Actuation of Safety Injection in PWRs
Issue 9: Reevaluation of Reactor Coolant Pump Trip Criteria
Issue 10: Surveillance and Maintenance of TIP Isolation Valves and Squib Charges
Issue 11: Turbine Disc Cracking
Issue 12: BWR Jet Pump Integrity
Issue 13: Small-Break LOCA from Extended Overheating of Pressurizer Heaters
Issue 14: PWR Pipe Cracks
Issue 15: Radiation Effects on Reactor Vessel Supports
Issue 16: BWR Main Steam Isolation Valve Leakage Control Systems
Issue 17: Loss of Offsite Power Subsequent to a LOCA
Issue 18: Steam Line Break with Consequential Small LOCA
Issue 19: Safety Implications of Nonsafety Instrument and Control Power Supply Bus
Issue 20: Effects of Electromagnetic Pulse on Nuclear Power Plants
Issue 21: Vibration Qualification of Equipment
Issue 22: Inadvertent Boron Dilution Events
Issue 23: Reactor Coolant Pump Seal Failures
Issue 24: Automatic ECCS Switchover to Recirculation
Issue 25: Automatic Air Header Dump on BWR Scram System
Issue 26: Diesel Generator Loading Problems Related to SIS Reset on Loss of Offsite Power
Issue 27: Manual vs. Automated Actions
Issue 28: Pressurized Thermal Shock
Issue 29: Bolting Degradation or Failure in Nuclear Power Plants
Issue 30: Potential Generator Missiles - Generator Rotor Retaining Rings
Issue 31: Natural Circulation Cooldown
Issue 32: Flow Blockage in Essential Equipment Caused by Corbicula
Issue 33: Correcting Atmospheric Dump Valve Opening Upon Loss of Integrated Control System Power
Issue 34: RCS Leak
Issue 35: Degradation of Internal Appurtenances in LWRs
Issue 36: Loss of Service Water
Issue 37: Steam Generator Overfill and Combined Primary and Secondary Blowdown
Issue 38: Potential Recirculation System Failure as a Consequence of Ingestion of Containment Paint Flakes or Other Fine Debris
Issue 39: Potential for Unacceptable Interaction Between the CRD System and Non-Essential Control Air System
Issue 40: Safety Concerns Associated with Pipe Breaks in the BWR Scram System
Issue 41: BWR Scram Discharge Volume Systems
Issue 42: Combination Primary/Secondary System LOCA
Issue 43: Reliability of Air Systems
Issue 44: Failure of Saltwater Cooling System
Issue 45: Inoperability of Instrumentation Due to Extreme Cold Weather
Issue 46: Loss of 125 Volt DC Bus
Issue 47: Loss of Offsite Power
Issue 48: LCO for Class 1E Vital Instrument Buses in Operating Reactors
Issue 49: Interlocks and LCOs for Redundant Class 1E Tie-Breakers
Issue 50: Reactor Vessel Level Instrumentation in BWRs
Issue 51: Proposed Requirements for Improving the Reliability of Open Cycle Service Water Systems
Issue 52: SSW Flow Blockage by Blue Mussels
Issue 53: Consequences of a Postulated Flow Blockage Incident in a BWR
Issue 54: Valve Operator-Related Events Occurring During 1978, 1979, and 1980
Issue 55: Failure of Class 1E Safety-Related Switchgear Circuit Breakers to Close on Demand
Issue 56: Abnormal Transient Operating Guidelines as Applied to a Steam Generator Overfill Event
Issue 57: Effects of Fire Protection System Actuation on Safety-Related Equipment
Issue 58: Inadvertent Containment Flooding
Issue 59: Technical Specification Requirements for Plant Shutdown when Equipment for Safe Shutdown is Degraded or Inoperable
Issue 60: Lamellar Tearing of Reactor Systems Structural Supports
Issue 61: SRV Line Break Inside the BWR Wetwell Airspace of Mark I and II Containments
Issue 62: Reactor Systems Bolting Applications
Issue 63: Use of Equipment Not Classified as Essential to Safety in BWR Transient Analysis
Issue 64: Identification of Protection System Instrument Sensing Lines
Issue 65: Probability of Core-Melt Due to Component Cooling Water System Failures
Issue 66: Steam Generator Requirements
Issue 67: Steam Generator Staff Actions: Integrity of Steam Generator Tube Sleeves
Issue 68: Postulated Loss of Auxiliary Feedwater System Resulting from Turbine-Driven Auxiliary Feedwater Pump Steam Supply Line Rupture
Issue 69: Make-Up Nozzle Cracking in B&W Plants MTEB
Issue 70: PORV and Block Valve Reliability
Issue 71: Failure of Resin Demineralizer Systems and Their Effects on Nuclear Power Plant Safety
Issue 72: Control Rod Drive Guide Tube Support Pin Failures
Issue 73: Detached Thermal Sleeves
Issue 74: Reactor Coolant Activity Limits for Operating Reactors
Issue 75: Generic Implications of ATWS Events at the Salem Nuclear Plant
Issue 76: Instrumentation and Control Power Interactions
Issue 77: Flooding of Safety Equipment Compartments by Back-Flow Through Floor Drains
Issue 78: Monitoring of Fatigue Transient Limits for Reactor Coolant System
Issue 79: Unanalyzed Reactor Vessel Thermal Stress During Natural Convection Cooldown
Issue 80: Pipe Break Effects on Control Rod Drive Hydraulic Lines in the Drywells of BWR Mark I and II Containments
Issue 81: Impact of Locked Doors and Barriers on Plant and Personnel Safety
Issue 82: Beyond Design-Basis Accidents in Spent Fuel Pools
Issue 83: Control Room Habitability
Issue 84: CE PORVs
Issue 85: Reliability of Vacuum Breakers Connected to Steam Discharge Lines Inside BWR Containments
Issue 86: Long-Range Plan for Dealing with Stress Corrosion Cracking in BWR Piping
Issue 87: Failure of HPCI Steam Line Without Isolation
Issue 88: Earthquakes and Emergency Planning
Issue 89: Stiff Pipe Clamps
Issue 90: Technical Specifications for Anticipatory Trips ICSB
Issue 91: Main Crankshaft Failures in Transamerica DeLaval Emergency Diesel Generators
Issue 92: Fuel Crumbling During LOCA
Issue 93: Steam Binding of Auxiliary Feedwater Pumps
Issue 94: Additional Low Temperature Overpressure Protection for Light-Water Reactors
Issue 95: Loss of Effective Volume for Containment Recirculation Spray
Issue 96: RHR Suction Valve Testing
Issue 97: PWR Reactor Cavity Uncontrolled Exposures
Issue 98: CRD Accumulator Check Valve Leakage
Issue 99: RCS/RHR Suction Line Valve Interlock on PWRs
Issue 100: Once-Through Steam Generator Level
Issue 101: BWR Water Level Redundancy
Issue 102: Human Error in Events Involving Wrong Unit or Wrong Train
Issue 103: Design for Probable Maximum Precipitation
Issue 104: Reduction of Boron Dilution Requirements
Issue 105: Interfacing Systems LOCA at LWRs
Issue 106: Piping and Use of Highly Combustible Gases in Vital Areas
Issue 107: Main Transformer Failures
Issue 108: BWR Suppression Pool Temperature Limits
Issue 109: Reactor Vessel Closure Failure
Issue 110: Equipment Protective Devices on Engineered Safety Features
Issue 111: Stress Corrosion Cracking of Pressure Boundary Ferritic Steels in Selected Environments
Issue 112: Westinghouse RPS Surveillance Frequencies and Out-of-Service Times
Issue 113: Dynamic Qualification Testing of Large Bore Hydraulic Snubbers
Issue 114: Seismic-Induced Relay Chatter
Issue 115: Enhancement of the Reliability of Westinghouse Solid State Protection System
Issue 116: Accident Management
Issue 117: Allowable Time for Diverse Simultaneous Equipment Outages
Issue 118: Tendon Anchorage Failure
Issue 119: Piping Review Committee Recommendations: Piping Rupture Requirements and Decoupling of Seismic and LOCA Loads
Issue 120: On-Line Testability of Protection Systems
Issue 121: Hydrogen Control for Large, Dry PWR Containments
Issue 122: Davis-Besse Loss of All Feedwater Event of June 9, 1985: Short-Term Actions: Potential Inability to Remove Reactor Decay Heat: F
Issue 123: Deficiencies in the Regulations Governing DBA and Single-Failure Criteria Suggested by the Davis-Besse Event of June 9, 1985
Issue 124: Auxiliary Feedwater System Reliability
Issue 125: Davis-Besse Loss of All Feedwater Event of June 9, 1985: Long-Term Actions: Availability of the Shift Technical Advisor
Issue 126: Reliability of PWR Main Steam Safety Valves
Issue 127: Maintenance and Testing of Manual Valves in Safety-Related Systems
Issue 128: Electrical Power Reliability
Issue 129: Valve Interlocks to Prevent Vessel Drainage During Shutdown Cooling
Issue 130: Essential Service Water Pump Failures at Multiplant Sites
Issue 131: Potential Seismic Interaction Involving the Movable In-Core Flux Mapping System Used in Westinghouse-Designed Plants
Issue 132: RHR System Inside Containment
Issue 133: Update Policy Statement on Nuclear Plant Staff Working Hours
Issue 134: Rule on Degree and Experience Requirement
Issue 135: Steam Generator and Steam Line Overfill
Issue 136: Storage and Use of Large Quantities of Cryogenic Combustibles On Site
Issue 137: Refueling Cavity Seal Failure
Issue 138: Deinerting of BWR Mark I and II Containments During Power Operations Upon Discovery of RCS Leakage or a Train of a Safety System
Issue 139: Thinning of Carbon Steel Piping in LWRs
Issue 140: Fission Product Removal Systems
Issue 141: Large-Break LOCA With Consequential SGTR
Issue 142: Leakage Through Electrical Isolators in Instrumentation Circuits
Issue 143: Availability of Chilled Water Systems and Room Cooling
Issue 144: Scram Without a Turbine/Generator Trip
Issue 145: Actions to Reduce Common Cause Failures
Issue 146: Support Flexibility of Equipment and Components
Issue 147: Fire-Induced Alternate Shutdown/Control Room Panel Interactions
Issue 148: Smoke Control and Manual Fire-Fighting Effectiveness
Issue 149: Adequacy of Fire Barriers
Issue 150: Overpressurization of Containment Penetrations
Issue 151: Reliability of Anticipated Transient Without SCRAM Recirculation Pump Trip in BWRs
Issue 152: Design Basis for Valves That Might Be Subjected to Significant Blowdown Loads
Issue 153: Loss of Essential Service Water in LWRs
Issue 154: Adequacy of Emergency and Essential Lighting
Issue 155: More Realistic Source Term Assumptions
Issue 156: Systematic Evaluation Program: Settlement of Foundations and Buried Equipment
Issue 157: Containment Performance
Issue 158: Performance of Power-Operated Valves Under Design Basis Conditions
Issue 159: Qualification of Safety-Related Pumps While Running on Minimum Flow
Issue 160: Spurious Actions of Instrumentation Upon Restoration of Power
Issue 161: Use of Non-Safety-Related Power Supplies in Safety-Related Circuits
Issue 162: Inadequate Technical Specifications for Shared Systems at Multiplant Sites When One Unit Is Shut Down
Issue 163: Multiple Steam Generator Tube Leakage
Issue 164: Neutron Fluence in Reactor Vessel
Issue 165: Safety and Safety/Relief Valve Reliability
Issue 166: Adequacy of Fatigue Life of Metal Components
Issue 167: Hydrogen Storage Facility Separation
Issue 168: Environmental Qualification of Electrical Equipment
Issue 169: BWR MSIV Common Mode Failure Due to Loss of Accumulator Pressure
Issue 170: Fuel Damage Criteria for High Burnup Fuel
Issue 171: ESF Failure from LOOP Subsequent to a LOCA
Issue 172: Multiple System Responses Program
Issue 173: Spent Fuel Storage Pool: Operating Facilities
Issue 174: Fastener Gaging Practices: SONGS Employees' Concern
Issue 175: Nuclear Power Plant Shift Staffing
Issue 176: Loss of Fill-Oil in Rosemount Transmitters
Issue 177: Vehicle Intrusion at TMI
Issue 178: Effect of Hurricane Andrew on Turkey Point
Issue 179: Core Performance
Issue 180: Notice of Enforcement Discretion
Issue 181: Fire Protection
Issue 182: General Electric Extended Power Uprate
Issue 183: Cycle-Specific Parameter Limits in Technical Specifications
Issue 184: Endangered Species
Issue 185: Control of Recriticality Following Small-Break LOCA In PWRs
Issue 186: Potential Risk and Consequences of Heavy Load Drops
Issue 187: The Potential Impact of Postulated Cesium Concentration on Equipment Qualification in the Containment Sump in Nuclear Power Plan
Issue 188: Steam Generator Tube Leaks/Ruptures Concurrent with Containment Bypass
Issue 189: Susceptibility of Ice Condenser Containments to Early Failure from Hydogen Combustion During A Severe Accident
Issue 190: Fatigue Evaluation of Metal Components for 60-Year Plant Life
Issue 191: Assessment of Debris Accumulation on PWR Sump Performance
Issue 192: Secondary Containment Drawdown Time
Issue 193: BWR ECCS Suction Concerns
Issue 194: Implications of Updated Probabilistic Seismic Hazard Estimates
Issue 195: Hydrogen Combustion in Foreign BWR Piping
Issue 196: Boral Degradation
Issue 197: Iodine Spiking Phenomena
Issue 198: Hydrogen Combustion in PWR Piping
Issue 199: Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States
Issue 200: Tin Whiskers
Issue 201: Small-Break LOCA and Loss of Offsite Power Scenario
Issue 202: Spent Fuel Pool Leakage Limits
Issue 203: Potential Safety Issues with Cranes that Lift Spent Fuel Casks
Issue 204: FLOODING OF NUCLEAR POWER PLANT SITES FOLLOWING UPSTREAM DAM FAILURES
Section 4. Human Factors Issues ( )
Description
Task HF1: STAFFING AND QUALIFICATIONS: Shift Staffing
Task HF2: TRAINING: Evaluate Industry Training
Task HF3: OPERATOR LICENSING EXAMINATIONS: Develop Job Knowledge Catalog
Task HF4: PROCEDURES: Inspection Procedure for Upgraded Emergency Operating Procedures
Task HF5: MAN-MACHINE INTERFACE: Local Control Stations
Task HF6: MANAGEMENT AND ORGANIZATION: Develop Regulatory Position on Management and Organization
Task HF7: HUMAN RELIABILITY: Human Error Data Acquisition
Task HF8: Maintenance and Surveillance Program
Section 5. Chernobyl Issues ( )
Description
Task CH1: ADMINISTRATIVE CONTROLS AND OPERATIONAL PRACTICES: Administrative Controls to Ensure That Procedures Are Followed and That Procedures Are Adequate: Symptom-Based EOPs
Task CH2: DESIGN: Reactivity Accidents: Reactivity Transients
Task CH3: CONTAINMENT: Containment Performance During Severe Accidents: Containment Performance
Task CH4: EMERGENCY PLANNING: Size of the Emergency Planning Zones
Task CH5: SEVERE ACCIDENT PHENOMENA: Source Term: Mechanical Dispersal in Fission Product Release
Task CH6: GRAPHITE-MODERATED REACTORS: Graphite-Moderated Reactors: The Fort St. Vrain Reactor and the Modular HTGR
Section 6. Nuclear Material Safety and Safeguards GSIs ( )
Description
NMSS-0001: Door Interlock Failure Resulting from Faulty Microselectron High Dose Rate Remote Afterloader
NMSS-0002: Significant Quantities of Fixed Contamination Remain in Krypton-85 Leak-Detection Devices after Venting
NMSS-0003: Corrosion of Sealed Sources Caused by Sensitization of Stainless Steel Source Capsules During Shipment
NMSS-0004: Overexposures Caused by Sources Stolen from Facility of Bankrupt Licensee
NMSS-0005: Potential for Erroneous Calibration, Dose Rate, or Radiation Exposure Measurements with Victoreen Electrometers
NMSS-0006: Criticality in Low-Level Waste
NMSS-0007: Criticality Benchmarks Greater than 5% Enrichment
NMSS-0008: Year 2000 Computer Problem - Non-Reactor Licensees
NMSS-0009: Amersham Radiography Source Cable Failures
NMSS-0010: Troxler Gauge Source Rod Weld Failures
NMSS-0011: Spent Fuel Dry Cask Weld Cracks
NMSS-0012: Inadequate Transportation Packaging Puncture Tests
NMSS-0013: Use of Different Dose Equivalent Models to Show Compliance
NMSS-0014: Surety Estimates for Groundwater Restoration at in Situ Leach Facilities
NMSS-0015: Adequacy of 10 CFR 150 Criticality Requirements
NMSS-0016: Adequacy of 0.05 Weight Percent Limit in 10 CFR 40
NMSS-0017: Misleading Marketing Information to General Licensees
NMSS-0018: Problems Encountered When Manually Editing Treatment Planning Data on Nucletron Microselectron-HDR Model 105.999
NMSS-0019: Control Unit Failures of Classic Nucletron HDR Units
NMSS-0020: Leaking Pools
NMSS-0021: Unlikely Events
NMSS-0022: Gamma Stereotactic Radiosurgery
Section 7. Fukushima Issues ( )
Description
Issue 199: Implications of Updated Probabilistic Seismic Hazard Estimates in Central and Eastern United States
Issue 204: FLOODING OF NUCLEAR POWER PLANT SITES FOLLOWING UPSTREAM DAM FAILURES
Tables ( )
Description
TABLE II: LIST OF ALL THREE MILE ISLAND NUCLEAR PLANT ACTION PLAN ITEMS, TASK ACTION PLAN ITEMS, NEW GENERIC ISSUES, HUMAN FACT
Table III: SUMMARY OF THE STATUS OF ALL GENERIC SAFETY ISSUES
TABLE IV: LISTING OF AEOD REPORTS AND RELATED GENERIC ISSUES
TABLE V: SUMMARY OF CONSOLIDATED GENERIC ISSUES
Appendices ( )
Description
Appendix A: Releases from Containment
Appendix B: Applicability of NUREG-0933 Issues to Operating and Future Reactor Plants
Appendix C: Priority Ranking Numerical Thresholds Used in Prioritizations Completed Before June 30, 1993
Appendix D: Related Generic Activities
Appendix E: Generic Communication and Compliance Activities
Appendix F: Nuclear Material Safety and Safeguards GSIs
Appendix G: Generic Issues Program Current and Historical Procedures
NUREG 0933: Revision History
Description
Page Last Reviewed/Updated 06/24/2025