Project Target DatesFinal Safety Evaluation target issuance – 11/11/2024Final Environmental Assessment target issuance – 8/30/2024Loading Project Dashboard... To s...
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.The procedures list was obtained from Inspection Manual Chapter 2630, "Mixed Oxide Fuel Fabrication Facility Construction Inspection Program"Construction ...
After issuing a combined license (COL) for a new reactor, in accordance with the provisions of Title 10, Part 52, of the Code of Federal Regulations (10 CFR Part 52), the U.S. Nuclear Regulatory Commission (NRC) implements a stringent construction inspection program (CIP) duri...
The West Valley site is in western New York State. The West Valley Demonstration Project Act of 1980 (WVDPA) contains the following information specific to the U.S. Nuclear Regulatory Commission (NRC):The Secretary of Energy shall decontaminate and decommission any material an...
January 17, 1997EA 96-480Roberts Construction Company ATTN:Mr. David H. Roberts Radiation Safety Officer P. O. Box 610 Louisa, KY 41230SUBJECT:NOTICE OF VIOLATION(NRC INSPECTION REPORT NO. 16-24818-02/96-01)Dear Mr. Roberts:This refers to the inspection conducted during the pe...
October 2, 1996EA 96-314Anderson Columbia Construction, Inc.
ATTN: Mr. T. H. McRae, President
Post Office Box 1386
Lake City, Florida 32056-1386SUBJECT:NOTICE OF VIOLATION
(NRC Inspection Report No. 999-90002/96-04)Dear Mr. McRae:This refers to the inspection conducted ...
November 6, 2001EA-01-214Mr. Charles F. Mathy, President Mathy Construction Company 920 10th Avenue North P.O. Box 189 Onalaska, WI 54650SUBJECT: NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY -$3000 (NRC INSPECTION REPORT NO. 03014086/2001-001(DNMS))D...
January 16, 1998EA 97-471
Construction Products Research, Inc.
Five Star Products, Inc.
ATTN: Mr. H. Nash Babcock
435 Stillson Road
Fairfield, Connecticut 06430-3148SUBJECT:NOTICE OF VIOLATION
(Office of Investigations Case No. 1-93-027R)Dear Mr. Babcock:
This letter...
Contact: Edward Conaway or Alan Mikus
361-972-7643 361-972-7217
econaway@stpegs.com amikus@stpegs.com
www.stpegs.com www.stpegs.com
Team continues...
November 6, 2001 EA-01-240Redondo Construction Corporation ATTN: Mr. Jorge Redondo President GPO Box 364185 San Juan, Puerto Rico 00936-4185SUBJECT: NOTICE OF VIOLATION (NRC INSPECTION REP...
Project OverviewIn March 2020, Abilene Christian University (ACU) submitted to the NRC a Letter of Intent to submit an application for a construction permit for a non-power molten salt reactor. In May 2022, ACU submitted a Regulatory Engagement Plan related to this proje...
September 27, 2001EA-01-181Mr. Ronald A. Pickering II Vice President Operations Construction Engineering Labs, Inc. 96-1173 Waihona Street, Suite B7 Pearl City, Hawaii 96782SUBJECT: NOTICE OF VIOLATION & PROPOSED IMPOSITION OF CIVIL PENALTY – $3,000 (NRC Inspec...
The requirements of this section must be met for irradiators whose construction begins after July 1, 1993. The requirements must be met prior to loading sources.(a) Shielding. For panoramic irradiators, the licensee shall monitor the construction of the shielding to verify tha...
July 20, 1998EA 98-377
Otto J. Kruger
Vice President
KTI Construction Services, Inc.
9003 West 51st Street
Merriam, KS 66203SUBJECT:NOTICE OF VIOLATION AND NRC INSPECTION REPORT 030-30164/98001(DNMS)Dear Mr. Kruger:
This refers to the inspection conducted on June 22 and ...
This page provides the NRC Construction Inspection Reports for the SHINE Medical Technologies, LLC Medical Isotope Production Facility per NRC Inspection Manual Chapter 2550, "Non-Power Production and Utilization Facilities Licensed Under 10 CFR Part 50: Construction Insp...
This panel session will focus on the framework the staff is developing for new and advanced reactor construction oversight. This framework applies construction oversight experience and leverages lessons from past construction projects such as Vogtle Electric Generating Plant, ...
The staff of the U.S. Nuclear Regulatory Commission (NRC) is tracking the license applications that were submitted and approved. Although several fuel cycle facilities possess approved licenses, the corporations are not currently pursuing construction due to business reasons. ...
This site description was provided by the cognizant Agreement State, and the U.S. Nuclear Regulatory Commission (NRC) makes no claim regarding the validity of the information provided. See our Site Disclaimer for more information.1.0 Site IdentificationType of Site:Complex Mat...
External Panel:Buzz Miller, Nuclear Development, Southern Nuclear Operating Company, Inc. & Executive Vice President for Nuclear Development, Georgia Power CompanyJeff Archie, Senior Vice President and Chief Nuclear Officer, South Carolina Electric & Gas CompanyJeffrey...
On this page:PurposeTable 1 – ARCAP/TI-CAP Publicly Issued DocumentsTable 2 – ARCAP/TI-CAP Public MeetingsPurposeThe outcome of the Advanced Reactor Content of Application Project (ARCAP) was the issuance of technology-inclusive, risk-informed and performance-based...
July 1, 1997EA 97-193Mr. John Herbert, Sr., President Hagerstown Construction Services, Inc. 1023 Maryland Avenue Hagerstown, Maryland 21740SUBJECT:NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY – $2,750(NRC Inspection Report No. 150-00019/97-001)Dear Mr. Herbert...
January 15, 2003EA-02-215Rio Construction Corporation ATTN: Mr. Gregory Mazza Vice-President of Administration PO Box 10462 Caparra Heights, Puerto Rico 00922-0462SUBJECT:NOTICE OF VIOLATION AND PROPOSED IMPOSITION OF CIVIL PENALTY-$3,000 (NRC INSPECTION REPORT NO. 52-25537-01...
December 22, 1997EA 97-509James W. Abbott, President University of South Dakota School of Medicine 414 East Clark Street Vermillion, South Dakota 57069-2390SUBJECT:NOTICE OF VIOLATION(NRC Inspection Report No. 030-15186/97-01)Dear Mr. Abbott:This refers to the predecisional en...