The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Environmental Standard Review Plan: StandardReview Plans for Environmental Reviews for Nuclear Power Plants — Alternatives to the Proposed Action (NUREG-1555, Chapter 9)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
9.0 Alternatives to the Proposed Action Rev. 0 03/2000
9.1 No-Action Alternative Rev. 0 03/2000
9.2 Energy Alternatives Rev. 0 03/2000
9.2.1 Alternatives Not Requiring New Generating Capacity Draft Rev. 1 07/2007
Rev. 0 03/2000
9.2.2 Alternatives Requiring New Generating Capacity Draft Rev. 1 07/2007
Rev. 0 03/2000
9.2.3 Assessment of Alternative Energy Sources and Systems Draft Rev. 1 07/2007
Rev. 0 03/2000
9.3 Alternative Sites
Note that Rev 1 for Section 9.3 is a complete Rewrite from the previous version. Therefore changes in this section are not indicated by highlighted text as is for the other ESRP sections.
Draft Rev. 1 07/2007
Rev. 0 03/2000
9.4 Alternative Plant and Transmission Systems Rev. 0 03/2000
9.4.1 Heat Dissipation Systems Draft Rev. 1 07/2007
Rev. 0 03/2000
9.4.2 Circulating Water Systems Draft Rev. 1 07/2007
Rev. 0 03/2000
9.4.3 Transmission Systems Draft Rev. 1 07/2007
Rev. 0 03/2000