Bulletins: 1983 Index
Document Number | Title | Revision | Publish Date | Reviewed Date |
---|---|---|---|---|
BL-83-08 | Elect. Circuit Breakers With Undervoltage Trip...in Safety-Related Applications other than the Reactor Trip System | -- | 12/28/1983 | -- |
BL-83-07 | Apparently Fraudulent Products Sold by Ray Miller, Inc. | S2 | 12/09/1983 | -- |
S1 | 10/26/1983 | -- | ||
-- | 07/22/1983 | -- | ||
BL-83-06 | Nonconforming Materials Supplied by Tube-Line Facilities at Long Island City, NY, Houston, TX, & Carol Stream, IL | -- | 07/22/1983 | -- |
BL-83-05 | ASME Nuclear Code Pumps and Spare Parts Manufactured by the Hayward Tyler Pump Company | -- | 05/13/1983 | -- |
BL-83-04 | Failure of the Undervoltage Trip Function of Reactor Trip Breakers | -- | 03/11/1983 | -- |
BL-83-03 | Check Valve Failures in Raw Water Cooling Systems of Diesel Generators | -- | 03/10/1983 | -- |
BL-83-02 | Stress Corrosion Cracking in Large-Diameter Stainless Steel Recirculation System Piping at BWR Plants | -- | 03/04/1983 | -- |
BL-83-01 | Failure of Trip Breakers (Westinghouse DB-50) to Open on Automatic Trip Signal | -- | 02/25/1983 | -- |
Page Last Reviewed/Updated Tuesday, March 09, 2021
Page Last Reviewed/Updated Tuesday, March 09, 2021