Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Bulletins: 1982 Index

Document Number Title Revision Publish Date Reviewed Date
BL-82-04 Deficiencies in Primary Containment Electrical Penetration Assemblies -- 12/03/1982 --
BL-82-03 Stress Corrosion Cracking in Thick-Wall, Large Diameter, Stainless Steel, Recirculation System Piping at BWR Plants 1 10/28/1982 --
-- 10/14/1982 --
BL-82-02 IE Bulletin No. 82-02: Degradation of Threaded Fasteners in the Reactor Coolant Pressure Boundary of PWR Plants -- 06/02/1982 --
BL-82-01 Alteration of Radiographs of Welds in Piping Subassemblies 1S1 08/18/1982 --
1 05/07/1982 --
-- 03/31/1982 --