Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Bulletins: 1979 Index

Document Number Title Revision Publish Date Reviewed Date
BL-79-28 Possible Malfunction of NAMCO Model EA180 Limit Switches at Elevated Temperatures -- 12/07/1979 --
BL-79-27 Loss of Non-Class-1-E Instrumentation and Control Power System Bus During Operation -- 11/30/1979 --
BL-79-26 Boron Loss from BWR Control Blades 1 08/29/1980 --
-- 11/20/1979 --
BL-79-25 Failures of Westinghouse BFD Relays in Safety-Related Systems -- 11/02/1979 --
BL-79-24 Frozen Lines -- 09/27/1979 --
BL-79-23 Potential Failure of Emergency Diesel Generator Field Exciter Transformer -- 09/12/1979 --
BL-79-22 Possible Leakage of Tubes of Tritium Gas Used in Time Pieces for Luminosity -- 09/05/1979 --
BL-79-21 Temperature Effects on Level Measurements -- 08/13/1979 --
BL-79-20 Packaging, Transport and Burial of Low-Level Radioactive Waste -- 08/10/1979 --
BL-79-19 Packaging of Low-Level Radioactive Waste for Transport and Burial -- 08/10/1979 --
BL-79-18 Audibility Problems Encountered on Evacuation of Personnel from High-Noise Areas -- 08/07/1979 --
BL-79-17 Pipe Cracks in Stagnant Borated Water Systems at PWR Plants 1 10/29/1979 --
-- 07/26/1979 --
BL-79-16 Vital Area Access Controls -- 07/26/1979 --
BL-79-15 Deep Draft Pump Deficiencies S1 Date Unknown --
-- 07/11/1979 --
BL-79-14 Seismic Analyses for As-Built Safety-Related Piping Systems 1S2 09/07/1979 --
1S1 08/15/1979 --
1 07/02/1979 --
-- 07/02/1979 --
BL-79-13 Cracking in Feedwater System Piping 2 10/16/1979 --
1 08/30/1979 --
-- 06/25/1979 --
BL-79-12 Short Period Scrams at BWR Facilities -- 05/31/1979 --
BL-79-11 Faulty Overcurrent Trip Device in Circuit Breakers for Engineered Safety Systems -- 05/22/1979 --
BL-79-10 Requalification Training Program Statistics -- 05/11/1979 --
BL-79-09 Failures of GE Type AK-2 Circuit Breaker in Safety Related Systems -- 04/17/1979 --
BL-79-08 Events Relevant to Boiling Water Reactors Identified During Three Mile Island Incident -- 04/14/1979 --
BL-79-07 Seismic Stress Analysis of Safety-Related Piping -- 04/14/1979 --
BL-79-06c Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident -- 07/26/1979 --
BL-79-06b Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident -- 04/14/1979 --
BL-79-06a Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident 1 04/18/1979 --
-- 04/14/1979 --
BL-79-06 Review of Operational Errors and System Misalignments Identified During the Three Mile Island Incident -- 04/11/1979 --
BL-79-05 Nuclear Incident at Three Mile Island S3 07/26/1979 --
S2 04/21/1979 --
S1 04/05/1979 --
-- 04/01/1979 --
BL-79-04 Incorrect Weights for Swing Check Valves Manufactured by Velan Engineering Corporation -- 03/30/1979 --
BL-79-03 Longitudinal Weld Defects in ASME SA-312 Type 304 Stainless Steel Pipe Spools Mfg. by Youngstown Welding & Engineering Company S1 04/04/1980 --
-- 03/12/1979 --
BL-79-02 Pipe Support Base Plate Designs Using Concrete Expansion Anchor Bolts 2 11/08/1979 --
1S1 08/20/1979 --
1 06/21/1979 --
-- 03/08/1979 --
BL-79-01b Environmental Qualification of Class IE Equipment S3 10/24/1980 --
S2 09/30/1980 --
S1 02/29/1980 --
-- 01/14/1980 --
BL-79-01 Environmental Qualification of Class IE Equipment S1 06/06/1979 --
1 02/27/1979 --
-- 02/08/1979 --









 

Page Last Reviewed/Updated Tuesday, March 09, 2021

Page Last Reviewed/Updated Tuesday, March 09, 2021