The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Part 21 Reports - 2015

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Log No Notifier Description Report Date Event No. / Accession No.
2015-88-03 CB&I AREVA MOX Services Closure of Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 10/25/2016 ML16299A386
2015-88-02 CB&I AREVA MOX Services Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 07/26/2016 ML16208A315
2015-88-01 CB&I AREVA MOX Services Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 04/26/2016 ML16118A372
2015-88-00 CB&I AREVA MOX Services Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication 12/16/2015 ML15351A054
2015-87-03 Homewood Products Corporation Final Report on Part 21 Issue with Irradiations Performed by Steris Isomedix Services 05/13/2016 ML16145A069
2015-87-02 Homewood Products Corporation Part 21 Issue on Irradiations Performed by Steris Isomedix Services (Updated) 03/22/2016 ML16102A078
2015-87-01 Homewood Products Corporation Part 21 Issue on Irradiations performed by Steris Isomedix Services 01/08/2016 ML16012A502
2015-87-00 Homewood Products Corporation Part 21 Issue on Irradiations performed by Steris Isomedix Services (based upon information provided by National Technical Systems) 12/21/2015 ML16004A029
2015-86-02 WECTEC LLC (formerly CB&I Power) Updated Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects 03/09/2016 ML16076A263
2015-86-01 WECTEC LLC (formerly CB&I Power) Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects 02/03/2016 ML16039A257
2015-86-00 CB&I Interim Report Regarding Wall Penetration Corrosion for Vogtle Unit 4 and V.C. Summer Unit 3 AP1000 Projects 12/08/2015 ML16014A712
2015-85-00 Three Mile Island Unit 1 Part 21 Notification Due To Breaker Defect 12/28/2015 ML15363A009
2015-84-01 WECTEC LLC (Former CB&I) Closure of Interim Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle Unit 3 AP1000 Project 07/05/2016 ML16197A150
2015-84-00 CB&I Interim Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle Unit 3 AP1000 Project 12/10/2015 ML15357A004
2015-83-00 MPR  Associates, Inc. Replacement EDG Timing Module Failure at Hatch Nuclear Plant 12/23/2015 ML16004A030
2015-82-00 Nutherm International, Inc. Potential Part 21 Report Involving Moore Industries RTD Transmitter 12/18/2015 ML15357A041
2015-81-00 Curtiss-Wright QualTech NP Eaton/Cutler Hammer A200 series Starters and Contactors 12/18/2015 ML15357A042
2015-80-00 Howden North America, Inc. Two Fan Motors Were Not Properly Prepared before Small Steel Shot Blasting 12/08/2015 ML15345A390
2015-79-00 United Controls International Improper Silver Plating During Refurbishment of AK-25 Type Circuit Breakers 12/01/2015 ML15341A328
2015-78-02 WECTEC LLC (formerly CB&I Power) Closure of Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project 07/05/2016 ML16197A150
2015-78-01 WECTEC LLC (formerly CB&I Power) Updated Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project 01/21/2016 ML16053A285
2015-78-00 CB&I Power Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project 11/12/2015 ML15331A003
2015-77-00 CB&I Power Closure of Interim Report Regarding Deviations of Packing Material for Stainless Steel Pipe Spools for Vogtle 3 & 4 and V. C. Summer Units 2 & 3 AP1000 Projects 11/12/2015 ML15331A002
2015-76-01 WECTEC LLC (Former CB&I) Closure of Interim Part 21 Report Regarding Nonconforming Rebar Cross-Ties for V. C. Summer Unit 3 AP1000 Project 07/05/2016 ML16197A150
2015-76-00 CB&I Interim Part 21 Report Regarding Nonconforming Rebar Cross-Ties for V. C. Summer Unit 3 AP1000 Project 10/29/2015 ML15324A107
2015-75-06 WECTEC LLC Closure of Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 12/19/2016 ML17013A024
2015-75-05 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 10/20/2016 ML16302A014
2015-75-04 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 08/30/2016 ML16252A321
2015-75-03 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 06/27/2016 ML16197A151
2015-75-02 WECTEC LLC Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 04/12/2016 ML16110A262
2015-75-01 WECTEC LLC (formerly CB&I Power) Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 01/21/2016 ML16053A286
2015-75-00 CB&I Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 10/29/2015 ML15313A496
2015-74-00 Crane Nuclear, Inc. Notification of Pressure Seal Valve Segment Ring Material Compliance 10/23/2015 ML15303A014
2015-73-00 Engine Systems, Inc. Emergency Diesel Generator Speed Switch Capacitor Failure 10/23/2015 ML15314A031
2015-72-01 Emerson Process Management Safety Related TopWorx Switch Misalignment (Updated) 11/05/2015 ML16258A456
2015-72-00 Emerson Process Management Safety Related TopWorx Switch Misalignment 10/23/2015 ML15303A006
2015-71-01 Waterford 3 Westinghouse Type KIR-60 Current Transformer (Both Emergency Diesel Generators Declared Inoperable - a 50.73 report Supplement) 12/06/2016 ML16341C141
2015-71-00 Waterford 3 Westinghouse Type KIR-60 Current Transformer (Both Emergency Diesel Generators Declared Inoperable - a 50.73 report) 10/23/2015 ML15303A004
2015-70-01 Crane Nuclear, Inc. Final Report: Pressure Retaining Rings Used in Pressure Seal Valves 09/30/2015 ML15274A062
2015-70-00 Crane Nuclear, Inc. Interim Report: Notification of Retaining Ring Material Compliance 08/10/2015 ML15224A543
2015-69-01 WECTEC LLC (formerly CB&I Power) Part 21 Report Regarding Deviations of Pipe Spools for AP1000 Projects 02/01/2016 ML16039A256
2015-69-00 CB&I Power Interim Part 21 Report Regarding Deviations of Pipe Spools for V. C. Summer Units 2 & 3 AP1000 Project 09/24/2015 ML15279A183
2015-68-00 Dresden Nuclear Power Station Electromagnetic Relief Valve (EMRV) Cutout Switch 10/07/2015 ML15280A387
2015-67-00 AZZ / Nuclear Logistics, Inc. Electronic Position Controller Failed Internal Component 10/05/2015 ML15280A352
2015-66-00 Westinghouse Electric Company Potentially Affected Coils Used in Freedom Size 1 and Size 2 Starters and Contactors 09/15/2015 ML15259A524
2015-65-01 Emerson Process Management Actuator Fail Mode Deviation and Potential Non-Conservative Actuator 10/30/2015 ML15308A582
2015-65-00 Emerson Process Management Interim Report - Actuator Fail Mode Deviation and Potential Non-Conservative Actuator 09/14/2015 ML15259A526
2015-64-01 SOR Inc. Updated Initial Notification of Potential Issue - Irradiation Qualification Testing 09/21/2015 ML15265A418
2015-64-00 SOR Inc. Initial Notification of Potential Issue - Irradiation Qualification Testing 09/02/2015 ML15251A212
2015-63-01 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B Discovered to have Chloride levels Above Acceptable Limits 07/13/2016 ML16209A050
2015-63-00 Furmanite Nuclear Grade Leak Seal Material FSC-N-1B Discovered to have Chloride levels Above Acceptable Limits 08/25/2015 ML15243A174
2015-62-01 AREVA TN Follow Up Notification of Non-Reportable Condition Regarding NUHOMS® 61 BTH Type 1 Dry Shielded Canister 11/05/2015 ML15317A386
2015-62-00 AREVA Report Regarding Weld Indications Identified on a NUHOMS® 61 BTH Type 1 Dry Shielded Canister 08/14/2015 ML15230A034
2015-61-01 ATC Nuclear Final Report on a Potential Defect on P/N 535-601 Moore Industries Milliamp Modules 10/09/2015 ML15288A199
2015-61-00 ATC Nuclear Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules 08/10/2015 ML15223B263
2015-60-01 Sequoyah Unit 1 Contractor Deviation from Procurement Specifications During Relocation of Reactor Pressure Vessel Material Surveillance Capsules 09/08/2015 ML15254A277
2015-60-00 Sequoyah Damaged Surveillance Capsules 08/07/2015 ML15223B268
2015-59-01 Xcel Energy/Prairie Island Written Notification Related to the Failure of an ABB 50H Instantaneous Over Current Protection Relay 09/03/2015 ML15246A639
2015-59-00 Xcel Energy/Prairie Island ABB 50H Instantaneous Over Current Protection Relay Failure 08/06/2015 ML15223B265
2015-58-00 ABB Inc. Notification of Deviation Regarding HK Circuit Breaker Pivot Pin 08/06/2015 ML15223B264
2015-57-03 Alpha-Omega Services, Inc Final Report of Potential Failure to Comply AOS SAR Document No. FM9054 Revision H. 03/16/2016 EN 51291
2015-57-02 Alpha-Omega Services, Inc Update to the Interim Report of Potential Failure to Comply AOS SAR Document No. FM9054 Revision H 09/02/2015 ML15258A352
2015-57-01 Alpha-Omega Services, Inc Potential Radioactive Material Transport Packaging Shielding Failing to Comply With 10 CFR 71.47 and/or 10 CFR 71.51 08/07/2015 ML15223B267
2015-57-00 Alpha-Omega Services, Inc Potential Radioactive Material Transport Packaging Shielding Failing to Comply With 10 CFR 71.47 and/or 10 CFR 71.51 08/05/2015 ML15224A541
2015-56-00 United Controls International Ferraz Shawmut / Mersen Fuses P/N AJT25 and AJT60 08/04/2015 ML15217A303
2015-55-00 Namco Controls Notification of Product Anomaly Related to Namco EA180 & EA170 Limit Switches Manufactured in a Specific Date Range 07/31/2015 ML15217A309
2015-54-01 Rotork Controls, Inc. Updated Interim Report Related to a Safety Related Micro Switch 09/10/2015 ML15259A522
2015-54-00 Rotork Controls, Inc. Interim Report Related to a Safety Related Micro Switch 07/28/2015 ML15226A452
2015-53-01 CB&I AREVA MOX Services Closure of Interim Report Notification: Flanders Filter Housings 09/09/2015 ML15252A090
2015-53-00 CB&I AREVA MOX Services Interim Report Notification: Flanders Filter Housings 07/23/2015 ML15205A290
2015-52-00 Flowserve Mounting Bracket Seismic Qualification 07/24/2015 ML15211A497
2015-51-00 Flowserve Replacement Actuator Shafts for Anchor/Darling 6-900 Swing Check Valves Do Not Meet Dimensional Requirements 07/24/2015 ML15211A496
2015-50-02 CB&I Power Part 21 Report Regarding a Structural Module Piping Penetration for the Vogtle Unit 3 AP1000 Project 10/29/2015 ML15309A008
2015-50-01 CB&I Power Updated Interim Part 21 Report Regarding a Structural Module Penetration for the Vogtle Unit 3 AP1000 Project 09/02/2015 ML15254A043
2015-50-00 CB&I Power Interim Part 21 Report Regarding a Structural Module Penetration for the Vogtle Unit 3 AP1000 Project 07/01/2015 ML15201A130
2015-49-00 United Controls International Report of Potential Part 21 on Allen Bradley Time Delay Relay 700-RT 07/20/2015 ML15205A293
2015-48-01 CB&I Power Closure of Interim Part 21 Report Regarding Structural Module Penetrations for the Vogtle, Unit 3 AP1000 Project 11/12/2015 ML15331A002
2015-48-00 CB&I Power Interim Part 21 Report Regarding Structural Module Penetrations for the Vogtle, Unit 3 AP1000 Project 06/23/2015 ML15197A022
2015-47-00 CB&I AREVA MOX Services Inadequate Welds Affecting Structural Capacity of Embed Plates 07/15/2015 ML15197A039
2015-46-02 Crane Nuclear, Inc. Final Report: Integral Yoke Pressure Retaining Rings Used in Pressure Seal Valves 09/30/2015 ML15274A064
2015-46-01 Crane Nuclear, Inc. Interim Report: Notification of Pressure Seal Valve Yoke Material Compliance 08/06/2015 ML15223B266
2015-46-00 Crane Nuclear, Inc. Interim Report: Notification of Pressure Seal Valve Yoke Material Compliance 07/08/2015 ML15201A287
2015-45-00 ABB Inc. Notification of Deviation Regarding COM-5 Protective Relay - Defective Frame Assembly 06/29/2015 ML15187A029
2015-44-02 CB&I Power Closure of Updated Interim Part 21 Report Regarding Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project 11/12/2015 ML15331A002
2015-44-01 CB&I Updated Interim Part 21 Report re Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project 06/18/2015 ML15177A080
2015-44-00

CB&I

Interim Part 21 Report re Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project 03/20/2015 ML15180A133
2015-43-01 Electric Power Research Institute (EPRI) Final Report - Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections 07/24/2015 ML15205A289
2015-43-00 Electric Power Research Institute (EPRI) Interim Report - Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections 06/25/2015 ML15188A066
2015-42-00

Summer Units 2 & 3

Quality Assurance Programmatic Issues (a 50.55(e) Initial Notification) 06/16/2015 EN 51158
2015-41-01 GE Hitachi Nuclear Energy Closure of Part 21 60 Day Interim Notification: Potential Failure of Electromatic Relief Valve Cutout Switch 09/10/2015 ML15253A859
2015-41-00 GE Hitachi Nuclear Energy Part 21 60 Day Interim Notification: Potential Failure of Electromatic Relief Valve Cutout Switch 06/17/2015 ML15169A006
2015-40-01 CB&I Power Closure of Interim Part 21 Report Regarding Deviations of Rebar for Vogtle Unit 3 AP1000 Project 11/12/2015 ML15331A002
2015-40-00 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Rebar for Vogtle Unit 3 AP1000 Project 05/28/2015 ML15159B265
2015-39-01 Thermo Fisher Scientific Potential Noncompliance of a Dual Uncompensated Ion Chamber Power Range Detector 07/01/2015 ML15187A031
2015-39-00 Thermo Fisher Scientific Potential Noncompliance of a Dual Uncompensated Ion Chamber Power Range Detector 06/05/2015 ML15162A027
2015-38-00 Engine Systems, Inc. Incorrect Part Number Relay Shipped to and Installed in EDG Governor Control Panel at Brunswick Nuclear Plant 06/05/2015 ML15162A023
2015-37-01 CB&I Power Closure of Interim Report Regarding Deviations of Welded Stud Anchors for Vogtle 3 & 4 and V.C. Summer 2 & 3, AP1000 Projects 11/12/2015 ML15331A002
2015-37-00 Chicago Bridge & Iron Interim Report Regardng Deviations of Welded Stud Anchors for Vogtle 3 & 4 and V.C. Summer 2 & 3, AP1000 Projects 05/28/2015 ML15159A312
2015-36-00 Nutherm International, Inc.

Report of Potential Part 21 Related to Allen Bradley Time Relay Model 700RTC (See related Part 21 Nos. 2015-33-00 and 2015-26-00).

06/04/2015 ML15161A230
2015-35-00 ABB Inc. Part 21 Notification of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch 06/01/2015 ML15155A579
2015-34-01 C&D Technologies, Inc. Retraction of Interim Report Related to Possible Cracking in KCR-13 Standby Battery Jars 10/23/2017 ML17311A906
2015-34-00 C&D Technologies, Inc. Interim Report Related to Possible Cracking in KCR-13 Standby Battery Jars 05/29/2015 ML15155A575
2015-33-01 Brunswick Written Part 21 Notification Related to Allen Bradley 700RTC Relay Configuration (See related Part 21 No.'s. 2015-26-00 and 2015-36-00). 06/25/2015 ML15196A034
2015-33-00 Brunswick Part 21 Related to Allen Bradley 700RTC Relay Configuration (See related Part 21 No. 2015-26-00). 05/28/2015 ML15155A577
2015-32-01 CB&I Power Closure of Interim Part 21 Report Regarding Deviations of Embedments for Vogtle Unit 3 AP1000 Project 11/12/2015 ML15331A002
2015-32-00 CB&I Nuclear Interim Part 21 Report Regarding Deviations of Embedments for Vogtle Unit 3 AP1000 Project 05/14/2015 ML15146A094
2015-31-01 AECOM Inc 30 Day Report Regarding Deviations While Utilizing Bentley Software STAAD.PRO on Supplied Calculations 06/17/2015 ML15168B075
2015-31-00 AECOM Inc Interim Part 21 Regarding Deviations While Utilizing Bentley Software STAAD.PRO on Safety Related Calculations 05/18/2015 ML15147A547
2015-30-01

Chicago Bridge & Iron

Closure of Interim Part 21 Report Related to Measuring and Test Equipment Deficiencies for V.C. Summer Units 2 & 3 and Vogtle Units 3 & 4 AP1000 Projects 06/26/2015 ML15188A067
2015-30-00

Chicago Bridge & Iron

Interim Part 21 Report Related to Measuring and Test Equipment Deficiencies for V.C. Summer Units 2 & 3 and Vogtle Units 3 & 4 AP1000 Projects 05/17/2015 ML15147A512
2015-29-03 CB&I Laurens Closure of Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects 09/25/2015 ML15279A182
2015-29-02 CB&I Laurens Updated Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects 07/25/2015 ML15217A437
2015-29-01 CB&I Laurens Updated Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects 06/26/2015 ML15188A070
2015-29-00 CB&I Laurens Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects 04/25/2015 ML15132A334
2015-28-00 BNL Industries, Inc. Defect Identified in 6 inch Gear Operated Ball Valves 05/11/2015 ML15140A218
2015-27-00 QualTech NP Potential Part 21 Involving Struthers Dunn Relays With Contact Resistance Greater Than One Ohm 05/07/2015 ML15134A018
2015-26-04 AZZ/Nuclear Logistics Inc. Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Updated) 08/26/2016 ML16243A474
2015-26-03 AZZ/Nuclear Logistics Inc. Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC 08/15/2016 ML16238A186
2015-26-02 AZZ/Nuclear Logistics Inc. Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays 05/26/2016 ML16154A207
2015-26-01 AZZ / Nuclear Logistics Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Update) 04/08/2016 ML16109A177
2015-26-00 AZZ / Nuclear Logistics Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays 05/01/2015 ML15134A016
2015-25-01 CB&I Power Closure of Interim Report Regarding Structural Module Penetrations For V.C. Summer Unit 3 and Vogtle Unit 4 AP1000 Projects 11/12/2015 ML15331A002
2015-25-00 CB&I Nuclear Interim Report Regarding Structural Module Penetrations For V.C. Summer Unit 3 and Vogtle Unit 4 AP1000 Project 04/24/2015 ML15121A186
2015-24-00 CB&I AREVA MOX Services 60-Day Interim Report Notification: SMCI Embed Plates 04/21/2015 ML15112A131
2015-23-01 CB&I Nuclear Closure of Interim Report Regarding Core Drilling Operations for V.C.Summer Units 2 & 3 AP1000 Project (See related 50.55(e) Report No. 2015-0042-00) 06/16/2015 EN 51158
2015-23-00 CB&I Nuclear Interim Report Regarding Core Drilling Operations for V.C.Summer Units 2 & 3 AP1000 Project 04/16/2015 ML15117A100
2015-22-01 CB&I Nuclear Closure of Interim 10 CFR Part 21 Report Regarding Rebar Deviations For Vogtle Unit 3 AP1000 06/09/2015 ML15173A096
2015-22-00 CB&I Nuclear Interim 10 CFR Part 21 Report Regarding Rebar Deviations For Vogtle Unit 3 AP1000 Project 03/27/2015 ML15097A043
2015-21-01 CB&I Nuclear Closure of Interim Part 21 Report Regarding CA01 Submodule Deviations For Vogtle Unit 3 AP1000 Project 06/09/2015 ML15173A096
2015-21-00 CB&I Nuclear Interim Part 21 Report Regarding CA01 Submodule Deviations For Vogtle Unit 3 AP1000 Project 03/27/2015 ML15097A042
2015-20-01 United Controls International Follow Up to Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module 03/22/2016 ML16098A445
2015-20-00 United Controls International Interim Report - Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module 03/27/2015 ML15089A435
2015-19-00 Emerson Process Management Fisher Type 461 Valve Plug Machining Defect 03/20/2015 ML15089A436
2015-18-03 Curtiss-Wright Flow Control Corp. Update to Notification of a Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves 02/03/2017 ML17039A569
2015-18-02 Curtiss-Wright Flow Control Corp. Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve 06/30/2015 ML15187A172
2015-18-01 Curtiss-Wright Flow Control Corp. Updated Interim Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve 05/01/2015 ML15134A017
2015-18-00 Curtiss-Wright Flow Control Corp. Interim Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve 03/16/2015 ML15077A422
2015-17-00 Weir Valves & Controls USA Inc. Improper Weld Used on Replacement Gate Valve Cover 03/13/2015 ML15077A379
2015-16-00 CB&I Nuclear Interim Report Regarding Overlay Plate Mechanical Coupler Welds for V.C. Summer Unit 2 AP1000 Project 02/10/2015 ML15065A255
2015-15-03 CB&I Power Closure of Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project 11/12/2015 ML15331A002
2015-15-02 CB&I Nuclear

Updated Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project

05/19/2015 ML15148A573
2015-15-01 CB&I Nuclear

Updated Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project

03/25/2015 ML15092A163
2015-15-00 CB&I Nuclear Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project 02/19/2015 ML15062A595
2015-14-01 Dominion Power Connecticut (Millstone Unit 3) Written Notification Related to Binding in ABB K-Line Secondary Closing Latches (Part Number 716610K01) 03/13/2015 ML15079A398
2015-14-00 Dominion Power Connecticut Defect in ABB K-Line Breaker Replacement (New) Secondary Close Latches 02/25/2015 ML15058A717
2015-13-01 QualTech NP Closure of Potential Defect in a Socket Used Separately on in a Connector Kit 11/23/2015 ML15341A327
2015-13-00 QualTech NP Potential Defect in a Socket Used Separately on in a Connector Kit 02/23/2015 ML15058A716
2015-12-02 CB&I Nuclear Closure of Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project 06/09/2015 ML15173A096
2015-12-01 CB&I Nuclear Updated Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project 03/30/2015 ML15099A504
2015-12-00 CB&I Nuclear Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project 01/29/2015 ML15043A187
2015-11-01 CB&I Nuclear Closure of Interim Report Regarding Submodule CA01-13 Nonconformances for V.C. Summer Unit 2 AP1000 Project 06/09/2015 ML15173A096
2015-11-00 CB&I Nuclear Interim Report Regarding Submodule CA01-13 Nonconformances for V.C. Summer Unit 2 AP1000 Project 01/22/2015 ML15043A189
2015-10-04 CB&I Power Closure of Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project 11/12/2015 ML15331A002
2015-10-03 CB&I Nuclear Third Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project. 08/27/2015 ML15251A211
2015-10-02 CB&I Nuclear Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project 06/30/2015 ML15190A329
2015-10-01 CB&I Nuclear Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project 03/20/2015 ML15091A345
2015-10-00 CB&I Nuclear Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project 01/20/2015 ML15043A188
2015-09-00 Summer Units 2 & 3 Significant Breakdown in the Quality Assurance (QA) Program of an Agent of the Licensee (a 10CFR 50.55(e) Report) 02/12/2015 ML15054A012
2015-08-00 Weir Valves and Controls, USA TRICENTRIC(r) Triple Offset Valve Spline Adapter Vibrated Loose 02/10/2015 ML15049A456
2015-07-00 Valcor Engineering Corporation Possible NEMA 4 Enclosure Assembly Error In Some Solenoid Valve Models 02/09/2015 ML15049A457
2015-06-01 Vogtle Units 3 & 4 A Breakdown in the Quality Assurance Program for Vogtle 3 & 4 Construction Program (a10 CFR 50.55(e) Written Report) 02/23/2015 ML15055A525
2015-06-00 Vogtle Units 3 & 4 Breakdown in the Quality Assurance Program for Vogtle 3 & 4 Construction Project (a10 CFR 50.55(e) Report) 02/09/2015 EN 50798
2015-05-00 Thermo Gamma-Metrics LLC Shutdown Margin Monitor Environmental Qualification Noncompliance 02/06/2015 ML15049A458
2015-04-00 Operation Technology, Inc. / ETAP Error Report Related to ETAP Power System Analysis Software 02/03/2015 EN 50784
2015-03-01 CB&I Nuclear Closure of Interim Report Regarding Submodule CA01-15 Nonconformances for V.C. Summer Unit 2 AP1000 Project 06/09/2015 ML15173A096
2015-03-00 CB&I Nuclear Interim Report Regarding Submodule CA01-15 Nonconformances for V.C. Summer Unit 2 AP1000 Project 01/09/2015 ML15029A542
2015-02-01 CB&I Nuclear Closure of Interim Report Regarding Trends in Welding and Documentation Issues for Vogtle Units 3 and 4 AP1000 Project 06/09/2015 ML15173A096
2015-02-00 CB&I Nuclear Interim Report Regarding Trends in Welding and Documentation Issues for Vogtle Units 3 and 4 AP1000 Project. 01/08/2015 ML15022A200
2015-01-00 AZZ / Nuclear Logistics Inc. Report of Potential Failure of GE Hitachi (GEH) SBM Type Switches. 01/08/2015 ML15014A061