Part 21 Reports - 2015
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Log No | Notifier | Description | Report Date | Event No. / Accession No. |
---|---|---|---|---|
2015-88-03 | CB&I AREVA MOX Services | Closure of Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication | 10/25/2016 | ML16299A386 |
2015-88-02 | CB&I AREVA MOX Services | Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication | 07/26/2016 | ML16208A315 |
2015-88-01 | CB&I AREVA MOX Services | Updated Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication | 04/26/2016 | ML16118A372 |
2015-88-00 | CB&I AREVA MOX Services | Interim Report Related to Vendor Application of Standard Welding Procedure Specifications during Glove Box Fabrication | 12/16/2015 | ML15351A054 |
2015-87-03 | Homewood Products Corporation | Final Report on Part 21 Issue with Irradiations Performed by Steris Isomedix Services | 05/13/2016 | ML16145A069 |
2015-87-02 | Homewood Products Corporation | Part 21 Issue on Irradiations Performed by Steris Isomedix Services (Updated) | 03/22/2016 | ML16102A078 |
2015-87-01 | Homewood Products Corporation | Part 21 Issue on Irradiations performed by Steris Isomedix Services | 01/08/2016 | ML16012A502 |
2015-87-00 | Homewood Products Corporation | Part 21 Issue on Irradiations performed by Steris Isomedix Services (based upon information provided by National Technical Systems) | 12/21/2015 | ML16004A029 |
2015-86-02 | WECTEC LLC (formerly CB&I Power) | Updated Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects | 03/09/2016 | ML16076A263 |
2015-86-01 | WECTEC LLC (formerly CB&I Power) | Part 21 Report Regarding Deviations of Piping Penetration Sleeves for AP1000 Projects | 02/03/2016 | ML16039A257 |
2015-86-00 | CB&I | Interim Report Regarding Wall Penetration Corrosion for Vogtle Unit 4 and V.C. Summer Unit 3 AP1000 Projects | 12/08/2015 | ML16014A712 |
2015-85-00 | Three Mile Island Unit 1 | Part 21 Notification Due To Breaker Defect | 12/28/2015 | ML15363A009 |
2015-84-01 | WECTEC LLC (Former CB&I) | Closure of Interim Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle Unit 3 AP1000 Project | 07/05/2016 | ML16197A150 |
2015-84-00 | CB&I | Interim Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle Unit 3 AP1000 Project | 12/10/2015 | ML15357A004 |
2015-83-00 | MPR Associates, Inc. | Replacement EDG Timing Module Failure at Hatch Nuclear Plant | 12/23/2015 | ML16004A030 |
2015-82-00 | Nutherm International, Inc. | Potential Part 21 Report Involving Moore Industries RTD Transmitter | 12/18/2015 | ML15357A041 |
2015-81-00 | Curtiss-Wright QualTech NP | Eaton/Cutler Hammer A200 series Starters and Contactors | 12/18/2015 | ML15357A042 |
2015-80-00 | Howden North America, Inc. | Two Fan Motors Were Not Properly Prepared before Small Steel Shot Blasting | 12/08/2015 | ML15345A390 |
2015-79-00 | United Controls International | Improper Silver Plating During Refurbishment of AK-25 Type Circuit Breakers | 12/01/2015 | ML15341A328 |
2015-78-02 | WECTEC LLC (formerly CB&I Power) | Closure of Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project | 07/05/2016 | ML16197A150 |
2015-78-01 | WECTEC LLC (formerly CB&I Power) | Updated Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project | 01/21/2016 | ML16053A285 |
2015-78-00 | CB&I Power | Interim Part 21 Report Regarding Passive Core Cooling System Pipe Supports for the Vogtle Unit 3 AP1000 Project | 11/12/2015 | ML15331A003 |
2015-77-00 | CB&I Power | Closure of Interim Report Regarding Deviations of Packing Material for Stainless Steel Pipe Spools for Vogtle 3 & 4 and V. C. Summer Units 2 & 3 AP1000 Projects | 11/12/2015 | ML15331A002 |
2015-76-01 | WECTEC LLC (Former CB&I) | Closure of Interim Part 21 Report Regarding Nonconforming Rebar Cross-Ties for V. C. Summer Unit 3 AP1000 Project | 07/05/2016 | ML16197A150 |
2015-76-00 | CB&I | Interim Part 21 Report Regarding Nonconforming Rebar Cross-Ties for V. C. Summer Unit 3 AP1000 Project | 10/29/2015 | ML15324A107 |
2015-75-06 | WECTEC LLC | Closure of Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 | 12/19/2016 | ML17013A024 |
2015-75-05 | WECTEC LLC | Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 | 10/20/2016 | ML16302A014 |
2015-75-04 | WECTEC LLC | Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 | 08/30/2016 | ML16252A321 |
2015-75-03 | WECTEC LLC | Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 | 06/27/2016 | ML16197A151 |
2015-75-02 | WECTEC LLC | Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 | 04/12/2016 | ML16110A262 |
2015-75-01 | WECTEC LLC (formerly CB&I Power) | Updated Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 | 01/21/2016 | ML16053A286 |
2015-75-00 | CB&I | Interim Part 21 Report Regarding Nondestructive Examination of Weldable Couplers for Vogtle 3 & 4 and Summer 2 & 3 | 10/29/2015 | ML15313A496 |
2015-74-00 | Crane Nuclear, Inc. | Notification of Pressure Seal Valve Segment Ring Material Compliance | 10/23/2015 | ML15303A014 |
2015-73-00 | Engine Systems, Inc. | Emergency Diesel Generator Speed Switch Capacitor Failure | 10/23/2015 | ML15314A031 |
2015-72-01 | Emerson Process Management | Safety Related TopWorx Switch Misalignment (Updated) | 11/05/2015 | ML16258A456 |
2015-72-00 | Emerson Process Management | Safety Related TopWorx Switch Misalignment | 10/23/2015 | ML15303A006 |
2015-71-01 | Waterford 3 | Westinghouse Type KIR-60 Current Transformer (Both Emergency Diesel Generators Declared Inoperable - a 50.73 report Supplement) | 12/06/2016 | ML16341C141 |
2015-71-00 | Waterford 3 | Westinghouse Type KIR-60 Current Transformer (Both Emergency Diesel Generators Declared Inoperable - a 50.73 report) | 10/23/2015 | ML15303A004 |
2015-70-01 | Crane Nuclear, Inc. | Final Report: Pressure Retaining Rings Used in Pressure Seal Valves | 09/30/2015 | ML15274A062 |
2015-70-00 | Crane Nuclear, Inc. | Interim Report: Notification of Retaining Ring Material Compliance | 08/10/2015 | ML15224A543 |
2015-69-01 | WECTEC LLC (formerly CB&I Power) | Part 21 Report Regarding Deviations of Pipe Spools for AP1000 Projects | 02/01/2016 | ML16039A256 |
2015-69-00 | CB&I Power | Interim Part 21 Report Regarding Deviations of Pipe Spools for V. C. Summer Units 2 & 3 AP1000 Project | 09/24/2015 | ML15279A183 |
2015-68-00 | Dresden Nuclear Power Station | Electromagnetic Relief Valve (EMRV) Cutout Switch | 10/07/2015 | ML15280A387 |
2015-67-00 | AZZ / Nuclear Logistics, Inc. | Electronic Position Controller Failed Internal Component | 10/05/2015 | ML15280A352 |
2015-66-00 | Westinghouse Electric Company | Potentially Affected Coils Used in Freedom Size 1 and Size 2 Starters and Contactors | 09/15/2015 | ML15259A524 |
2015-65-01 | Emerson Process Management | Actuator Fail Mode Deviation and Potential Non-Conservative Actuator | 10/30/2015 | ML15308A582 |
2015-65-00 | Emerson Process Management | Interim Report - Actuator Fail Mode Deviation and Potential Non-Conservative Actuator | 09/14/2015 | ML15259A526 |
2015-64-01 | SOR Inc. | Updated Initial Notification of Potential Issue - Irradiation Qualification Testing | 09/21/2015 | ML15265A418 |
2015-64-00 | SOR Inc. | Initial Notification of Potential Issue - Irradiation Qualification Testing | 09/02/2015 | ML15251A212 |
2015-63-01 | Furmanite | Nuclear Grade Leak Seal Material FSC-N-1B Discovered to have Chloride levels Above Acceptable Limits | 07/13/2016 | ML16209A050 |
2015-63-00 | Furmanite | Nuclear Grade Leak Seal Material FSC-N-1B Discovered to have Chloride levels Above Acceptable Limits | 08/25/2015 | ML15243A174 |
2015-62-01 | AREVA TN | Follow Up Notification of Non-Reportable Condition Regarding NUHOMS® 61 BTH Type 1 Dry Shielded Canister | 11/05/2015 | ML15317A386 |
2015-62-00 | AREVA | Report Regarding Weld Indications Identified on a NUHOMS® 61 BTH Type 1 Dry Shielded Canister | 08/14/2015 | ML15230A034 |
2015-61-01 | ATC Nuclear | Final Report on a Potential Defect on P/N 535-601 Moore Industries Milliamp Modules | 10/09/2015 | ML15288A199 |
2015-61-00 | ATC Nuclear | Interim Report - Potential Defect on P/N 535-601 Moore Industries Milliamp Modules | 08/10/2015 | ML15223B263 |
2015-60-01 | Sequoyah Unit 1 | Contractor Deviation from Procurement Specifications During Relocation of Reactor Pressure Vessel Material Surveillance Capsules | 09/08/2015 | ML15254A277 |
2015-60-00 | Sequoyah | Damaged Surveillance Capsules | 08/07/2015 | ML15223B268 |
2015-59-01 | Xcel Energy/Prairie Island | Written Notification Related to the Failure of an ABB 50H Instantaneous Over Current Protection Relay | 09/03/2015 | ML15246A639 |
2015-59-00 | Xcel Energy/Prairie Island | ABB 50H Instantaneous Over Current Protection Relay Failure | 08/06/2015 | ML15223B265 |
2015-58-00 | ABB Inc. | Notification of Deviation Regarding HK Circuit Breaker Pivot Pin | 08/06/2015 | ML15223B264 |
2015-57-03 | Alpha-Omega Services, Inc | Final Report of Potential Failure to Comply AOS SAR Document No. FM9054 Revision H. | 03/16/2016 | EN 51291 |
2015-57-02 | Alpha-Omega Services, Inc | Update to the Interim Report of Potential Failure to Comply AOS SAR Document No. FM9054 Revision H | 09/02/2015 | ML15258A352 |
2015-57-01 | Alpha-Omega Services, Inc | Potential Radioactive Material Transport Packaging Shielding Failing to Comply With 10 CFR 71.47 and/or 10 CFR 71.51 | 08/07/2015 | ML15223B267 |
2015-57-00 | Alpha-Omega Services, Inc | Potential Radioactive Material Transport Packaging Shielding Failing to Comply With 10 CFR 71.47 and/or 10 CFR 71.51 | 08/05/2015 | ML15224A541 |
2015-56-00 | United Controls International | Ferraz Shawmut / Mersen Fuses P/N AJT25 and AJT60 | 08/04/2015 | ML15217A303 |
2015-55-00 | Namco Controls | Notification of Product Anomaly Related to Namco EA180 & EA170 Limit Switches Manufactured in a Specific Date Range | 07/31/2015 | ML15217A309 |
2015-54-01 | Rotork Controls, Inc. | Updated Interim Report Related to a Safety Related Micro Switch | 09/10/2015 | ML15259A522 |
2015-54-00 | Rotork Controls, Inc. | Interim Report Related to a Safety Related Micro Switch | 07/28/2015 | ML15226A452 |
2015-53-01 | CB&I AREVA MOX Services | Closure of Interim Report Notification: Flanders Filter Housings | 09/09/2015 | ML15252A090 |
2015-53-00 | CB&I AREVA MOX Services | Interim Report Notification: Flanders Filter Housings | 07/23/2015 | ML15205A290 |
2015-52-00 | Flowserve | Mounting Bracket Seismic Qualification | 07/24/2015 | ML15211A497 |
2015-51-00 | Flowserve | Replacement Actuator Shafts for Anchor/Darling 6-900 Swing Check Valves Do Not Meet Dimensional Requirements | 07/24/2015 | ML15211A496 |
2015-50-02 | CB&I Power | Part 21 Report Regarding a Structural Module Piping Penetration for the Vogtle Unit 3 AP1000 Project | 10/29/2015 | ML15309A008 |
2015-50-01 | CB&I Power | Updated Interim Part 21 Report Regarding a Structural Module Penetration for the Vogtle Unit 3 AP1000 Project | 09/02/2015 | ML15254A043 |
2015-50-00 | CB&I Power | Interim Part 21 Report Regarding a Structural Module Penetration for the Vogtle Unit 3 AP1000 Project | 07/01/2015 | ML15201A130 |
2015-49-00 | United Controls International | Report of Potential Part 21 on Allen Bradley Time Delay Relay 700-RT | 07/20/2015 | ML15205A293 |
2015-48-01 | CB&I Power | Closure of Interim Part 21 Report Regarding Structural Module Penetrations for the Vogtle, Unit 3 AP1000 Project | 11/12/2015 | ML15331A002 |
2015-48-00 | CB&I Power | Interim Part 21 Report Regarding Structural Module Penetrations for the Vogtle, Unit 3 AP1000 Project | 06/23/2015 | ML15197A022 |
2015-47-00 | CB&I AREVA MOX Services | Inadequate Welds Affecting Structural Capacity of Embed Plates | 07/15/2015 | ML15197A039 |
2015-46-02 | Crane Nuclear, Inc. | Final Report: Integral Yoke Pressure Retaining Rings Used in Pressure Seal Valves | 09/30/2015 | ML15274A064 |
2015-46-01 | Crane Nuclear, Inc. | Interim Report: Notification of Pressure Seal Valve Yoke Material Compliance | 08/06/2015 | ML15223B266 |
2015-46-00 | Crane Nuclear, Inc. | Interim Report: Notification of Pressure Seal Valve Yoke Material Compliance | 07/08/2015 | ML15201A287 |
2015-45-00 | ABB Inc. | Notification of Deviation Regarding COM-5 Protective Relay - Defective Frame Assembly | 06/29/2015 | ML15187A029 |
2015-44-02 | CB&I Power | Closure of Updated Interim Part 21 Report Regarding Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project | 11/12/2015 | ML15331A002 |
2015-44-01 | CB&I | Updated Interim Part 21 Report re Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project | 06/18/2015 | ML15177A080 |
2015-44-00 |
CB&I |
Interim Part 21 Report re Non-Conforming Structural Components for V.C. Summer Units 2 and 3 AP1000 Project | 03/20/2015 | ML15180A133 |
2015-43-01 | Electric Power Research Institute (EPRI) | Final Report - Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections | 07/24/2015 | ML15205A289 |
2015-43-00 | Electric Power Research Institute (EPRI) | Interim Report - Westinghouse Pressurizer Head Nozzle Inner Corner Region Ultrasonic Inspections | 06/25/2015 | ML15188A066 |
2015-42-00 |
Summer Units 2 & 3 |
Quality Assurance Programmatic Issues (a 50.55(e) Initial Notification) | 06/16/2015 | EN 51158 |
2015-41-01 | GE Hitachi Nuclear Energy | Closure of Part 21 60 Day Interim Notification: Potential Failure of Electromatic Relief Valve Cutout Switch | 09/10/2015 | ML15253A859 |
2015-41-00 | GE Hitachi Nuclear Energy | Part 21 60 Day Interim Notification: Potential Failure of Electromatic Relief Valve Cutout Switch | 06/17/2015 | ML15169A006 |
2015-40-01 | CB&I Power | Closure of Interim Part 21 Report Regarding Deviations of Rebar for Vogtle Unit 3 AP1000 Project | 11/12/2015 | ML15331A002 |
2015-40-00 | CB&I Nuclear | Interim Part 21 Report Regarding Deviations of Rebar for Vogtle Unit 3 AP1000 Project | 05/28/2015 | ML15159B265 |
2015-39-01 | Thermo Fisher Scientific | Potential Noncompliance of a Dual Uncompensated Ion Chamber Power Range Detector | 07/01/2015 | ML15187A031 |
2015-39-00 | Thermo Fisher Scientific | Potential Noncompliance of a Dual Uncompensated Ion Chamber Power Range Detector | 06/05/2015 | ML15162A027 |
2015-38-00 | Engine Systems, Inc. | Incorrect Part Number Relay Shipped to and Installed in EDG Governor Control Panel at Brunswick Nuclear Plant | 06/05/2015 | ML15162A023 |
2015-37-01 | CB&I Power | Closure of Interim Report Regarding Deviations of Welded Stud Anchors for Vogtle 3 & 4 and V.C. Summer 2 & 3, AP1000 Projects | 11/12/2015 | ML15331A002 |
2015-37-00 | Chicago Bridge & Iron | Interim Report Regardng Deviations of Welded Stud Anchors for Vogtle 3 & 4 and V.C. Summer 2 & 3, AP1000 Projects | 05/28/2015 | ML15159A312 |
2015-36-00 | Nutherm International, Inc. |
Report of Potential Part 21 Related to Allen Bradley Time Relay Model 700RTC (See related Part 21 Nos. 2015-33-00 and 2015-26-00). |
06/04/2015 | ML15161A230 |
2015-35-00 | ABB Inc. | Part 21 Notification of Deviation Regarding K-Line Circuit Breaker Secondary Close Latch | 06/01/2015 | ML15155A579 |
2015-34-01 | C&D Technologies, Inc. | Retraction of Interim Report Related to Possible Cracking in KCR-13 Standby Battery Jars | 10/23/2017 | ML17311A906 |
2015-34-00 | C&D Technologies, Inc. | Interim Report Related to Possible Cracking in KCR-13 Standby Battery Jars | 05/29/2015 | ML15155A575 |
2015-33-01 | Brunswick | Written Part 21 Notification Related to Allen Bradley 700RTC Relay Configuration (See related Part 21 No.'s. 2015-26-00 and 2015-36-00). | 06/25/2015 | ML15196A034 |
2015-33-00 | Brunswick | Part 21 Related to Allen Bradley 700RTC Relay Configuration (See related Part 21 No. 2015-26-00). | 05/28/2015 | ML15155A577 |
2015-32-01 | CB&I Power | Closure of Interim Part 21 Report Regarding Deviations of Embedments for Vogtle Unit 3 AP1000 Project | 11/12/2015 | ML15331A002 |
2015-32-00 | CB&I Nuclear | Interim Part 21 Report Regarding Deviations of Embedments for Vogtle Unit 3 AP1000 Project | 05/14/2015 | ML15146A094 |
2015-31-01 | AECOM Inc | 30 Day Report Regarding Deviations While Utilizing Bentley Software STAAD.PRO on Supplied Calculations | 06/17/2015 | ML15168B075 |
2015-31-00 | AECOM Inc | Interim Part 21 Regarding Deviations While Utilizing Bentley Software STAAD.PRO on Safety Related Calculations | 05/18/2015 | ML15147A547 |
2015-30-01 |
Chicago Bridge & Iron |
Closure of Interim Part 21 Report Related to Measuring and Test Equipment Deficiencies for V.C. Summer Units 2 & 3 and Vogtle Units 3 & 4 AP1000 Projects | 06/26/2015 | ML15188A067 |
2015-30-00 |
Chicago Bridge & Iron |
Interim Part 21 Report Related to Measuring and Test Equipment Deficiencies for V.C. Summer Units 2 & 3 and Vogtle Units 3 & 4 AP1000 Projects | 05/17/2015 | ML15147A512 |
2015-29-03 | CB&I Laurens | Closure of Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects | 09/25/2015 | ML15279A182 |
2015-29-02 | CB&I Laurens | Updated Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects | 07/25/2015 | ML15217A437 |
2015-29-01 | CB&I Laurens | Updated Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects | 06/26/2015 | ML15188A070 |
2015-29-00 | CB&I Laurens | Interim Report Regarding One Inch Schedule 80A312 Stainless Steel, Class 2 and Class 3 Seamless Pipe for AP1000 Nuclear Projects | 04/25/2015 | ML15132A334 |
2015-28-00 | BNL Industries, Inc. | Defect Identified in 6 inch Gear Operated Ball Valves | 05/11/2015 | ML15140A218 |
2015-27-00 | QualTech NP | Potential Part 21 Involving Struthers Dunn Relays With Contact Resistance Greater Than One Ohm | 05/07/2015 | ML15134A018 |
2015-26-04 | AZZ/Nuclear Logistics Inc. | Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Updated) | 08/26/2016 | ML16243A474 |
2015-26-03 | AZZ/Nuclear Logistics Inc. | Report of potential 10 CFR Part 21, Allen Bradley Timing Relay Model 700RTC | 08/15/2016 | ML16238A186 |
2015-26-02 | AZZ/Nuclear Logistics Inc. | Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays | 05/26/2016 | ML16154A207 |
2015-26-01 | AZZ / Nuclear Logistics | Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays (Update) | 04/08/2016 | ML16109A177 |
2015-26-00 | AZZ / Nuclear Logistics | Potentially Unqualified Component in Certain Allen Bradley Model 700RTC Timing Relays | 05/01/2015 | ML15134A016 |
2015-25-01 | CB&I Power | Closure of Interim Report Regarding Structural Module Penetrations For V.C. Summer Unit 3 and Vogtle Unit 4 AP1000 Projects | 11/12/2015 | ML15331A002 |
2015-25-00 | CB&I Nuclear | Interim Report Regarding Structural Module Penetrations For V.C. Summer Unit 3 and Vogtle Unit 4 AP1000 Project | 04/24/2015 | ML15121A186 |
2015-24-00 | CB&I AREVA MOX Services | 60-Day Interim Report Notification: SMCI Embed Plates | 04/21/2015 | ML15112A131 |
2015-23-01 | CB&I Nuclear | Closure of Interim Report Regarding Core Drilling Operations for V.C.Summer Units 2 & 3 AP1000 Project (See related 50.55(e) Report No. 2015-0042-00) | 06/16/2015 | EN 51158 |
2015-23-00 | CB&I Nuclear | Interim Report Regarding Core Drilling Operations for V.C.Summer Units 2 & 3 AP1000 Project | 04/16/2015 | ML15117A100 |
2015-22-01 | CB&I Nuclear | Closure of Interim 10 CFR Part 21 Report Regarding Rebar Deviations For Vogtle Unit 3 AP1000 | 06/09/2015 | ML15173A096 |
2015-22-00 | CB&I Nuclear | Interim 10 CFR Part 21 Report Regarding Rebar Deviations For Vogtle Unit 3 AP1000 Project | 03/27/2015 | ML15097A043 |
2015-21-01 | CB&I Nuclear | Closure of Interim Part 21 Report Regarding CA01 Submodule Deviations For Vogtle Unit 3 AP1000 Project | 06/09/2015 | ML15173A096 |
2015-21-00 | CB&I Nuclear | Interim Part 21 Report Regarding CA01 Submodule Deviations For Vogtle Unit 3 AP1000 Project | 03/27/2015 | ML15097A042 |
2015-20-01 | United Controls International | Follow Up to Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module | 03/22/2016 | ML16098A445 |
2015-20-00 | United Controls International | Interim Report - Resistive Short Identified on Thomas & Betts Power Solutions/Cyberex Sense & Transfer Module | 03/27/2015 | ML15089A435 |
2015-19-00 | Emerson Process Management | Fisher Type 461 Valve Plug Machining Defect | 03/20/2015 | ML15089A436 |
2015-18-03 | Curtiss-Wright Flow Control Corp. | Update to Notification of a Defect, Potential for Test Induced Damage 0867F Series Main Steam Safety Relief Valves | 02/03/2017 | ML17039A569 |
2015-18-02 | Curtiss-Wright Flow Control Corp. | Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve | 06/30/2015 | ML15187A172 |
2015-18-01 | Curtiss-Wright Flow Control Corp. | Updated Interim Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve | 05/01/2015 | ML15134A017 |
2015-18-00 | Curtiss-Wright Flow Control Corp. | Interim Notification of a Potential Test Induced Defect in a 0867F Series Main Steam Safety Relief Valve | 03/16/2015 | ML15077A422 |
2015-17-00 | Weir Valves & Controls USA Inc. | Improper Weld Used on Replacement Gate Valve Cover | 03/13/2015 | ML15077A379 |
2015-16-00 | CB&I Nuclear | Interim Report Regarding Overlay Plate Mechanical Coupler Welds for V.C. Summer Unit 2 AP1000 Project | 02/10/2015 | ML15065A255 |
2015-15-03 | CB&I Power | Closure of Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project | 11/12/2015 | ML15331A002 |
2015-15-02 | CB&I Nuclear |
Updated Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project |
05/19/2015 | ML15148A573 |
2015-15-01 | CB&I Nuclear |
Updated Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project |
03/25/2015 | ML15092A163 |
2015-15-00 | CB&I Nuclear | Interim Report Regarding Submodule CA01-38 Deviations for Vogtle Unit 3 AP1000 Project | 02/19/2015 | ML15062A595 |
2015-14-01 | Dominion Power Connecticut (Millstone Unit 3) | Written Notification Related to Binding in ABB K-Line Secondary Closing Latches (Part Number 716610K01) | 03/13/2015 | ML15079A398 |
2015-14-00 | Dominion Power Connecticut | Defect in ABB K-Line Breaker Replacement (New) Secondary Close Latches | 02/25/2015 | ML15058A717 |
2015-13-01 | QualTech NP | Closure of Potential Defect in a Socket Used Separately on in a Connector Kit | 11/23/2015 | ML15341A327 |
2015-13-00 | QualTech NP | Potential Defect in a Socket Used Separately on in a Connector Kit | 02/23/2015 | ML15058A716 |
2015-12-02 | CB&I Nuclear | Closure of Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project | 06/09/2015 | ML15173A096 |
2015-12-01 | CB&I Nuclear | Updated Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project | 03/30/2015 | ML15099A504 |
2015-12-00 | CB&I Nuclear | Interim Report Regarding Nonconformances on CA01 Submodules for V.C. Summer Unit 2 AP1000 Project | 01/29/2015 | ML15043A187 |
2015-11-01 | CB&I Nuclear | Closure of Interim Report Regarding Submodule CA01-13 Nonconformances for V.C. Summer Unit 2 AP1000 Project | 06/09/2015 | ML15173A096 |
2015-11-00 | CB&I Nuclear | Interim Report Regarding Submodule CA01-13 Nonconformances for V.C. Summer Unit 2 AP1000 Project | 01/22/2015 | ML15043A189 |
2015-10-04 | CB&I Power | Closure of Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project | 11/12/2015 | ML15331A002 |
2015-10-03 | CB&I Nuclear | Third Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project. | 08/27/2015 | ML15251A211 |
2015-10-02 | CB&I Nuclear | Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project | 06/30/2015 | ML15190A329 |
2015-10-01 | CB&I Nuclear | Updated Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project | 03/20/2015 | ML15091A345 |
2015-10-00 | CB&I Nuclear | Interim Report Regarding Overlay Plate Mechanical Coupler Welds for Vogtle Units 3 and 4 AP1000 Project | 01/20/2015 | ML15043A188 |
2015-09-00 | Summer Units 2 & 3 | Significant Breakdown in the Quality Assurance (QA) Program of an Agent of the Licensee (a 10CFR 50.55(e) Report) | 02/12/2015 | ML15054A012 |
2015-08-00 | Weir Valves and Controls, USA | TRICENTRIC(r) Triple Offset Valve Spline Adapter Vibrated Loose | 02/10/2015 | ML15049A456 |
2015-07-00 | Valcor Engineering Corporation | Possible NEMA 4 Enclosure Assembly Error In Some Solenoid Valve Models | 02/09/2015 | ML15049A457 |
2015-06-01 | Vogtle Units 3 & 4 | A Breakdown in the Quality Assurance Program for Vogtle 3 & 4 Construction Program (a10 CFR 50.55(e) Written Report) | 02/23/2015 | ML15055A525 |
2015-06-00 | Vogtle Units 3 & 4 | Breakdown in the Quality Assurance Program for Vogtle 3 & 4 Construction Project (a10 CFR 50.55(e) Report) | 02/09/2015 | EN 50798 |
2015-05-00 | Thermo Gamma-Metrics LLC | Shutdown Margin Monitor Environmental Qualification Noncompliance | 02/06/2015 | ML15049A458 |
2015-04-00 | Operation Technology, Inc. / ETAP | Error Report Related to ETAP Power System Analysis Software | 02/03/2015 | EN 50784 |
2015-03-01 | CB&I Nuclear | Closure of Interim Report Regarding Submodule CA01-15 Nonconformances for V.C. Summer Unit 2 AP1000 Project | 06/09/2015 | ML15173A096 |
2015-03-00 | CB&I Nuclear | Interim Report Regarding Submodule CA01-15 Nonconformances for V.C. Summer Unit 2 AP1000 Project | 01/09/2015 | ML15029A542 |
2015-02-01 | CB&I Nuclear | Closure of Interim Report Regarding Trends in Welding and Documentation Issues for Vogtle Units 3 and 4 AP1000 Project | 06/09/2015 | ML15173A096 |
2015-02-00 | CB&I Nuclear | Interim Report Regarding Trends in Welding and Documentation Issues for Vogtle Units 3 and 4 AP1000 Project. | 01/08/2015 | ML15022A200 |
2015-01-00 | AZZ / Nuclear Logistics Inc. | Report of Potential Failure of GE Hitachi (GEH) SBM Type Switches. | 01/08/2015 | ML15014A061 |