Atomic Safety and Licensing Board Panel (ASLBP) – 2019 Proceedings

Documents pertaining to the proceedings of the Atomic Safety and Licensing Board Panel (ASLBP).

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Reactors, Materials and Other

Date(s) Proceeding/Event Reference
September 24, 2019, continuing through September 27, 2019, if necessary.

In the Matter of NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1)

* Open to the public to listen only. Due to the proprietary nature of some information discussed in the evidentiary submissions, the Board may be required to close portions of the hearing from public viewing.

NOTICE
September 23, 2019

In the Matter of NextEra Energy Seabrook, LLC (Seabrook Station, Unit 1)

* Open

NOTICE
September 18, 2019

Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility)

* Open to the public to observe only.

ORDER
September 9, 2019

In the Matter of Florida Power & Light Company (Turkey Point Nuclear Generating Units 3 and 4)

* Open to the public to observe only.

ORDER
August 28, 2019

Granting NRC Staff Motion and Scheduling Evidentiary Hearing In the Matter of Powertech USA, INC. (Dewey-Burdock in Situ Uranium Recovery Facility)

* Members of the public and media are welcome to attend and observe the evidentiary hearing, which may involve technical, scientific, legal, and regulatory issues and testimony. Participation in the hearing will be limited to the parties, their lawyers, and witnesses.

ORDER
August 1, 2019

In the Matter of Powertech USA, INC. (Dewey-Burdock In Situ Uranium Recovery Facility)

* Open to the public to listen only.

ORDER
July 10, 2019

In the Matter of Interim Storage Partners LLC (WCS Consolidated Interim Storage Facility)

* Open to the public to observe only.

NOTICE AND ORDER
April 23, 2019

In the Matter of Powertech USA, INC. (Dewey-Burdock in Situ Uranium Recovery Facility)

* Open to the public to listen only
ORDER
March 27, 2019

Oral Argument in the Matter of Exelon Generation Company, LLC (Peach Bottom Atomic Power Station, Units 2 and 3)

* Open to the public to listen only (Via telephone: 1-888-323-9928; public listen-only passcode: 2222472)

ORDER
(Scheduling Oral Argument)

ORDER
(Revising Time of Argument to Reflect Daylight Saving Time)

March 21, 2019

In the Matter of Powertech USA, INC. (Dewey-Burdock in Situ Uranium Recovery Facility)

* Open to the public to listen only
ORDER
January 23, 2019

Setting Prehearing Conference in the Matter of HI-STORE Consolidated Interim Storage Facility (Holtec International)

* Open to the public to listen only
ORDER