U.S. EPR Safety Evaluations with Open Items
The following table provides access to Safety Evaluations with Open Items that the NRC has issued in connection with its review of the U.S EPR Design Certification submitted by AREVA NP.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Chapter |
Description |
Date |
1 |
Introduction and General Description of Plant |
TBD |
2 |
Site Characteristics, Group I - Sections 2.0 through 2.3 |
08/31/09 |
3 |
Design of Structures, Components, Equipment, and Systems, Group I |
04/13/10 |
Design of Structures, Components, Equipment, and Systems, Group II |
12/08/11 |
Design of Structures, Components, Equipment, and Systems, Group III |
12/15/11 |
Design of Structures, Components, Equipment, and Systems, Group IV |
02/13/13 |
4 |
Reactor |
02/04/10 |
5 |
Reactor Coolant System and Connected Systems |
02/16/10 |
6 |
Engineered Safety Features, Group I |
03/24/11 |
Engineered Safety Features, Group II |
02/13/13 |
7 |
Instrumentation and Controls Systems |
10/17/11 |
8 |
Electric Power |
08/14/10 |
9 |
Auxiliary Systems, Group I |
10/18/11 |
Auxiliary Systems, Group II |
02/08/12 |
10 |
Steam and Power Conversion System |
10/19/10 |
11 |
Radioactive Waste Management |
03/05/10 |
12 |
Radiation Protection |
09/09/09 |
13 |
Conduct of Operations |
07/07/10 |
14 |
Verification Programs |
02/09/12 |
15 |
Transient and Accident Analyses, Group I |
09/07/10 |
Transient and Accident Analyses, Group II |
01/29/15 |
Transient and Accident Analyses, Group III |
03/05/13 |
16 |
Technical Specifications |
03/10/10 |
17 |
Quality Assurance |
01/12/10 |
18 |
Human Factors Engineering |
06/28/11 |
19 |
Response to Severe Accident Policy Statement |
01/15/10 |