U.S. EPR Safety Evaluations with Open Items

The following table provides access to Safety Evaluations with Open Items that the NRC has issued in connection with its review of the U.S EPR Design Certification submitted by AREVA NP.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and General Description of Plant TBD
2 Site Characteristics, Group I - Sections 2.0 through 2.3 08/31/09
3 Design of Structures, Components, Equipment, and Systems, Group I 04/13/10
Design of Structures, Components, Equipment, and Systems, Group II 12/08/11
Design of Structures, Components, Equipment, and Systems, Group III 12/15/11
Design of Structures, Components, Equipment, and Systems, Group IV 02/13/13
4 Reactor 02/04/10
5 Reactor Coolant System and Connected Systems 02/16/10
6 Engineered Safety Features, Group I 03/24/11
Engineered Safety Features, Group II 02/13/13
7 Instrumentation and Controls Systems 10/17/11
8 Electric Power 08/14/10
9 Auxiliary Systems, Group I 10/18/11
Auxiliary Systems, Group II 02/08/12
10 Steam and Power Conversion System 10/19/10
11 Radioactive Waste Management 03/05/10
12 Radiation Protection 09/09/09
13 Conduct of Operations 07/07/10
14 Verification Programs 02/09/12
15 Transient and Accident Analyses, Group I 09/07/10
Transient and Accident Analyses, Group II 01/29/15
Transient and Accident Analyses, Group III 03/05/13
16 Technical Specifications 03/10/10
17 Quality Assurance 01/12/10
18 Human Factors Engineering 06/28/11
19 Response to Severe Accident Policy Statement 01/15/10