Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

US-APWR Safety Evaluations with Open Items

The following table provides access to Safety Evaluations with open items that the NRC has issued in connection with its review of the DCD application that Mitsubishi Heavy Industries, Ltd. (MHI) submitted for the U.S. Advanced Pressurized-Water Reactor (US-APWR):

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and General Description of the Plant TBD
2 Site Characteristics 05/18/10
3 Design of Structures, Systems, Components, and Equipment TBD
4 Reactor TBD
5 Reactor Coolant and Connecting Systems 04/27/11
6 Engineered Safety Features TBD
7 Instrumentation and Controls TBD
8 Electric Power 11/19/10
9 Auxiliary Systems 02/23/12
10 Steam and Power Conversion System 01/19/11
11 Radioactive Waste Management 03/15/11
12 Radiation Protection 03/21/11
13 Conduct of Operations 08/30/10
14 Verification Programs TBD
15 Transient and Accident Analysis 06/15/12
16 Technical Specifications 05/13/10
17 Quality Assurance and Reliability Assurance 12/19/12
18 Human Factors Engineering TBD
19 Probabilistic Risk Assessment and Severe Accident Evaluation TBD

(To top of page)

Page Last Reviewed/Updated Saturday, September 17, 2022

Page Last Reviewed/Updated Saturday, September 17, 2022