The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

US-APWR Final Safety Evaluations

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the DCD application that Mitsubishi Heavy Industries, Ltd. (MHI) submitted for the U.S. Advanced Pressurized-Water Reactor (US-APWR):

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and General Description of the Plant TBD
2 Site Characteristics TBD
3 Design of Structures, Systems, Components, and Equipment TBD
4 Reactor TBD
5 Reactor Coolant and Connecting Systems TBD
6 Engineered Safety Features TBD
7 Instrumentation and Controls TBD
8 Electric Power TBD
9 Auxiliary Systems TBD
10 Steam and Power Conversion System TBD
11 Radioactive Waste Management TBD
12 Radiation Protection TBD
13 Conduct of Operations TBD
14 Verification Programs TBD
15 Transient and Accident Analyses TBD
16 Technical Specifications TBD
17 Quality Assurance and Reliability Assurance TBD
18 Human Factors Engineering TBD
19 Probabilistic Risk Assessment and Severe Accident Evaluation TBD