Final Safety Evaluations for South Texas Project, Units 3 and 4 Application
The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that STPNOC submitted for South Texas Project, Units 3 & 4.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Chapter |
Description |
Date |
|
Table of Contents |
09/29/15 |
|
List of Abbreviations |
09/29/15 |
|
Abstract of the Final Safety Evaluation Report |
09/29/15 |
1 |
Introduction and General Description of Plant |
09/29/15 |
2 |
Site Characteristics |
09/29/15 |
3 |
Design of Structures, Components, Equipment, and Systems |
09/29/15 |
4 |
Reactor |
09/29/15 |
5 |
Reactor Coolant System and Connected Systems |
09/29/15 |
6 |
Engineered Safety Features |
09/29/15 |
7 |
Instrumentation and Controls Systems |
09/29/15 |
8 |
Electric Power |
09/29/15 |
9 |
Auxiliary Systems |
09/29/15 |
10 |
Steam and Power Conversion System |
09/29/15 |
11 |
Radioactive Waste Management |
09/29/15 |
12 |
Radiation Protection |
09/29/15 |
13 |
Conduct of Operations |
09/29/15 |
14 |
Initial Test Program |
09/29/15 |
15 |
Accident and Analysis |
09/29/15 |
16 |
Technical Specifications |
09/29/15 |
17 |
Quality Assurance |
09/29/15 |
18 |
Human Factors Engineering |
09/29/15 |
19 |
Response to Severe Accident Policy Statement |
09/29/15 |
20 |
Not Used |
|
21 |
Not Used |
|
22 |
Requirements Resulting From Fukushima Near-Term Task Force Recommendations |
09/29/15 |
App A |
Post Combined License - Activities - License Conditions, Inspections, Test, Analyses and Acceptance Criteria, and Final Safety Analysis Report Commitments |
09/29/15 |
App B |
Chronology of Combined License Application |
09/29/15 |
App C |
Electronic Request for Additional Information |
09/29/15 |
App D |
References |
09/29/15 |
App E |
Principal Contributors |
09/29/15 |
App F |
Report by Advisory Committee on Reactor Safeguards |
09/29/15 |