Chapter Description Date
  Table of Contents 09/29/15
  List of Abbreviations 09/29/15
  Abstract of the Final Safety Evaluation Report 09/29/15
1 Introduction and General Description of Plant 09/29/15
2 Site Characteristics 09/29/15
3 Design of Structures, Components, Equipment, and Systems 09/29/15
4 Reactor 09/29/15
5 Reactor Coolant System and Connected Systems 09/29/15
6 Engineered Safety Features 09/29/15
7 Instrumentation and Controls Systems 09/29/15
8 Electric Power 09/29/15
9 Auxiliary Systems 09/29/15
10 Steam and Power Conversion System 09/29/15
11 Radioactive Waste Management 09/29/15
12 Radiation Protection 09/29/15
13 Conduct of Operations 09/29/15
14 Initial Test Program 09/29/15
15 Accident and Analysis 09/29/15
16 Technical Specifications 09/29/15
17 Quality Assurance 09/29/15
18 Human Factors Engineering 09/29/15
19 Response to Severe Accident Policy Statement 09/29/15
20 Not Used  
21 Not Used  
22 Requirements Resulting From Fukushima Near-Term Task Force Recommendations 09/29/15
App A Post Combined License - Activities - License Conditions, Inspections, Test, Analyses and Acceptance Criteria, and Final Safety Analysis Report Commitments 09/29/15
App B Chronology of Combined License Application 09/29/15
App C Electronic Request for Additional Information 09/29/15
App D References 09/29/15
App E Principal Contributors 09/29/15
App F Report by Advisory Committee on Reactor Safeguards 09/29/15