Combined License Application Documents for River Bend Station, Unit 3 Application

The U.S. Nuclear Regulatory Commission (NRC) considers public involvement in, and information about, our activities to be a cornerstone of strong, fair regulation of the nuclear industry. As such, the NRC believes that nuclear regulation should be transacted as openly and candidly as possible to maintain and enhance the public's confidence. Ensuring appropriate openness explicitly recognizes that the public must be informed about, and have a reasonable opportunity to participate meaningfully in, the NRC's regulatory processes. Toward that end, this page provides access to documents and correspondence related to the application that Entergy Operations, Inc. (EOI) submitted to obtain a combined license (COL) for an Economic Simplified Boiling Water Reactor (ESBWR) designated as River Bend Station, Unit 3:

On this page:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Reference Documents

In accordance with Title 10, Part 52, of the Code of Federal Regulations (10 CFR Part 52), "Licenses, Certifications, and Approvals for Nuclear Power Plants," a COL application may reference a standard design certification, an early site permit, both, or neither. Many COL applications have referenced an application for design certification, in accordance with 10 CFR 52.55(c). On that basis, EOI referenced the ESBWR design control document (DCD) in its COL original application for River Bend Station, Unit 3:

To top of page

Application

The following table provides access to the COL Application that EOI submitted for River Bend Station, Unit 3.

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Final Safety Analysis Report and associated Technical/Topical Reports would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Part Description Revision
1 General and Administrative Information Rev. 0
2 Final Safety Analysis Report (FSAR) Rev. 0
3 Environmental Report Rev. 0
4 Technical Specifications Rev. 0
5 Emergency Plan Rev. 0
6 Limited Work Authorization (LWA)/Site Redness Plan Rev. 0
7 Departures Report (Includes Information on Departures, Variances, and Exemptions) Rev. 0
8 Safeguards/Security Plans [This Part contains safeguards information which is withheld from public availability] Rev. 0
9 Withheld information [This Part contains other information which is withheld from public availability]  
10 License Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITAAC) Rev. 0
11 Enclosures Rev. 0

To top of page

Applicant Documents

This section lists, in chronological order, the years in which EOI submitted documents to support the U.S. Nuclear Regulatory Commission (NRC) staff's review of EOI's application to obtain a combined license (COL) for River Bend Station, Unit 3. You may click on a year in the list below to see a listing of the documents that were submitted in that year.

2000s: 2009 | 2008

To top of page

NRC Documents

This section lists, in chronological order, the years in which the staff of the U.S. Nuclear Regulatory Commission (NRC) sent documents to EOI in association with EOI's application to obtain a combined license (COL) for River Bend Station, Unit 3. You may click on a year in the list below to see a listing of the documents that were sent in that year.

2000s: 2016 | 2009 | 2008

To top of page

Page Last Reviewed/Updated Sunday, September 18, 2022