Final Safety Evaluations for Levy County, Units 1 and 2 Application
The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that PEF submitted for Levy County, Units 1 & 2.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Chapter |
Description |
Date |
|
Front Material |
05/31/16 |
1 |
Introduction and Interfaces |
05/31/16 |
2 |
Site Characteristics |
05/31/16 |
3 |
Design of Structures, Components, Equipment, and Systems |
05/31/16 |
4 |
Reactor |
05/31/16 |
5 |
Reactor Coolant System and Connected Systems |
05/31/16 |
6 |
Engineered Safety Features |
05/31/16 |
7 |
Instrumentation and Controls |
05/31/16 |
8 |
Electric Power |
05/31/16 |
9 |
Auxiliary Systems |
05/31/16 |
10 |
Steam and Power Conversion |
05/31/16 |
11 |
Radioactive Waste Management |
05/31/16 |
12 |
Radiation Protection |
05/31/16 |
13 |
Conduct of Operations |
05/31/16 |
14 |
Initial Test Program |
05/31/16 |
15 |
Accident Analysis |
05/31/16 |
16 |
Technical Specifications |
05/31/16 |
17 |
Quality Assurance |
05/31/16 |
18 |
Human Factors Engineering |
05/31/16 |
19 |
Response to Severe Accident Policy Statement |
05/31/16 |
19A |
Loss of Large Areas of the Plant Due to Explosions or Fires |
05/31/16 |
20 |
Requirements Resulting from Fukushima Near-Term Task Force Recommendations |
05/31/16 |
21 |
Design Changes Proposed in Accordance with ISG-11 |
05/31/16 |
Appx A |
Post-COL Activities: License Conditions, ITAAC, and FSAR Commitments |
05/31/16 |
Appx B |
Chronology |
05/31/16 |
Appx C |
eRAI Database |
05/31/16 |
Appx D |
References |
05/31/16 |
Appx E |
Principal Contributors |
05/31/16 |
Appx F |
Report by the ACRS |
05/31/16 |
|
Transmittal Letter |
05/31/16 |