The U.S. Nuclear Regulatory Commission is in the process of rescinding or revising guidance and policies posted on this webpage in accordance with Executive Order 14151 Ending Radical and Wasteful Government DEI Programs and Preferencing, and Executive Order 14168 Defending Women From Gender Ideology Extremism and Restoring Biological Truth to the Federal Government. In the interim, any previously issued diversity, equity, inclusion, or gender-related guidance on this webpage should be considered rescinded that is inconsistent with these Executive Orders.

Final Safety Evaluations for Levy County, Units 1 and 2 Application

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that PEF submitted for Levy County, Units 1 & 2.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
  Front Material 05/31/16
1 Introduction and Interfaces 05/31/16
2 Site Characteristics 05/31/16
3 Design of Structures, Components, Equipment, and Systems 05/31/16
4 Reactor 05/31/16
5 Reactor Coolant System and Connected Systems 05/31/16
6 Engineered Safety Features 05/31/16
7 Instrumentation and Controls 05/31/16
8 Electric Power 05/31/16
9 Auxiliary Systems 05/31/16
10 Steam and Power Conversion 05/31/16
11 Radioactive Waste Management 05/31/16
12 Radiation Protection 05/31/16
13 Conduct of Operations 05/31/16
14 Initial Test Program 05/31/16
15 Accident Analysis 05/31/16
16 Technical Specifications 05/31/16
17 Quality Assurance 05/31/16
18 Human Factors Engineering 05/31/16
19 Response to Severe Accident Policy Statement 05/31/16
19A Loss of Large Areas of the Plant Due to Explosions or Fires 05/31/16
20 Requirements Resulting from Fukushima Near-Term Task Force Recommendations 05/31/16
21 Design Changes Proposed in Accordance with ISG-11 05/31/16
Appx A Post-COL Activities: License Conditions, ITAAC, and FSAR Commitments 05/31/16
Appx B Chronology 05/31/16
Appx C eRAI Database 05/31/16
Appx D References 05/31/16
Appx E Principal Contributors 05/31/16
Appx F Report by the ACRS 05/31/16
  Transmittal Letter 05/31/16

Page Last Reviewed/Updated Monday, September 19, 2022