Final Safety Evaluations for William States Lee III Nuclear Station, Units 1 and 2 Application

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that Duke Energy submitted for William States Lee III Nuclear Station, Units 1 & 2.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
1 Introduction and Interfaces 08/01/16
2 Site Characteristics 08/01/16
3 Design of Structures, Components, Equipment, and Systems 08/01/16
4 Reactor 08/01/16
5 Reactor Coolant System and Connected Systems 08/01/16
6 Engineered Safety Features 08/01/16
7 Instrumentation and Controls 08/01/16
8 Electric Power 08/01/16
9 Auxiliary Systems 08/01/16
10 Steam and Power Conversion 08/01/16
11 Radioactive Waste Management 08/01/16
12 Radiation Protection 08/01/16
13 Conduct of Operations 08/01/16
14 Initial Test Program 08/01/16
15 Accident Analysis 08/01/16
16 Technical Specifications 08/01/16
17 Quality Assurance 08/01/16
18 Human Factors Engineering 08/01/16
19 Response to Severe Accident Policy Statement 08/01/16
19A Loss of Large Areas of the Plant Due to Explosions or Fires 08/01/16
20 Requirements Resulting from Fukushima Near Term Task Force Recommendations 08/01/16
21 Design Changes Proposed In Accordance With ISG-11 08/01/16
22 Conclusions 08/01/16