Advanced Safety Evaluations for William States Lee III Nuclear Station, Units 1 and 2 Application
The following table provides access to Advanced Safety Evaluations that the NRC has issued in connection with its review of the COL application that Duke Energy submitted for William States Lee III Nuclear Station, Units 1 & 2.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Chapter |
Description |
Date |
1 |
Introduction and Interfaces |
TBD |
2 |
Site Characteristics |
TBD |
3 |
Design of Structures, Components, Equipment, and Systems |
TBD |
4 |
Reactor |
01/04/12 |
5 |
Reactor Coolant System and Connected Systems |
TBD |
6 |
Engineered Safety Features |
TBD |
7 |
Instrumentation and Controls |
10/11/11 |
8 |
Electric Power |
TBD |
9 |
Auxiliary Systems |
01/17/12 |
10 |
Steam and Power Conversion |
TBD |
11 |
Radioactive Waste Management |
TBD |
12 |
Radiation Protection |
TBD |
13 |
Conduct of Operations |
TBD |
14 |
Initial Test Program |
11/01/11 |
15 |
Accident Analysis |
11/18/11 |
16 |
Technical Specifications |
07/19/11 |
17 |
Quality Assurance |
10/19/11 |
18 |
Human Factors Engineering |
TBD |
19 |
Response to Severe Accident Policy Statement |
TBD |