Safety Evaluations with Open Items for Shearon Harris Nuclear Site, Units 2 and 3 Application
The following table provides access to Safety Evaluations with Open Items that the NRC has issued in connection with its review of the COL application that PEC submitted for Shearon Harris Nuclear Site Units 2 & 3.
This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.
Chapter |
Description |
Date |
1 |
Introduction and General Description of Plant |
TBD |
2 |
Site Characteristics |
TBD |
3 |
Design of Structures, Components, Equipment, and Systems |
TBD |
4 |
Reactor |
TBD |
5 |
Reactor Coolant System and Connected Systems |
TBD |
6 |
Engineered Safety Features |
TBD |
7 |
Instrumentation and Controls Systems |
TBD |
8 |
Electric Power |
TBD |
9 |
Auxiliary Systems |
TBD |
10 |
Steam and Power Conversion System |
TBD |
11 |
Radioactive Waste Management |
TBD |
12 |
Radiation Protection |
TBD |
13 |
Conduct of Operations |
TBD |
14 |
Initial Test Program |
TBD |
15 |
Accident and Analysis |
TBD |
16 |
Technical Specifications |
TBD |
17 |
Quality Assurance |
TBD |
18 |
Human Factors Engineering |
TBD |
19 |
Response to Severe Accident Policy Statement |
TBD |