Applicant Documents
The following table provides access to the COL Application and other documents that PEC submitted in 2010 for Shearon Harris Nuclear Site Units 2 & 3.
Date |
Description |
10/05/10 |
Progress Energy Carolinas, Inc. submittal of Status of the Environmental Review for Shearon Harris Nuclear Power Plant, Units 2 and 3, Combined License Application |
03/29/10 |
Progress Energy Carolinas, Inc. submittal of NRC Correspondence Distribution List Update |
03/22/10 |
Progress Energy Carolinas, Inc. Submittal of Annual Report for AP1000 Standard Plant Design |
02/05/10 |
Progress Energy Carolinas, Inc. transmittal letter regarding AP1000 Combined License Application Departure Report Update |
NRC Documents
The following table provides access to documents and correspondence that the NRC has issued in 2010 in connection with its review of the COL application that PEC submitted for Shearon Harris Nuclear Site Units 2 & 3.
Date |
Description |
10/07/10 |
Actions from October 1, 2010 Public Teleconference |
10/05/10 |
Progress Energy Corporation -- Status of the Environmental Review for Shearon Harris Nuclear Power Plant, Units 2 and 3, Combined License Application |
08/27/10 |
Status of the Environmental Review for Shearon Harris Nuclear Power Plant, Units 2 and 3, Combined License Application |
04/20/10 |
Transmittal of U.S. Army Corps of Engineers Review Comments on Revision 1 of Harris Advanced Reactor (HAR), Section 404(b)(1) - Alternatives Analysis |