Final Safety Evaluations for South Texas Project, Units 3 and 4 Application

The following table provides access to Final Safety Evaluations that the NRC has issued in connection with its review of the COL application that STPNOC submitted for South Texas Project, Units 3 & 4.

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Chapter Description Date
  Table of Contents 09/29/15
  List of Abbreviations 09/29/15
  Abstract of the Final Safety Evaluation Report 09/29/15
1 Introduction and General Description of Plant 09/29/15
2 Site Characteristics 09/29/15
3 Design of Structures, Components, Equipment, and Systems 09/29/15
4 Reactor 09/29/15
5 Reactor Coolant System and Connected Systems 09/29/15
6 Engineered Safety Features 09/29/15
7 Instrumentation and Controls Systems 09/29/15
8 Electric Power 09/29/15
9 Auxiliary Systems 09/29/15
10 Steam and Power Conversion System 09/29/15
11 Radioactive Waste Management 09/29/15
12 Radiation Protection 09/29/15
13 Conduct of Operations 09/29/15
14 Initial Test Program 09/29/15
15 Accident and Analysis 09/29/15
16 Technical Specifications 09/29/15
17 Quality Assurance 09/29/15
18 Human Factors Engineering 09/29/15
19 Response to Severe Accident Policy Statement 09/29/15
20 Not Used  
21 Not Used  
22 Requirements Resulting From Fukushima Near-Term Task Force Recommendations 09/29/15
App A Post Combined License - Activities - License Conditions, Inspections, Test, Analyses and Acceptance Criteria, and Final Safety Analysis Report Commitments 09/29/15
App B Chronology of Combined License Application 09/29/15
App C Electronic Request for Additional Information 09/29/15
App D References 09/29/15
App E Principal Contributors 09/29/15
App F Report by Advisory Committee on Reactor Safeguards 09/29/15