Combined License Application Documents for Levy Nuclear Plant, Units 1 and 2

The U.S. Nuclear Regulatory Commission (NRC) considers public involvement in, and information about, our activities to be a cornerstone of strong, fair regulation of the nuclear industry. As such, the NRC believes that nuclear regulation should be transacted as openly and candidly as possible to maintain and enhance the public's confidence. Ensuring appropriate openness explicitly recognizes that the public must be informed about, and have a reasonable opportunity to participate meaningfully in, the NRC's regulatory processes. Toward that end, this page provides access to documents and correspondence related to the application that Progress Energy Florida, now Duke Energy Florida, LLC, submitted to obtain combined licenses (COL) for two Westinghouse Advanced Passive 1000 (AP1000) pressurized-water reactors (PWRs) designated as Levy Nuclear Plant, Units 1 & 2:

On this page:

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Reference Documents

In accordance with Title 10, Part 52, of the Code of Federal Regulations (10 CFR Part 52), "Licenses, Certifications, and Approvals for Nuclear Power Plants," a COL application may reference a standard design certification, an early site permit, both, or neither. Many COL applications have referenced an application for design certification, in accordance with 10 CFR 52.55(c). On that basis, the application referenced Westinghouse's application to amend the AP1000 standard design certification and cited the following amended design control document (DCD) in its COL original application for Levy Nuclear Plant, Units 1 & 2:

In Revision 1 to the Levy Nuclear Plant, Units 1 & 2 COL application dated October 2, 2009, Progress Energy Florida updated the application to reflect that its application now incorporates by reference AP1000 DCD Revision 17.

In Revision 3 to the Levy Nuclear Plant, Units 1 & 2 COL application dated October 4, 2011, Progress Energy Florida updated the application to reflect that its application now incorporates by reference AP1000 DCD Revision 19. All subsequent revisions to the COL application also incorporate by reference AP1000 DCD Revision 19.

To top of page

Application

The following table provides access to the COL Application that Progress Energy Florida submitted for Levy Nuclear Plant, Units 1 & 2. Beginning in April 2014, the applicant changed to Duke Energy Florida, Inc. Beginning December 2015, the applicant changed to Duke Energy Florida, LLC.

Some combined license applications were submitted with hyperlinks to various reference documents. Currently, the hyperlinks in those applications are not active. These hyperlinks represent an advanced feature that could be activated when the agency upgrades to web-based ADAMS, at which point these applications and documents such as the Final Safety Analysis Report and associated Technical/Topical Reports would be linked together. In the interim, and for those applications that do not have the hyperlink feature, the reference documents may be viewed under the Reference Documents section of the combined license application page. In addition, DVDs of the various documents are available by contacting the Public Document Room staff.

Part Description Revision
1 Administrative and Financial Information Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
2 Final Safety Analysis Report (FSAR) Rev. 9
Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
3 Environmental Report Rev. 1
Rev. 0
4 Technical Specifications Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
5 Emergency Plan Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
6 Limited Work Authorization (LWA) Rev. 1
Rev. 0
7 Departures and Exemption Requests Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
8 Safeguards/Security Plans [This Part contains safeguards information which is withheld from public availability]  
9 [This Part contains other information which is withheld from public availability]  
10 License Conditions and Inspection, Tests, Analyses and Acceptance Criteria (ITAAC) Rev. 8
Rev. 7
Rev. 6
Rev. 5
Rev. 4
Rev. 3
Rev. 2
Rev. 1
Rev. 0
11 Information Incorporated By Reference Rev. 7*
Rev. 6
Rev. 5
Rev. 4
Rev. 2
Rev. 1
Rev. 0

* The applicant included several documents of various revisions in this submittal the most recent of which was submitted as Revision 7.

To top of page

Applicant Documents

This section lists, in chronological order, the years in which the applicant submitted documents to support the NRC staff's review of the COL application for Levy Nuclear Plant, Units 1 & 2. You may click on a year in the list below to see a listing of the documents that were submitted in that year.

2000s: 2009 | 2008

To top of page

NRC Documents

This section lists, in chronological order, the years in which the NRC staff sent documents to the applicant in association with the COL application for Levy Nuclear Plant, Units 1 & 2. You may click on a year in the list below to see a listing of the documents that were sent in that year.

2000s: 2014 | 2013 | 2012 | 2010 | 2009 | 2008

To top of page

Safety Evaluations

This section lists the Safety Evaluations that the NRC has issued in connection with its review of the COL application for Levy Nuclear Plant, Units 1 & 2.

To top of page

Topical Reports

The NRC has issued no Topical Reports in connection with its review of the COL application for Levy Nuclear Plant, Units 1 & 2.