Public Meeting Schedule: Meeting Details

[ New Search ]
Meeting info
Purpose
The purpose of the meeting is to discuss content and approach for the information in PSAR Chapter 2 Section 2.3, "Meteorology," Section 2.4, "Hydrology," and Section 2.5, "Geology" for the planned Project Long Mott construction permit application.
Meeting Feedback
Meeting Dates and Times
* Date/Time Change *
02/12/25
1:00PM - 2:30PM ET

Webinar
Webinar Link:https://teams.microsoft.com/l/meetup-join/19%3ameeting_MTFkN2UxN2EtMjhlMi00ODIyLWE1MWQtYzAxNTFlNDJiYzc0%40thread.v2/0?context=%7b%22Tid%22%3a%22e8d01475-c3b5-436a-a065-5def4c64f52e%22%2c%22Oid%22%3a%225bde7303-11ca-4d7e-af7d-b795d21c7b44%22%7d
Webinar Meeting Number:235455474587
Webinar Password:oa2bh7m7
Contact
Adrian Muñiz
(301) 415-4093

Participation Level
Observation
NRC Participants
External Participants
Docket Numbers - Facility Names
Related Documents
ML25027A360 - 02/12/2025 Meeting with X-energy pertaining to Project Long Mott preliminary safety analysis report (PSAR) Chapter 2, "Site Characteristics"

ML25035A274 - Enclosure: Presentation Materials - Long Mott Generating Station (LMGS) Preliminary Safety Analysis Report Chapter 2 - Site Characteristics

ML25035A274 - Enclosure: Presentation Materials - Long Mott Generating Station (LMGS) Preliminary Safety Analysis Report Chapter 2 - Site Characteristics

Teleconference
Bridge Number: (301) 576-2978
Passcode: 72481099#
Conference ID:
Comments
Members of the public interested in attending this meeting can join using the MS Teams link above.

Page Last Reviewed/Updated Friday, November 19, 2021