Radiological Issues at ISRRadiological Issues at ISR
Facilities
Uranium Recovery Workshop
January 11-12, 2011 Ja ua y , 0
Ronald A. Burrows, CHP, RRPT
Health Physicist
Uranium Recovery Licensing Branchy g
U.S. Nuclear Regulatory Commission
1
Health Physics Topics
• M...
THE CRITICAL PATH TO URANIUM
PRODUCTION: A MODEL APPROACH
Prepared for the 2012 NMA/NRC Conference
Presented by Christopher S. Pugsley, Esq.
Thompson & Pugsley, PLLC
INTRODUCTION
• Uranium Recovery Licensing is a Unique
Blend of Activities, Each of Which Has ...
NMA/NRC Uranium Recovery Workshop
May 3, 2012
Denver, CO
1
•What is CORESafety?
•Why do we need CORESafety?
•How does CORESafety work?
•What is next for my company and CORESafety?
2
What is CORESafety?
•CORESafety is a framework com...
United States Nuclear Regulatory
Commission Licensing Workshop: LegalCommission Licensing Workshop: Legal
and Regulatory Issues of Concern
Presented by the National Mining Association:
Katie Sweeney, General Counsel
Anthony J. Thompson, Thompson & Pugsley, PLLC
INTRODU...
1
Sequoyah Uranium Recovery Facility
Site Location and Facility Description
The former Sequoyah Fuels Corporation (SFC)
facility is located in Sequoyah County in mideastern
Oklahoma about 150 miles east of Oklahoma City,
Oklahoma; 40 miles west of Fort Smith, Arkansas...
NRCNRC’’ss Uranium Recovery Uranium Recovery
New Licensing ProgramNew Licensing Program
Uranium Recovery Licensing Uranium Recovery Licensing
WorkshopWorkshop
January 11January 11--12, 201112, 2011
Keith McConnell, Deputy DirectorKeith McConnell, Deputy Director
Divisi...
NuFuels, Inc. (formally Hydro Resources, Inc.) Crownpoint Uranium Project
Site Location and Project Description
The proposed Crownpoint Uranium Project is located in McKinley County, New Mexico. The
project is located in four different project areas, Church Rock Sec...
NRC Region IV Update
2013 National Mining Association/NRC Uranium Recovery Workshop
Denver, CO May 2013
Tony Vegel, Director, Division of Nuclear Materials Safety, NRC Region IV
D. Blair Spitzberg, Ph.D., Chief, Fuels Safety & Decommissioning Branch, NRC ...
2011 Uranium Recovery Workshop Attendee List
January 11-12, 2011
Last Name
First
Name Tuesday Wed Last Name
First
Name Tuesday Wed
1 Achten Sarah x 61 Leftwich Josh
2 Adams Cindy x 62 Lichnovsky Frank x
3 Adams Greg x 63 Manglass Lisa x
4 Andrew...
Beyond Initial Licensing
NRC License Maintenance Expectations
Uranium Recovery Workshop 2012
May 2, 2012
10:30 – 11:00 AM
Presenter: Wayne Heili, Ur-Energy
1
Background
• NRC tracks Major Uranium Recovery License (URL)
Applications and their status using a...
57687 Federal Register / Vol. 73, No. 193 / Friday, October 3, 2008 / Notices
(1) Electronically at http://
www.regulations.gov, which is the
Federal eRulemaking Portal; (2) by
facsimile (FAX); or (3) by hard copy. All
comments, attachments, and other
material must ide...
1
Lessons Learned – New Facility Applications
Stephen J. Cohen
Team Leader
Uranium Recovery Licensing Branch
U.S. Nuclear Regulatory Commission
2
Lessons Learned
• Review process
• Application Content
• RAI/Open Issues Responses
• Unusual Site Conditions
• Waste di...
APPLICATION FOR MATERIAL LICENSE
NRC FORM 313
(10-2005)
10 CFR 30, 32, 33,
34, 35, 36, 39, and 40
U.S. NUCLEAR REGULATORY COMMISSION
INSTRUCTIONS: SEE THE APPROPRIATE LICENSE APPLICATION GUIDE FOR DETAILED INSTRUCTIONS FOR COMPLETING APPLICATION.
SEND TWO COPIES OF THE EN...
NATIONAL HISTORIC PRESERVATION
ACT AND THE SECTION 106 PROCESS:
ISSUES IN NRC LICENSING
Prepared for the 2012 NMA/NRC Conference
Presented by Anthony J. Thompson, Esq.
Thompson & Pugsley, PLLC
INTRODUCTION
• The National Historic Preservation Act (NHPA) Has...
Powertech’s Dewey-Burdock Uranium Recovery Project
Site Location and Project Description
The Dewey-Burdock site is located approximately 13 miles northwest of the City of Edgemont,
South Dakota (Figure 1).
Project Licensing and Operating History
By letter date...
To provide for the disposal, long-term stabilization and control of uranium mill tailings in a safe and environmentally sound manner, and to minimize or eliminate radiation health hazards to the public, Congress enacted the Uranium Mill Tailings Radiation Control Act of 1978 (...
1.0 General Site InformationSite Location:Converse County, WYFormer NRC License No.:SUA-1139NRC Docket No.:40-8102Agreement State Contact:Brandi O’Brien307-777-6435NRC Agreement State Site Monitor:Duncan WhiteDuncan.White@nrc.govNRC Site Monitor:Thomas LancasterThomas.La...
March 23, 2005Mr. Peter LuthigerManager, Radiation Safety and Environmental AffairsRio Algom Mining LLCP.O. Box 218 Grants, NM 87020SUBJECT: 2004 ALARA REVIEW - AMBROSIA LAKE URANIUM MILL FACILTIYSUA-1473Dear Mr. Luthiger:Under letter dated March 7, 2005, Rio Algom Mining LL...
~/|;AORNL-5458w3DE!Radiological Survey of theInactive Uranium-Mill Tailings atUNION Ambrosia Lake, New MexicoCARBIDE-!F.F.HaywoodiD. J. Christian{B. S. Ellis|H. M. Hubbard, J r.| D. LorenzoiW. H. Shinpaugh!l!|.',,--., ,4 fg(.%s== WISO"1000k 000$022C PDR;,. -. - _ _ . . .- - . ...
August8, 2001MEMORANDUM TO: Melvyn Leach, ChiefFuel Cycle Licensing Branch,Division of Fuel Cycle Safety and SafeguardsOffice of Nuclear Material Safety and SafeguardsFROM: Michael C. Layton, Senior Hydrogeologist /RA/Uranium Recovery Section Fuel Cycle Licensing Branch,Di...
Willianm. PaU Goranson. F EManager Radiation SafetyRegulatory Compliance and LceossrigRio Algom Mining LLC66TA K Z o ^ 1 m6305 Waterford BouievardSuite 400, Oklahoma City 405.858.4807 telOklahoma 73118 405.848 1208 faxJuly 16, 2003CERTIFIED MAIL 70012510000221936410Return Rece...
._-c ..,. .- .. .. .. - _-'.4s, ...,.-. ,. .'..,I.4.,4LFINALCOMPLETION REVIEW REPORT,FOR THEREMEDIAL ACTIONAT THE -AMBROSIA LAKE, NEW MEXICOURANIUM MILL TAILINGS SITE'aMay 1997.4DIVISION OF WASTE MANAGEMENTU.S. NUCLEAR REGULATORY COMMISSION.9705140065'970501P'PDR ADOCK 0400090...
. , , . - . .DOE /EA - 0322United States Department of Energy ,CA'-,/p,Environmental Assessment|Remedial Actionat the Ambrosia LakeUranium Mill Tallings SiteAmbrosia Lake, New Mexico|June,1987|Ds,on,,Uranium Mill Tailings Remedial Action Project IUMTRAPSM S2 n a?!7 72WM-67PDR....
i ~~~~~ |~ ~ . .- |M M- 2 S s ~ ~~-~.III I WE I 1. WE-. ~WlWa_N-_lTable of Contents1.0 Introduction 12.0 Mill Demolition Criteria/Objectives 13.0 Site History 24.0 Facility Description 34.1 Conventional Mill Process 34.2 Ion Exchange and Precipitation Process 65.0 General Demo...
1
Mr. Ramzi Jammal
Executive Vice‐President and Chief Regulatory Operations Officer
U.S. Nuclear Regulatory Commission’s 31st Annual Regulatory Information Conference
Bethesda, MD ‐ United States of America
March 13, 2019
FUEL CYCLE OPERATING
EXPERIENCE IN CANADA
2
C...