NRC License Renewal in the 21st
Century
Josh Leftwich,
Director of Radiation Safety and Licensing,
Cameco Resources
Introduction
● Background
– Initially licensed in 1989 renewed in 1997
– License Renewal Application was submitted in November 2007
� Entire 550pg docu...
On this page:Publication Information AbstractDownload complete documentNUREG-1910 – Final Report, Supplement 4, Volume 1 (PDF - 39.68 MB)Publication InformationManuscript Completed: January 2014Date Published: January 2014Prepared by:
Office of Federal and State Materia...
Last updated 7/20/18
Company Site Under Consideration Design Estimated Application Date
Date
Accepted
State Status
Letter of
Intent
Cameco (Crow Butte) North Trend ISR - Expansion Received June 2007 Aug 2007 NE
SER Completed - 7/2013, on hold requested by
applicant
No...
Uranium Recovery Licensing Workshop, 2011 – Radon Emissions From Tailings & Evaporation Ponds
Radon EmissionsRadon Emissions
from Tailingsg
and Evaporation Ponds
Presented To:
NRCs Uranium Recovery Licensing Workshop
Denver, January 11-12, 2011
Presented By:
Steve Brown...
This NUREG publication has been issued for public comment. The comment period is now closed.On this page:Publication Information AbstractDownload complete documentNUREG-1910, Supplement 2, Final Report (PDF - 12.56 MB)Publication InformationManuscript Completed: January 2011 D...
Evaluating the Effects of Uranium Kd on the
Restoration of ISL Wellfields Using PHT3D
After Devoto, 1978
ISR MINING PROCESS
Inject Lixiviant
Recover Pregnant Solution
Ion Exchange
Reverse Osmosis
Reinjection Lixiviant With Make Up Water With Reactants
What i...
1
Crow Butte Uranium Recovery Facility
Site Location and Facility Description
The Crow Butte facility is located approximately 4 miles southeast of the City of Crawford in
Dawes County, Nebraska. The facility was originally developed by Wyoming Fuel Corporation in ...
Willow Creek Uranium Recovery Project
Site Location and Facility Description
The Willow Creek Project, formally
known as Irigaray and Christensen
Ranch, is composed of two distinct sites
(Figure 1). The Irigaray site (Figure 2)
contains the Irigaray central proce...
UR Workshop, 01/11-12/2011 1
Demonstrating Compliance
with 10 CFR 20 Exposure
Limits for Radon-222
and Progeny
Duane Schmidt, CHP
Senior Health Physicist
DWMEP/Reactor Decommissioning Branch
U.S. Nuclear Regulatory Commission
duane.schmidt@nrc.gov
301-415-6919
UR W...
Industry Perspective:
NRC/BLM NEPA Cooperation
U.S. NRC Uranium Recovery
Licensing Workshop
January 2011
Denver, CO
1
NEPA REQUIREMENT
• All federal agencies are required to meet the
provisions of the National Environmental
Policy Act (NEPA) of 1969
• EPA has a...
1
Uranium Solubility and
Implications for Modern
Uranium Recovery Facilities
Steven Brown, CHP
Douglas Chambers, PhD
SENES Consultants Ltd
NMA/NRC
Uranium Recovery Workshop 2012
Denver, Colorado
2-3 May 2012
1
SENES Consultants Limited
Specialist in Energy,...
EPA S / L l dEPA Status / Lessons learned
•Nuclear Regulatory Commission
Uranium RecoveryUranium Recovery
Licensing Workshop
January 11 and 12, 2010
Denver ColoradoDenver, Colorado
•
Dan Jackson EPA Region 8
1
• Uranium ISL Activity in Region 8 (include RARE)...
27052 Federal Register / Vol. 74, No. 107 / Friday, June 5, 2009 / Notices
Type of Review: Extension without
change of a previously approved
collection.
Title of Collection: Temporary Labor
Camps (29 CFR 1910.142).
OMB Control Number: 1218–0096.
Affected Public: Bus...
This NUREG publication was issued for public comment. The comment period is now closed. On this page:Publication Information AbstractDownload complete documentNUREG-1910: Final Report, Supplement 5 (PDF - 59.09 MB)For information about how the NRC handles your comments, see ou...
On this page:Publication Information AbstractDownload complete documentNUREG-1910, Supplement 6 (PDF - 5.60 MB)For information about how the NRC handles your comments, see our Privacy Policy.Publication InformationManuscript Completed: November 2016 Date Published: December 20...
On this page:Publication Information AbstractDownload complete documentNUREG-1910 – Final Report, Supplement 4, Volume 2 (PDF - 32.03 MB)Publication InformationManuscript Completed: January 2014Date Published: January 2014Prepared by:
Office of Federal and State Materia...
U.S. NUCLEAR REGULATORY COMMISSION STRATEGY FOR OUTREACH AND
COMMUNICATION WITH INDIAN TRIBES POTENTIALLY AFFECTED BY URANIUM
RECOVERY SITES
Purpose
The purpose of this strategy is to articulate the U.S. Nuclear Regulatory Commission’s
(NRC’s) approach to promote g...
This NUREG-series publication was issued for public comment. The comment period is now closed.On this page:Publication Information AbstractDownload complete documentNUREG-1962, Draft Report for Comment (PDF - 206.16 KB)Publication InformationManuscript Completed: March 2011Da...
On this page:Publication InformationAbstractDownload complete documentNUREG/CR-5734 (PDF - 3.49 MB)Publication InformationManuscript Completed: August 1991 Date Published: November 1991Prepared by: B.W. Moran and W.L. BelewOak Ridge K-25 Site Oak Ridge, Tennessee 37831 Managed...
Lessons Learned
NRC Inspections at Operating Sites
John McCarthy,
Radiation Safety Officer,
Cameco Resources, Smith Ranch-Highland
,
Overview
● Cameco Resources had inspections at both of their operating
facilities:
– Smith-Ranch Highlands-Wyoming
� February 22-25
� A...
1
Smith Ranch - Highland Uranium Recovery Facility
Site Location and Facility Description
The Smith Ranch-Highland uranium project is
located approximately 23 miles northwest of the
City of Douglas in Converse County, Wyoming
(Figure 1). The site is owned by Power...
This NUREG publication has been issued for public comment. The comment period is now closed.On this page:Publication Information AbstractDownload complete documentNUREG-1910 – Final Report , Supplement 3 (PDF - 36.70 MB)For information about how the NRC handles your comments, ...
Uranium and BLM Wyoming: Uranium and BLM Wyoming:
the past, present and future
Uranium minerals on BLM administered lands
Open to Mineral Entry are locatable under the
43 CFR Part 3800 regulations, unless on
Acquired Lands.
B u r e a u o f L a n d M a n a g e ...
ISR Application and Licensing Actions: ISR Application and Licensing Actions:
Hydrogeology Lessons LearnedHydrogeology Lessons Learned
Eli A St i Ph DEli A St i Ph DElise A. Striz, Ph.D.Elise A. Striz, Ph.D.
HydrogeologistHydrogeologist
Uranium Recovery and Licensing Bra...
NRC Inspection Program
Linda M. Gersey
NRC Region IVNRC Region IV
Three Discussion Topics
• Pre-operational InspectionsPre operational Inspections
• Inspection Lessons Learned
C t i ti Li it DOT R t i t d• Contamination Limits - DOT vs. Restricted
Area Releases
Pre-...