September 6, 2005
Mr. T. Palmisano
Site Vice-President
Prairie Island Nuclear Generating Plant
Nuclear Management Company, LLC
1717 Wakonade Drive East
Welch, MN 55089
SUBJECT: PRAIRIE ISLAND NUCLEAR GENERATING PLANT, UNITS 1 AND 2
NRC PROBLEM IDENTIFICATION AND RESOLUTION ...
November 9, 2005
Rick A. Muench, President and
Chief Executive Officer
Wolf Creek Nuclear Operating Corporation
P.O. Box 411
Burlington, KS 66839 Wolf Creek Nuclear Operating Corporation
SUBJECT: WOLF CREEK GENERATING STATION - NRC INTEGRATED INSPECTION
REPORT 05000482/...
June 27, 2000
EA-00-094
Mr. J. V. Parrish (Mail Drop 1023)
Chief Executive Officer
Energy Northwest
P.O. Box 968
Richland, Washington 99352-0968
SUBJECT: WNP-2 INSPECTION REPORT NO. 50-397/00-10
Dear Mr. Parrish:
On April 2 through May 20, 2000, the NRC completed a safet...
June 29, 1999
The Honorable James M. Inhofe, Chairman
Subcommittee on Clean Air, Wetlands,
Private Property and Nuclear Safety
Committee on Environment and Public Works
United States Senate
Washington, D.C. 20510
Dear Mr. Chairman:
The Fiscal Year 1999 Energy and Water...
January 25, 2006
Mr. Christopher M. Crane
President and CNO
Exelon Nuclear
Exelon Generation Company, LLC
200 Exelon Way
Kennett Square, PA 19348
SUBJECT: LIMERICK GENERATING STATION - NRC INTEGRATED INSPECTION
REPORT 05000352/2005005, 05000353/2005005
Dear Mr. Crane:
On ...
April 25, 2003
Mr. Thomas Coutu
Site Vice President
Kewaunee Nuclear Plant
Nuclear Management Company, LLC
N490 Hwy 42
Kewaunee, WI 54216-9511
SUBJECT: KEWAUNEE NUCLEAR POWER PLANT
NRC INTEGRATED INSPECTION REPORT 50-305/03-02
Dear Mr. Coutu:
On March 31, 2003, the U.S. N...
October 30, 2001
Mr. William O�Connor, Jr.
Vice President
Nuclear Generation
Detroit Edison Company
6400 North Dixie Highway
Newport, MI 48166
SUBJECT: FERMI 2 NUCLEAR POWER STATION
NRC INSPECTION REPORT 50-341/01-13(DRP)
Dear Mr. O�Connor:
On September 30, 2001, the NRC...
July 17, 2000
S. K. Gambhir, Division Manager
Nuclear Operations
Omaha Public Power District
Fort Calhoun Station FC-2-4 Adm.
P.O. Box 399
Hwy. 75 - North of Fort Calhoun
Fort Calhoun, Nebraska 68023-0399
SUBJECT: FORT CALHOUN STATION - NRC INSPECTION REPORT NO. 50-285/2000...
Home > Nuclear Reactors > Operating Reactors > Reactor Oversight Process > Plant Summaries> Arkansas Nuclear 1
> Quarterly Plant Inspection Findings
Arkansas Nuclear 1 – Quarterly Plant Inspection Findings
3Q/2017 – Plant Inspection Findings
On this page:
• Initiating Eve...
Power Reactor
Facility: Quad Cities
RX Type: [1] GE-3,[2] GE-3
Emergency Class: Non Emergency
Event Text BOTH TRAINS OF STANDBY GAS TREATMENT INOPERABLE
The following information was received from the licensee via email:
"At 0130 CDT on July 4 2022, it was discovered both trains of Standby Gas Treatment System were simultaneously inoperable due to failure to reach requ...
Power Reactor
Facility: Watts Bar
RX Type: [1] W-4-LP,[2] W-4-LP
Emergency Class: Non Emergency
Event Text EN Revision Imported Date: 9/17/2024
EN Revision Text: 60-DAY NOTIFICATION OF INVALID SPECIFIED SYSTEM ACTUATION
The following information was provided by the licensee via phone and email:
"At 1248 EDT on July 22, 2024, with Unit 1 in mode 1 at 100% power, a comp...
,-- - - . .- . . . . . . - . . ~ - ... _ . .:: . _;;*!c &: <.. !gJ_n6'L 1l'|,t...'l..1 U,.u\ it'd1l-'i|i;. . ,1i Elb ti.m 1-2,NUS CORPORATION3 _,. -,__ _ .. .. . .. _<(- 7~ , .1 ,.' '_ _ _ _ . . _ - _ . . . . _ . _ _. .. . _ . - . . . . , _ .a . a*8PiP!'Cf'/,.,u,iSwlTCHYARD 'o...
APR 0 6 2015 Jon A. Franke Susquehanna Nuclear, LLC Site Vice President 769 Salem Boulevard Berwick, PA 18603 Tel. 570.542.2904 Fax 570.542.1504 Jon.Franke@TalenEnergy.com U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 SUSQUEHANNA STEA...
Davis-Besse Tech Spec Bases Index B 2.0 SAFETY LIMITS (SLs) B 2.1.1 Reactor Core SLs B 2.1.2 Reactor Coolant System (RCS) Pressure SL B 3.0 LIMITING CONDITION FOR OPERATION (LCO) APPLICABILITY B 3.0 SURVEILLANCE REQUIREMENT (SR) APPLICABILITY B 3.1 REACTIVITY CONTROL SY...
Three Mile Island 1
Initiating Events
Significance: Jun 30, 2001
Identified By: NRC
Item Type: NCV NonCited Violation
Control Room Operators did not Properly Acknowledge a Computer Alarm Indicating a Leaking Reactor Coolant System Safety Relief
Valve
Control room op...
Browns Ferry 2
3Q/2010 Plant Inspection Findings
Initiating Events
Significance: Sep 30, 2010
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to adequately test molded case circuit breakers
The inspectors identified a non-cited violation of 10 CFR Part ...
Home > Nuclear Reactors > Operating Reactors > Reactor Oversight Process > Plant Summaries> Clinton > Quarterly
Plant Inspection Findings
Clinton – Quarterly Plant Inspection Findings
3Q/2017 – Plant Inspection Findings
On this page:
• Initiating Events
• Mitigating Syste...
Home > Nuclear Reactors > Operating Reactors > Reactor Oversight Process > Plant Summaries> Grand Gulf 1 >
Quarterly Plant Inspection Findings
Grand Gulf 1 – Quarterly Plant Inspection Findings
3Q/2017 – Plant Inspection Findings
On this page:
• Initiating Events
• Mitiga...
Callaway
2Q/2015 Plant Inspection Findings
Initiating Events
Significance: Sep 27, 2014
Identified By: Self-Revealing
Item Type: FIN Finding
Failure to Verify Material Properities Prior to Installation
The inspectors reviewed a self-revealing finding involving failure to v...
Cooper
3Q/2007 Plant Inspection Findings
Initiating Events
Significance: Jun 23, 2007
Identified By: NRC
Item Type: NCV NonCited Violation
Entry Into the Stability Exclusion Region of the Power to Flow Map
A self-revealing noncited violation of Technical Specificati...
Duane Arnold
3Q/2007 Plant Inspection Findings
Initiating Events
Significance: Jul 10, 2007
Identified By: NRC
Item Type: NCV NonCited Violation
INADEQUATE RECIRCULATION RISER WELD EXAMINATION (NOZZLE N2F).
The inspectors identified a non-cited violation (NCV) of 10...
Palo Verde 2
4Q/2006 Plant Inspection Findings
Initiating Events
Mitigating Systems
Significance: TBD Nov 30, 2006
Identified By: NRC
Item Type: NCV NonCited Violation
FAILURE TO IMPLEMENT THE OPERABILITY DETERMINATION PROCESS
The team identified two examples of a n...
SECY 98-193
August 13, 1998
For: The Commissioners
From: James L. Blaha, Assistant for Operations, Office of the EDO
Subject: WEEKLY INFORMATION REPORT - WEEK ENDING AUGUST 7, 1998
Contents Enclosure
Nuclear Reactor Regulation A
Nuclear Material Safety and Safegu...
January 31, 2005
Mr. M. Nazar
Senior Vice President and
Chief Nuclear Officer
Nuclear Generation Group
American Electric Power Company
500 Circle Drive
Buchanan, MI 49107
SUBJECT: D. C. COOK NUCLEAR POWER PLANT, UNITS 1 AND 2
NRC PROBLEM IDENTIFICATION AND RESOLUTION INSPE...
January 27, 2005
Southern Nuclear Operating Company, Inc.
ATTN: Mr. H. L. Sumner
Vice President - Hatch Project
P. O. Box 1295
Birmingham, AL 35201-1295
SUBJECT: EDWIN I. HATCH NUCLEAR PLANT - NRC INTEGRATED INSPECTION
REPORT 05000321/2004005 and 05000366/2004005
Dear M...