Turkey Point 3
3Q/2009 Plant Inspection Findings
Initiating Events
Significance: Jun 30, 2009
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to Implement Procedures for Conducting A Valve Alignment Causes Spill of Reactor Coolant And
Contamination Of A...
Duane Arnold
4Q/2012 Performance Indicators
Licensee's General Comments: none
Licensee Comments: none
Unplanned Scrams per 7000 Critical Hrs 1Q/11 2Q/11 3Q/11 4Q/11 1Q/12 2Q/12 3Q/12 4Q/12
Unplanned scrams 0 0 0 0 0 0 0 0
Critical hours 2159.0 21...
Limerick 1
3Q/2013 Performance Indicators
The solid trend line represents the current reporting period.
Licensee's General Comments: none
Licensee Comments: none
Unplanned Scrams per 7000 Critical Hrs 4Q/11 1Q/12 2Q/12 3Q/12 4Q/12 1Q/13 2Q/13 3Q/...
San Onofre 3
4Q/2013 Performance Indicators
The solid trend line represents the current reporting period.
Licensee's General Comments: none
Licensee Comments:
2Q/13: This PI is N/A for 2Q13 due to less than 2400 critical hours in previous 4 quarters...
San Onofre 2
3Q/2013 Performance Indicators
San Onofre 2 has ceased reporting data (invalid) because of transition to decommissioning phase.
The solid trend line represents the current reporting period.
Licensee's General Comments: none
Licensee Comm...
Susquehanna 2
1Q/2014 Performance Indicators
The solid trend line represents the current reporting period.
Licensee's General Comments: none
Licensee Comments:
3Q/13: Within the last four quarters, Susquehanna Unit 2 has experienced four reactor scr...
San Onofre 2
4Q/2013 Performance Indicators
The solid trend line represents the current reporting period.
Licensee's General Comments: none
Licensee Comments:
2Q/13: This PI is N/A for 2Q13 due to less than 2400 critical hours in previous 4 quarters...
San Onofre 3
4Q/2013 Performance Indicators
The solid trend line represents the current reporting period.
Licensee's General Comments: none
Licensee Comments:
2Q/13: This PI is N/A for 2Q13 due to less than 2400 critical hours in previous 4 quarters...
Coast to Coast
Spent Fuel Dry Storage
Problems and Recommendations
Erica Gray
NRC REG CON 2015
November 18, 2015
SanOnofreSafety.org 2
Game Changer:
Indefinite on-site storage
NRC 2014: 100+ years on-site
No other sites on horizon
Thin canisters not maintainable
Ma...
Nine Mile Point 1
3Q/2003 Plant Inspection Findings
Initiating Events
Significance: Mar 29, 2003
Identified By: NRC
Item Type: NCV NonCited Violation
Procedural Non-Compliance Resulted in Control Rods Being Withdrawn at Greater than Nominal Speed.
Green. The inspect...
Grand Gulf 1
1Q/2005 Plant Inspection Findings
Initiating Events
Significance: Jun 30, 2004
Identified By: Self Disclosing
Item Type: NCV NonCited Violation
Failute to Implement Surveillance Procedure Resulting in the Inadvertent Initiation of HPCS System
The inspec...
Braidwood 2
Initiating Events
Significance: Nov 29, 2002
Identified By: Self Disclosing
Item Type: FIN Finding
FEEDWATER OIL DRAIN VALVE INADVERTENTLY LEFT OPEN
A finding of very low safety significance was identified through a self-revealing event when the main cont...
Seabrook 1
4Q/2003 Plant Inspection Findings
Initiating Events
Significance: Dec 31, 2003
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to Properly Implement Procedure for RCS Draining to Mid-loop
The inspectors identified a non-cited violation of Tec...
1 LBP-02-04, 55 NRC 49, certification accepted, CLI-02-06, 55 NRC 164 (2002). These
contentions raise issues involving possible terrorist attacks using airplanes, boats, and truck
bombs; the destruction of dams which hold the water used to cool the reactors; attacks on spent...
UNITED STATES OF AMERICA
NUCLEAR REGULATORY COMMISSION
COMMISSIONERS:
Allison M. Macfarlane, Chairman
Kristine L. Svinicki
George Apostolakis
William D. Magwood, IV
William C. Ostendorff
)
In the Matter of )
)
SOUTHERN CALIFORNIA EDISON CO. ) Doc...
SECY-98-166
July 6, 1998
FOR: The Commissioners
FROM: L. Joseph Callan /s/
Executive Director for Operations
SUBJECT: SUMMARY OF ACTIVITIES RELATED TO GENERIC SAFETY ISSUES
PURPOSE:
To provide the annual summary report on activities related to generic safety issues (GS...
San Onofre 2
4Q/2013 Performance Indicators
The solid trend line represents the current reporting period.
Licensee's General Comments: none
Licensee Comments:
2Q/13: This PI is N/A for 2Q13 due to less than 2400 critical hours in previous 4 quarters.
1Q/13: This PI is N...
Home > Nuclear Reactors > Operating Reactors > Reactor Oversight Process > Plant Summaries> D.C. Cook 1 >
Quarterly Plant Inspection Findings
D.C. Cook 1 – Quarterly Plant Inspection Findings
3Q/2017 – Plant Inspection Findings
On this page:
• Initiating Events
• Mitigati...
Home > Nuclear Reactors > Operating Reactors > Reactor Oversight Process > Plant Summaries> Prairie Island 2 > Quarterly
Performance Indicators
Prairie Island 2 – Quarterly Performance Indicators
3Q/2017 Performance Indicators
The solid trend line represents the current re...
UNITED STATES
".4 NUCLEAR REGULATORY COMMISSION
* •WASHINGTON, D.C. 20555-0001-
SECRETARY
July 25, 2007
COMMISSION VOTING RECORD
DECISION ITEM: SECY-07-0096
TITLE: POSSIBLE REACTIVATION OF CONSTRUCTION AND
LICENSING ACTIVITIES FOR THE WATTS-BAR NUCLEAR
PLANT UNIT 2
The...
INFORMATION REPORT
October 25, 2006 SECY-06-0214
For: The Commissioners
From: Michael R. Johnson, Assistant for Operations, Office of the EDO
Subject: WEEKLY INFORMATION REPORT - WEEK ENDING
OCTOBER 13, 2006
Contents Enclosure
Nuclear Reactor Regulation A
New Reactors B...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
March 2, 2016
Mrs. Cheryl A. Gayheart, VP Nuclear Plant Site
Southern Nuclear Operating Company
Joseph M. Farley Nuclear Plant
...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
245 PEACHTREE CENTER AVENUE NE, SUITE 1200
ATLANTA, GEORGIA 30303-1257
March 2, 2016
Mr. Mano Nazar
President and Chief Nuclear Officer
Nuclear Division
NextEra Energy
P. O. Box 14000
Juno Beach...
December 1, 2004
Mr. Christopher M. Crane
President and Chief Nuclear Officer
Exelon Nuclear
Exelon Generation Company, LLC
4300 Winfield Road
Warrenville, IL 60555
SUBJECT: CLINTON POWER STATION
NRC EVALUATION OF CHANGES, TESTS OR, EXPERIMENTS AND
PERMANENT PLANT MODIFICAT...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION I
2100 RENAISSANCE BLVD., SUITE 100
KING OF PRUSSIA, PA 19406-2713
March 2, 2016
Mr. Marty Richey
Site Vice President
FirstEnergy Nuclear Operating Company
Beaver Valley Power Station
P.O. Box 4
Shippi...