SECY 96-076
April 11, 1996
For: The Commissioners
From: James L. Blaha, Assistant for Operations, Office of the EDO
Subject: WEEKLY INFORMATION REPORT - WEEK ENDING APRIL 5, 1996
Contents Enclosure
Nuclear Reactor Regulation A
Nuclear Material Safety and Safeguards B
N...
WEEKLY INFORMATION REPORT
December 24, 2002 SECY-02-0224
For: The Commissioners
From: John W. Craig, Assistant for Operations, Office of the EDO
Subject: SECY-02-0224 WEEKLY INFORMATION REPORT - WEEK
ENDING DECEMBER 20, 2002
Contents Enclosure
Nuclear R...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
OFFICE OF NUCLEAR REACTOR REGULATION
WASHINGTON, DC 20555-0001
May 2, 2003
NRC REGULATORY ISSUE SUMMARY 2003-09
ENVIRONMENTAL QUALIFICATION OF LOW-VOLTAGE
INSTRUMENTATION AND CONTROL CABLES
ADDRESSEES
All holders of operating ...
- -IIt* v).THE, CLEVELAND ELECTRIC ILLUMINATING COMPANYi* P.o. 90X 91 3 PERRY, oHlo 44001 B TELEPHONE (216) 26437375 ADDRESB 10 CENTER ROAD)FROM CLEVELAND: 4741260 3 TELEX: 241699ANSWERBACK: CEIPRYojAl Kaplan Serving The Best location in the NationPERRY NUCLEAR POWER PLANTIvet...
December 4, 2018 Technical Specifications Task Force 11921 Rockville Pike, Suite 100 Rockville, MD 20852 SUBJECT: FINAL SAFETY EVALUATIONS OF TECHNICAL SPECIFICATIONS TASK FORCE TRAVELER TSTF-563, REVISION 0, “REVISE INSTRUMENT TESTING DEFINITIONS TO INCORPORATE THE SUR...
AF’PENDIX C Pedormance Indicator Escalated enforcement, or 01 or OIG investigation occurred or ongoing Lost control of licensed material presumed in public domain that is reportable or resulted in a violation unauthorized disposal or release of material that is reportable or r...
U.S. NUCLEAR REGULATORY COMMISSION September 2008OFFICE OF NUCLEAR REGULATORY RESEARCH Division 10 DRAFT REGULATORY GUIDE Contact: M. Orr(301) 415-6373 DRAFT REGULATORY GUIDE DG-0020 (Proposed Revision 3 of Regulatory Guide 10.4, dated December 1987) GUIDE FOR THE PREPARA...
U.S. NUCLEAR REGULATORY COMMISSION April 2008OFFICE OF NUCLEAR REGULATORY RESEARCH Division 10 DRAFT REGULATORY GUIDE Contact: M. Orr(301) 415-6373 DRAFT REGULATORY GUIDE DG-0018 (Proposed Revision 3 of Regulatory Guide 10.8, dated August 1987) GUIDE FOR THE PREPARATION OF...
July26, 2001Mr. J. V. Parrish Chief Executive OfficerEnergy NorthwestP.O. Box 968 (Mail Drop 1023)Richland, WA 99352-0968SUBJECT: REQUEST FOR ADDITIONAL INFORMATION (RA) - COLUMBIA GENERATINGSTATION (TAC NO. MB0573)Dear Mr. Parrish:By letter dated October 30, 2000, Energy Nor...
R. A. SacconeVice President - Nuclear OperationsPPL Susquehanna, LLC769 Salem BoulevardBerwick, PA 18603Tel. 570.542.3959 Fax 570.542-1504rasaccone@pplweb.com%%. IiP% TJUL 2 6 2006U. S. Nuclear Regulatory CommissionAttn: Document Control DeskMail Stop OP1-17Washington, DC 2055...
TECHNICAL EVALUATIONREPORTOF THENINE MILE POINT, UNIT 2DETAILED CONTROL ROOM DESIGN REVIEWCONDUCTED BYNIAGARAMOHAWK POWER CORPORATIONL. Rolf PetersonLawrence Livermore National LaboratoryNovember 15, 1985~I860i280074 8~0>~~PDR ADOCK 05000410FPDRTABLE OF CONTENTS~Pa e1.2.ckgl o...
ENT000722 Submitted: October 29, 2015 UNITED STATES OF AMERICA NUCLEAR REGULATORY COMMISSION BEFORE THE ATOMIC SAFETY AND LICENSING BOARD In the Matter of ) Docket Nos. 50-247-LR and ) 50-286-LR ENTERGY NUCLEAR OPERATIONS, INC. ) ) (Indian Point Nuclear Gene...
Charles F. Soutar Senior Vice PresidentConsolidated Edison Company of New York, Inc. 4 Irving P'ace, New York, NY 10003 Telephone (212) 460-4696June 17, 1982 Re: Indian Point Unit No. 2 Docket No. 50-247Director of Nuclear Reactor Regulation U. S. Nuclear Regulatory Commissio...
Entergy Operations. Inc. 5485 J S H j .ay 61 P. 0. Box 220 St Francisville LA 70775 Tel 225 381 4374 Fax 225 381 4872 Randall K. Edington Vice President, Operations January 24, 2001 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C. 20555 Su...
-,_-- _-_ _s-
July 19, 2002
APPLICANT: Virginia Electric and Power Company
FACILITY: North Anna Power Station, Unit Nos. 1 and 2
SUBJECT: SUMMARY OF PUBLIC MEETING HELD TO DISCUSS THE DRAFT
SUPPLEMENTAL ENVIRONMENTAL IMPACT STATEMENT REGARDING
LICENSE RENEWAL FOR THE NORTH ANNA POWER ...
August 30, 2004
Carolina Power & Light Company
ATTN: Mr. James Scarola
Vice President - Harris Plant
Shearon Harris Nuclear Power Plant
P. O. Box 165, Mail Code: Zone 1
New Hill, North Carolina 27562-0165
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - SHEARO...
August 27, 2003
Florida Power and Light Company
ATTN: Mr. J. A. Stall, Senior Vice President
Nuclear and Chief Nuclear Officer
P. O. Box 14000
Juno Beach, FL 33408-0420
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - TURKEY
POINT NUCLEAR PLANT
Dear Mr. Stall:...
Waterford 3
4Q/2009 Performance Indicators
Licensee's General Comments: none
Licensee Comments: none
Unplanned Scrams per 7000 Critical Hrs 1Q/08 2Q/08 3Q/08 4Q/08 1Q/09 2Q/09 3Q/09 4Q/09
Unplanned scrams 0 0 0 0 0 0 0 1.0
Critical hours 2183.0 1...
Byron 2
3Q/2013 Plant Inspection Findings
Initiating Events
Significance: Sep 27, 2013
Identified By: NRC
Item Type: NCV NonCited Violation
INADEQUATE IDENTIFICATION OF FIRE CURTAIN SPRINKLER DEGRADATION FOR AN
AUXILIARY BUILDING STAIRWELL
The inspectors identified...
U.S. Nuclear Regulatory Commission
Operations Center
Event Reports For
08/01/2000 - 08/02/2000
** EVENT NUMBERS **
37166 37199 37201 3...
August 30, 2004
Carolina Power and Light Company
ATTN: Mr. John W. Moyer
Vice President
H. B. Robinson Steam Electric
Plant, Unit 2
3851 West Entrance Road
Hartsville, SC 29550
SUBJECT: MID-CYCLE PERFORMANCE REVIEW AND INSPECTION PLAN - H. B.
ROBINSON STEAM ELECTRIC PLA...
Issue Date: 11/27/01 B-1 87112, Appendix B
APPENDIX B
IRRADIATOR INSPECTION REFERENCES
1. ORGANIZATION AND SCOPE OF PROGRAM
License application and applicable license conditions.
2. MANAGEMENT OVERSIGHT
A. Radiation Safety Committee.
Applicable license conditions.
B....
June 12, 2001
MEMORANDUM
TO:
William D. Travers
Executive Director for Operations
FROM: Annette L. Vietti-Cook, Secretary /RA/
SUBJECT: STAFF REQUIREMENTS - SECY-01-0075 - DENIAL OF PETITION TO AMEND FINANCIAL ASSURANCE REQUIREMENTS FOR DECOMMISSIONING
NUCLEAR POWER ...
POLICY ISSUE
NOTATION VOTE
SECY-01-0030
February 26, 2001
FOR: The Commissioners
FROM: William D. Travers
Executive Director for Operations
SUBJECT: REPORT TO CONGRESS ON ABNORMAL OCCURRENCES FOR FISCAL YEAR 2000
PURPOSE:
DISCUSSION:
COORDINATION:
RECOMMENDATION:
PURP...