License Application
for the American Centrifuge Plant
in Piketon, Ohio
Revision 0
Docket No. 70-7004 August 2004
Information contained within
does not con...
Newly Closed - FY2008 (Monthly Update - 10/10/08)SubjectFOI/PA NumberDate Rec'd.Date ClosedResponse Publicly Available2007 FOIA Annual Report2008-013202/22/0802/26/08NoAccess to ML071430006, re: TRACE Code2008-015203/24/0804/01/08NoActive NRC licenses2008-006512/11/0701/04/08N...
August 10, 2000
Mr. Mark L. Marchi
Site Vice President
Kewaunee Plant
Wisconsin Public Service
Corporation
Post Office Box 19002
Green Bay, WI 54307-9002
SUBJECT: KEWAUNEE - NRC INSPECTION REPORT 50-305/2000013(DRS)
Dear Mr. Marchi:
On July 21, 2000, the NRC completed a ...
Turkey Point 3
1Q/2010 Plant Inspection Findings
Initiating Events
Significance: Dec 30, 2009
Identified By: NRC
Item Type: VIO Violation
Violation of Technical Specification 5.5.1.1 regarding Unit 3 spent fuel storage with degrading Boraflex poison
The inspectors i...
Farley 1
Initiating Events
Significance: May 28, 2000
Identified By: Self Disclosing
Item Type: NCV NonCited Violation
OPERATOR FAILURE TO FOLLOW PROCEDURE RESULTED IN AN AUTOMATIC REACTOR TRIP
The inspectors identified a non-cited violation for failure to follow the...
INFORMATION REPORT
March 12, 2010 SECY-10-0026
For: The Commissioners
From: Nader L. Mamish
Assistant for Operations
Office of the Executive Director for Operations
Subject: WEEKLY INFORMATION REPORT - WEEK ENDING
March 5, 2010
Contents Enclo...
Diablo Canyon 2
Initiating Events
Significance: Oct 06, 2001
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to perform a prompt operability assessment for an atmospheric dump valve
The inspectors identified a violation for the licensee's failure to prom...
On this page:
Break RequirementsQ1. Below is a proposed schedule that has a 3-week rotating cycle. This schedule runs 8 hours a day from 0800–1600. Would this schedule meet the 34-hour break period requirement?Calculation of Work HoursQ2. Should unpaid meetings between ...
Callaway
Initiating Events
Significance: Jan 12, 2001
Identified By: Self Disclosing
Item Type: NCV NonCited Violation
Inadvertent reactor protection system actuation.
During a trip actuating device operational test surveillance, maintenance personnel failed to compl...
Callaway
Initiating Events
Significance: Jan 12, 2001
Identified By: Self Disclosing
Item Type: NCV NonCited Violation
Inadvertent reactor protection system actuation.
During a trip actuating device operational test surveillance, maintenance personnel failed to compl...
Callaway
Initiating Events
Significance: Jan 12, 2001
Identified By: Self Disclosing
Item Type: NCV NonCited Violation
Inadvertent reactor protection system actuation.
During a trip actuating device operational test surveillance, maintenance personnel failed to compl...
Davis-Besse
2Q/2003 Plant Inspection Findings
Initiating Events
Significance: Jun 30, 2003
Identified By: NRC
Item Type: NCV NonCited Violation
FAILURE TO PROPERLY IMPLEMENT SYSTEM PROCEDURES DURING THE FILLING OF THE
CIRCULATING WATER SYSTEM
A self-revealing Non-C...
Davis-Besse
4Q/2003 Plant Inspection Findings
Initiating Events
Significance: Dec 19, 2003
Identified By: NRC
Item Type: NCV NonCited Violation
FAILURE TO FOLLOW DB-OP-00000, "CONDUCT OF OPERATIONS," REGARDING PRESENT PLANT
CONDITIONS AND UNDERSTANDING OF THE OPERAT...
SECY NOTE: THIS SECY PAPER TO BE RELEASED TO THE PUBLIC 5 WORKING
DAYS AFTER DISPATCH OF THE LETTER(S) TO CONGRESS
POLICY ISSUE
NOTATION VOTE
February 20, 2009 SECY-09-0029
FOR: The Commissioners
FROM: R. W. Borchardt
Executive Direct...
Diablo Canyon 1
Initiating Events
Significance: Oct 06, 2001
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to perform a prompt operability assessment for an atmospheric dump valve
The inspectors identified a violation for the licensee's failure to prom...
Diablo Canyon 1
Initiating Events
Significance: Oct 06, 2001
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to perform a prompt operability assessment for an atmospheric dump valve
The inspectors identified a violation for the licensee's failure to prom...
Diablo Canyon 2
Initiating Events
Significance: Oct 06, 2001
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to perform a prompt operability assessment for an atmospheric dump valve
The inspectors identified a violation for the licensee's failure to prom...
September 22, 2000
Harold B. Ray, Executive Vice President
Southern California Edison Co.
San Onofre Nuclear Generating Station
P.O. Box 128
San Clemente, California 92674-0128
SUBJECT: SAN ONOFRE NUCLEAR GENERATING STATION - NRC INSPECTION
REPORT NO. 50-361/00-09; 50-362/0...
UNITED STATES
NUCLEAR REGULATORY COMMISSION
REGION II
SAM NUNN ATLANTA FEDERAL CENTER
61 FORSYTH STREET SW SUITE 23T85
ATLANTA, GEORGIA 30303-8931
April 23, 2004
Tennessee Valley Authority
ATTN: Mr.J. A. Scalice
Chief Nuclear Officer and
Executive Vice President
6A Look...
March 17, 2005
Tennessee Valley Authority
ATTN: Mr. K. W. Singer
Chief Nuclear Officer and
Executive Vice President
6A Lookout Place
1101 Market Street
Chattanooga, TN 37402-2801
SUBJECT: WATTS BAR: NRC PROBLEM IDENTIFICATION AND RESOLUTION
INSPECTION REPORT NO. 0500...
January • February • March • April • May • June • July• August • September • October • November • DecemberThis page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.Dec...
Farley 2
Initiating Events
Significance: Aug 25, 2001
Identified By: NRC
Item Type: NCV NonCited Violation
Failure to Properly Establish the Initial Conditions for the Unit 2 Feedwater Level Control System Switches
The failure to properly establish the initial condit...
INFORMATION REPORT
May 15, 2003 SECY-03-0076
For: The Commissioners
From: William M. Dean, Assistant for Operations, Office of the EDO
Subject: SECY-03-0076 WEEKLY INFORMATION REPORT - WEEK
ENDING MAY 9, 2003
Contents Enclosure
Nuclear Reactor Regulatio...
U.S. Nuclear Regulatory CommissionOperations Center Event Reports For01/17/2014 - 01/21/2014 ** EVENT NUMBERS ** 496134971149720497354973649738497394974049741497424974349744497454974649747 !!!!! THIS EVENT HAS BEEN RETRACTED. THIS EVENT HAS BEEN RETRACTED !!!!! Power Reacto...
August 27, 2002
The Honorable James M. Jeffords, Chairman
Committee on Environment and Public Works
United States Senate
Washington, D.C. 20510
Dear Mr. Chairman:
I am writing to express the NRC’s appreciation for the Committee’s interest in enhancing
security at the Nati...