Skip to main content

NUREG-1555 Ch.9 Alternatives to the Proposed Action

Environmental Standard Review Plan: Standard Review Plans for Environmental Reviews for Nuclear Power Plants — Alternatives to the Proposed Action (NUREG-1555, Chapter 9)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

SectionTitleRev.Date Updated
9.0Alternatives to the Proposed ActionRev. 003/2000
9.1No-Action AlternativeRev. 003/2000
9.2Energy AlternativesRev. 003/2000
9.2.1Alternatives Not Requiring New Generating CapacityDraft Rev. 107/2007
Rev. 003/2000
9.2.2Alternatives Requiring New Generating CapacityDraft Rev. 107/2007
Rev. 003/2000
9.2.3Assessment of Alternative Energy Sources and SystemsDraft Rev. 107/2007
Rev. 003/2000
9.3Alternative Sites 
Note that Rev 1 for Section 9.3 is a complete Rewrite from the previous version. Therefore changes in this section are not indicated by highlighted text as is for the other ESRP sections.
Draft Rev. 107/2007
Rev. 003/2000
9.4Alternative Plant and Transmission SystemsRev. 003/2000
9.4.1Heat Dissipation SystemsDraft Rev. 107/2007
Rev. 003/2000
9.4.2Circulating Water SystemsDraft Rev. 107/2007
Rev. 003/2000
9.4.3Transmission SystemsDraft Rev. 107/2007
Rev. 003/2000

Page Last Reviewed/Updated Friday, August 21, 2026

Page Last Reviewed/Updated Friday, August 21, 2026