Skip to main content

Alert

Due to a lapse in appropriations, the NRC has ceased normal operations. However, excepted and exempted activities necessary to maintain critical health and safety functions—as well as essential progress on designated critical activities, including those specified in Executive Order 14300—will continue, consistent with the OMB-Approved NRC Lapse Plan.

Spotlight

Environmental Standard Review Plan: StandardReview Plans for Environmental Reviews for Nuclear Power Plants — Environmental Impacts of Construction (NUREG-1555, Chapter 4)

This page includes links to files in non-HTML format. See Plugins, Viewers, and Other Tools for more information.

Section Title Rev. Date Updated
4.0 Environmental Impacts of Construction Rev. 0 03/2000
4.1 Land-Use Impacts Rev. 0 03/2000
4.1.1 The Site and Vicinity Draft Rev. 1 07/2007
Rev. 0 03/2000
4.1.2 Transmission Corridors and Offsite Areas Draft Rev. 1 07/2007
Rev. 0 03/2000
4.1.3 Historic Properties Rev. 0 03/2000
4.2 Water-Related Impacts Rev. 0 03/2000
4.2.1 Hydrologic Alterations Rev. 0 03/2000
4.2.2 Water-Use Impacts Rev. 0 03/2000
4.3 Ecological Impacts Rev. 1 04/2009
Rev. 0 03/2000
4.3.1 Terrestrial Ecosystems Draft Rev. 1 07/2007
Rev. 0 03/2000
4.3.2 Aquatic Ecosystems Draft Rev. 1 07/2007
Rev. 0 03/2000
4.4 Socioeconomic Impacts Rev. 0 03/2000
4.4.1 Physical Impacts Rev. 0 03/2000
4.4.2 Social and Economic Impacts Rev. 0 03/2000
4.4.3 Environmental Justice Impacts Draft Rev. 1 07/2007
Rev. 0 03/2000
4.5 Radiation Exposure to Construction Workers Rev. 0 03/2000
4.6 Measures and Controls to Limit Adverse Impacts During Construction Draft Rev. 1 07/2007
Rev. 0 03/2000
4.7 Cumulative Impacts Related to Construction Activities Draft Rev. 0 07/2007

Page Last Reviewed/Updated Thursday, March 25, 2021

Page Last Reviewed/Updated Thursday, March 25, 2021